Back to kitchen remodel contractors
Lake Marine Construction Inc
- Based in
- Clearlake
- On San Francisco permits
- Dec 2016 to May 2021
- Last 24 months
- 0 permits filed
18 permits since 2000: 14 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 10 days from filing to permit and 156 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 11, 2021 | Completed final sign-off Nov 2021 | 322 Virginia Av | kitchen remodel. replace plumbing, electrical, insulation, drywall. flooring, appliances, fixtures. no structural work to be doneDetails
kitchen remodel. replace plumbing, electrical, insulation, drywall. flooring, appliances, fixtures. no structural work to be done | $21,000 |
| Mar 29, 2021 | Completed final sign-off Oct 2021 | 3032 Baker St | kitchen and bathroom renovation. replace cabinets, appliances, finishes and new electrical sub panel.Details
kitchen and bathroom renovation. replace cabinets, appliances, finishes and new electrical sub panel. | $48,000 |
| Sep 16, 2019 | Completed final sign-off Dec 2019 | 627 Castro St | kitchen and bathroom remodel, replace plumbing and electrical fixtures, instlal new cabinets, flooring, insulation, drywall. no structural loak bearing walls to be distrub or remove.Details
kitchen and bathroom remodel, replace plumbing and electrical fixtures, instlal new cabinets, flooring, insulation, drywall. no structural loak bearing walls to be distrub or remove. | $50,000 |
| Jun 2, 2017 | Completed final sign-off Jul 2019 | 473 Diamond St | relocate kitchen, remove interior wall & install new beams & posts.Details
relocate kitchen, remove interior wall & install new beams & posts. | $40,000 |