Back to kitchen remodel contractors
Le Construction Inc
- Based in
- Oakland
- On San Francisco permits
- Apr 2000 to Jul 2023
- Last 24 months
- 0 permits filed
70 permits since 2000: 62 completed, 3 never finaled, 5 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
12 kitchen remodel permits: 10 completed, 1 never finaled, 1 expired or cancelled. Typically 2 days from filing to permit and 170 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 13, 2020 | Expired or cancelled cancelled Jan 2026 | 1071 Valencia St | voluntary replace kitchen hood & duct for fire safety.Details
voluntary replace kitchen hood & duct for fire safety. | $15,000 |
| Dec 30, 2019 | Completed final sign-off May 2020 | 2724 36th Av | 1st flr garage -replace bathroom vanity sink, replace furnace w/ 80% effic 80k btu. 2nd flr -kitchen replace 7 ft cabinet, kitchen sink, retile bathroom, replace shower pan, vanity sink, electrical upgrade (e) metero to 100 amp and upgrade (n) wire for house, reroofing. no removal of wallsDetails
1st flr garage -replace bathroom vanity sink, replace furnace w/ 80% effic 80k btu. 2nd flr -kitchen replace 7 ft cabinet, kitchen sink, retile bathroom, replace shower pan, vanity sink, electrical upgrade (e) metero to 100 amp and upgrade (n) wire for house, reroofing. no removal of walls | $25,000 |
| Oct 28, 2016 | Completed final sign-off Dec 2016 | 196 19th Av | kitchen remodel: replace kitchen cabinet, replace kitchen plumbing fixture, upgrade electrical for kitchen, replace water heater.Details
kitchen remodel: replace kitchen cabinet, replace kitchen plumbing fixture, upgrade electrical for kitchen, replace water heater. | $7,500 |
| Oct 28, 2013 | Completed final sign-off Apr 2014 | 530 Valencia St | repair fire damage at right side of bldg as is. reinstall kitchen for 534 valencia st . repair flooring, repair roofing, repair damaged frame, reconstruct as extg.Details
repair fire damage at right side of bldg as is. reinstall kitchen for 534 valencia st . repair flooring, repair roofing, repair damaged frame, reconstruct as extg. | $30,000 |
| Mar 11, 2013 | Completed final sign-off Mar 2014 | 24 Sylvan Dr | garage level-add new family room, 1 bathroom with closet. convert doot to window. 2nd floor-remodel kitchen & (e) bathroom. replace exist. furance.Details
garage level-add new family room, 1 bathroom with closet. convert doot to window. 2nd floor-remodel kitchen & (e) bathroom. replace exist. furance. | $39,000 |
| Jan 2, 2013 | Completed final sign-off Mar 2013 | 1370 Sloat Bl | remodel kitchen & replace kitchen cabinets plumbing fixture upgrade electrical new electrical lighting fixtures in bathroom,replace plumbing fixture new floor tile, one window for bathroom at rear house.Details
remodel kitchen & replace kitchen cabinets plumbing fixture upgrade electrical new electrical lighting fixtures in bathroom,replace plumbing fixture new floor tile, one window for bathroom at rear house. | $8,000 |
| Aug 28, 2012 | Completed final sign-off Oct 2012 | 1482 34th Av | replace (e) window to be fiberglass milgard window at front and milgard vinyl window at side and rear. kitchen: replace kitchen cabinets, plumbing fixture, upgrade electrical for kitchen. replace house trap and damage sewer line.Details
replace (e) window to be fiberglass milgard window at front and milgard vinyl window at side and rear. kitchen: replace kitchen cabinets, plumbing fixture, upgrade electrical for kitchen. replace house trap and damage sewer line. | $7,500 |
| Oct 13, 2010 | Completed final sign-off Sep 2011 | 530 Valencia St | revision to pa #200706265131 - relocte bar area, relocate door at kitchen, install windows @ hallway to restroom.Details
revision to pa #200706265131 - relocte bar area, relocate door at kitchen, install windows @ hallway to restroom. | $15,000 |
| Jul 30, 2010 | Completed final sign-off Sep 2011 | 530 Valencia St | mechnaical work to install one split type heatpump, kitchen exhaust fan and makeup air fan. (ref: bulding, permit app#201001074349 and 200706265131) work includes a type i hoodDetails
mechnaical work to install one split type heatpump, kitchen exhaust fan and makeup air fan. (ref: bulding, permit app#201001074349 and 200706265131) work includes a type i hood | $25,000 |
| May 5, 2010 | Completed final sign-off Nov 2010 | 921 Randolph St | first flr. add 1-full bathrm., convert storage room into entertaiment rm. reading rm. & fam. rm. relocate w/h & furn. 2nd. flr. remove fireplace, add 1-full bath, add wall to build a hall, add wall to separate din. rm. & liv. rm. remodel kitchen & bathrm.Details
first flr. add 1-full bathrm., convert storage room into entertaiment rm. reading rm. & fam. rm. relocate w/h & furn. 2nd. flr. remove fireplace, add 1-full bath, add wall to build a hall, add wall to separate din. rm. & liv. rm. remodel kitchen & bathrm. | $35,000 |
| Nov 17, 2008 | Completed final sign-off May 2009 | 1983 08th Av | refer to app #200807297901. remodeling extg kitchen. replace extg plaster with 1/2" gypboard on 2nd story wall(interior only only and ceiling. seismic strengthening as required per sfbc sec 3403.2.3.2.2, 3403.5, 1604.11Details
refer to app #200807297901. remodeling extg kitchen. replace extg plaster with 1/2" gypboard on 2nd story wall(interior only only and ceiling. seismic strengthening as required per sfbc sec 3403.2.3.2.2, 3403.5, 1604.11 | $30,000 |
| Aug 1, 2008 | Never finaled issued Aug 2008, no final | 977 Folsom St | additional washer and dryer in kitchen and shower in bathroom. revision to approved plan per app #200804170014Details
additional washer and dryer in kitchen and shower in bathroom. revision to approved plan per app #200804170014 | $2,500 |