Le Construction Inc
- Based in
- Oakland
- On San Francisco permits
- Apr 2000 to Jul 2023
- Last 24 months
- 0 permits filed
70 permits since 2000: 62 completed, 3 never finaled, 5 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
7 stairs permits: 7 completed. Typically 1 days from filing to permit and 280 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 31, 2023 | Completed final sign-off Jun 2024 | 921 Randolph St | modify front stair, add 2 exterior doorsDetails
modify front stair, add 2 exterior doors | $20,000 |
| Mar 17, 2016 | Completed final sign-off Jul 2016 | 4166 24th St | replace rear stair damage by dry rot in kind.Details
replace rear stair damage by dry rot in kind. | $12,000 |
| Dec 7, 2010 | Completed final sign-off Dec 2010 | 977 Folsom St | replace exterior rear stair in kind to complaint 201073287 by housing inspection dated 10-20-10Details
replace exterior rear stair in kind to complaint 201073287 by housing inspection dated 10-20-10 | $8,000 |
| Sep 22, 2008 | Completed final sign-off May 2009 | 1983 08th Av | replace 50% of extg exterior stairway in kind. same design and material in front of bldg. replace all extg wndw with vinyl frame. window same size. replace extg stucco siding and repair dry-rotDetails
replace 50% of extg exterior stairway in kind. same design and material in front of bldg. replace all extg wndw with vinyl frame. window same size. replace extg stucco siding and repair dry-rot | $35,000 |
| Aug 13, 2008 | Completed final sign-off May 2009 | 1983 08th Av | repair and replace portion of (e) exterior stairway in kind of same design and same material (50% replacement)Details
repair and replace portion of (e) exterior stairway in kind of same design and same material (50% replacement) | $9,000 |
| Jul 29, 2008 | Completed final sign-off May 2009 | 1983 08th Av | remodel (e) basement. 2 new bedrooms 1 full bathroom,1 storage room, upgrade stairway to basement, new utility room 2 (n) windows and (n) foundation.Details
remodel (e) basement. 2 new bedrooms 1 full bathroom,1 storage room, upgrade stairway to basement, new utility room 2 (n) windows and (n) foundation. | $116,000 |
| Jul 12, 2005 | Completed final sign-off Jun 2006 | 940 Randolph St | repair stucco and stair per plan.Details
repair stucco and stair per plan. | $9,000 |