Back to kitchen remodel contractors
L T Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2019 to Jul 2026
- Last 24 months
- 7 permits filed
19 permits since 2000: 17 completed, 1 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 0 days from filing to permit and 169 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 12, 2025 | Completed final sign-off Jul 2026 | 24 Presidio Av | in kind remodel for 2 bathrooms and kitchen. new vanity. demo kitchen cabinet and install new cabinet, new countertop and appliances, new sink. all work in-kindDetails
in kind remodel for 2 bathrooms and kitchen. new vanity. demo kitchen cabinet and install new cabinet, new countertop and appliances, new sink. all work in-kind | $100,000 |
| Dec 4, 2025 | Completed final sign-off Dec 2025 | 2151 Jackson St | drywall 25 sq ft dinner ceiling in home repair, water damage, drywall 20sq ft kitchen ceiling, water damage, install railing back stairs of bldg. all repairs interior and non street facing.Details
drywall 25 sq ft dinner ceiling in home repair, water damage, drywall 20sq ft kitchen ceiling, water damage, install railing back stairs of bldg. all repairs interior and non street facing. | $2,000 |
| Jul 31, 2025 | Completed final sign-off Jan 2026 | 195 25th Av | remodeling (2) bathrooms: both tub to shower, new shower valves, new vanities and toilets. replaced kitchen counter top &sink. install new can lights in bathroom and new outlets. like for like. replace kitchen counter top and sink. install nee can lights in bathroom and new outlets. no layout changeDetails
remodeling (2) bathrooms: both tub to shower, new shower valves, new vanities and toilets. replaced kitchen counter top &sink. install new can lights in bathroom and new outlets. like for like. replace kitchen counter top and sink. install nee can lights in bathroom and new outlets. no layout change | $30,000 |
| Oct 4, 2023 | Completed final sign-off Dec 2023 | 2827 Laguna St | (1) bathroom remodel - bathtub, vanity, tiles. (1) kitchen remodel - replace countertops, sink, replace gfci outlets. non structuralDetails
(1) bathroom remodel - bathtub, vanity, tiles. (1) kitchen remodel - replace countertops, sink, replace gfci outlets. non structural | $30,000 |
| Sep 5, 2023 | Completed final sign-off Apr 2024 | 701 Anza St | in kind kitchen remodel within existing walls and floor plan. replacing (e) cabinets and countertops, moving refrigerator, adding three cabinets. (e) doorways to remain as is, original sizes.Details
in kind kitchen remodel within existing walls and floor plan. replacing (e) cabinets and countertops, moving refrigerator, adding three cabinets. (e) doorways to remain as is, original sizes. | $43,500 |