Back to bathroom remodel contractors
Lake Marine Construction Inc
- Based in
- Clearlake
- On San Francisco permits
- Dec 2016 to May 2021
- Last 24 months
- 0 permits filed
18 permits since 2000: 14 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 5 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 174 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 29, 2021 | Completed final sign-off Oct 2021 | 3032 Baker St | kitchen and bathroom renovation. replace cabinets, appliances, finishes and new electrical sub panel.Details
kitchen and bathroom renovation. replace cabinets, appliances, finishes and new electrical sub panel. | $48,000 |
| Oct 9, 2020 | Completed final sign-off Apr 2021 | 2164 Hyde St | unit 1. remodeling of 2 bathrooms including replacing plumbing and plumbing fixtures, cabinets and counter tops, tiling, rewiring electrical fixtures, replacing doors for bedroom, bathroom and closet with sliding doors, painters and trim work.Details
unit 1. remodeling of 2 bathrooms including replacing plumbing and plumbing fixtures, cabinets and counter tops, tiling, rewiring electrical fixtures, replacing doors for bedroom, bathroom and closet with sliding doors, painters and trim work. | $48,000 |
| Jan 15, 2020 | Never finaled issued Jan 2020, no final | 457 Diamond St | two bath remodel in main house, replace electrical & plumbing fixtures, insulation, drywall, flooring, sturctural wall to remain as is. sewer pipe line replacement. same layout.Details
two bath remodel in main house, replace electrical & plumbing fixtures, insulation, drywall, flooring, sturctural wall to remain as is. sewer pipe line replacement. same layout. | $23,000 |
| Sep 16, 2019 | Completed final sign-off Dec 2019 | 627 Castro St | kitchen and bathroom remodel, replace plumbing and electrical fixtures, instlal new cabinets, flooring, insulation, drywall. no structural loak bearing walls to be distrub or remove.Details
kitchen and bathroom remodel, replace plumbing and electrical fixtures, instlal new cabinets, flooring, insulation, drywall. no structural loak bearing walls to be distrub or remove. | $50,000 |
| Jul 14, 2017 | Completed final sign-off Jan 2020 | 62 Tioga Av | horizontal addition. 1-story tal addition at rear yard. add new half bath and washer/dryer.Details
horizontal addition. 1-story tal addition at rear yard. add new half bath and washer/dryer. | $120,000 |
| Mar 30, 2017 | Completed final sign-off Jul 2018 | 263 Missouri St | convert a portion of existing 1st floor area to additional conditioned space to include family room, master bedroom with bath and study, new windows and doors at 1 st fl rear and window at 1st fl frontDetails
convert a portion of existing 1st floor area to additional conditioned space to include family room, master bedroom with bath and study, new windows and doors at 1 st fl rear and window at 1st fl front | $150,000 |
| Dec 15, 2016 | Expired or cancelled expired Jul 2019 | 475 Diamond St | two bathrooms remodel including replacing tile, plumbing and electrical fixtures, no structual work to be doneDetails
two bathrooms remodel including replacing tile, plumbing and electrical fixtures, no structual work to be done | $15,000 |