L T Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2019 to Jul 2026
- Last 24 months
- 7 permits filed
19 permits since 2000: 17 completed, 1 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 1, 2026 | In progress issued Jul 2026 | 875 Lombard St | front bldg: top fl bathroom remodel like for like.Details
front bldg: top fl bathroom remodel like for like. | $25,000 |
| Dec 17, 2025 | Completed final sign-off Jun 2026 | 85 Cleary Ct | unit 5-remodel 2 bathrooms and repalce 2 shower valves and (n) vanity build. replace shower pan in kind.Details
unit 5-remodel 2 bathrooms and repalce 2 shower valves and (n) vanity build. replace shower pan in kind. | $36,000 |
| Dec 12, 2025 | Completed final sign-off Jul 2026 | 24 Presidio Av | in kind remodel for 2 bathrooms and kitchen. new vanity. demo kitchen cabinet and install new cabinet, new countertop and appliances, new sink. all work in-kindDetails
in kind remodel for 2 bathrooms and kitchen. new vanity. demo kitchen cabinet and install new cabinet, new countertop and appliances, new sink. all work in-kind | $100,000 |
| Dec 4, 2025 | Completed final sign-off Dec 2025 | 2151 Jackson St | drywall 25 sq ft dinner ceiling in home repair, water damage, drywall 20sq ft kitchen ceiling, water damage, install railing back stairs of bldg. all repairs interior and non street facing.Details
drywall 25 sq ft dinner ceiling in home repair, water damage, drywall 20sq ft kitchen ceiling, water damage, install railing back stairs of bldg. all repairs interior and non street facing. | $2,000 |
| Jul 31, 2025 | Completed final sign-off Jan 2026 | 195 25th Av | remodeling (2) bathrooms: both tub to shower, new shower valves, new vanities and toilets. replaced kitchen counter top &sink. install new can lights in bathroom and new outlets. like for like. replace kitchen counter top and sink. install nee can lights in bathroom and new outlets. no layout changeDetails
remodeling (2) bathrooms: both tub to shower, new shower valves, new vanities and toilets. replaced kitchen counter top &sink. install new can lights in bathroom and new outlets. like for like. replace kitchen counter top and sink. install nee can lights in bathroom and new outlets. no layout change | $30,000 |
| Mar 3, 2025 | Completed final sign-off May 2025 | 1302 Masonic Av | revision to no plan application pa#2025-0206-9826 addition of as is built vs proposed plan per building inspector's request built legalize full bath note: not removing an unwarrented living/dwelling unitDetails
revision to no plan application pa#2025-0206-9826 addition of as is built vs proposed plan per building inspector's request built legalize full bath note: not removing an unwarrented living/dwelling unit | |
| Feb 6, 2025 | Completed final sign-off May 2025 | 1302 Masonic Av | remodel/update approx 500 sf of storage space located on 1st fl. of building behind garage, no change to walls or layout. replace (e) drywall, install (n)flooring replace in kind ext. doors & window, remodel bathroom, in kind. replace sink, add insulation. remain storage spaceDetails
remodel/update approx 500 sf of storage space located on 1st fl. of building behind garage, no change to walls or layout. replace (e) drywall, install (n)flooring replace in kind ext. doors & window, remodel bathroom, in kind. replace sink, add insulation. remain storage space | $70,000 |
| Jul 17, 2024 | Completed final sign-off Aug 2024 | 2001 Mcallister St | unit 126- kithcen remodel to include replacing countertoops, new sink, outlets and remodel 2 bathrooms to include replace vanity. no wall removal.Details
unit 126- kithcen remodel to include replacing countertoops, new sink, outlets and remodel 2 bathrooms to include replace vanity. no wall removal. | $9,800 |
| May 10, 2024 | Expired or cancelled withdrawn Sep 2024 | 17 25th North Av | closet convert to laundery run electrical wire for dryer new water pipes for wahser and drain pipe adding new sinkDetails
closet convert to laundery run electrical wire for dryer new water pipes for wahser and drain pipe adding new sink | $12,000 |
| Feb 7, 2024 | Completed final sign-off Mar 2025 | 2924 Sacramento St | unit #3: response to nov# 202312651- to restore 3rd floor deck to original condition.Details
unit #3: response to nov# 202312651- to restore 3rd floor deck to original condition. | $2,500 |
| Dec 4, 2023 | Completed final sign-off Feb 2024 | 33 Coso Av | one bath remodel. non structural. remove all drywall, install new drywall. replace bath tub, vanity ,and tiles. adding light in bathDetails
one bath remodel. non structural. remove all drywall, install new drywall. replace bath tub, vanity ,and tiles. adding light in bath | $15,000 |
| Oct 4, 2023 | Completed final sign-off Jun 2024 | 598 Belvedere St | (2)bathroom remodels - remove bathtub - shower, vanity, install lights.non structural.Details
(2)bathroom remodels - remove bathtub - shower, vanity, install lights.non structural. | $35,000 |
| Oct 4, 2023 | Completed final sign-off Dec 2023 | 2827 Laguna St | (1) bathroom remodel - bathtub, vanity, tiles. (1) kitchen remodel - replace countertops, sink, replace gfci outlets. non structuralDetails
(1) bathroom remodel - bathtub, vanity, tiles. (1) kitchen remodel - replace countertops, sink, replace gfci outlets. non structural | $30,000 |
| Sep 5, 2023 | Completed final sign-off Apr 2024 | 701 Anza St | in kind kitchen remodel within existing walls and floor plan. replacing (e) cabinets and countertops, moving refrigerator, adding three cabinets. (e) doorways to remain as is, original sizes.Details
in kind kitchen remodel within existing walls and floor plan. replacing (e) cabinets and countertops, moving refrigerator, adding three cabinets. (e) doorways to remain as is, original sizes. | $43,500 |
| Apr 24, 2023 | Completed final sign-off Jul 2023 | 1980 Vallejo St | unit# 2: demo old cabinets and flooring - no changing layout. install new cabinets, new floor tiles, new coutertops, and paint.Details
unit# 2: demo old cabinets and flooring - no changing layout. install new cabinets, new floor tiles, new coutertops, and paint. | $15,000 |
| Feb 8, 2022 | Completed final sign-off Aug 2022 | 3630 Fillmore St | add a 45 min door to garage.Details
add a 45 min door to garage. | $2,500 |
| Dec 23, 2020 | Completed final sign-off Apr 2021 | 528 45th Av | remove (e) 4x8 header, replace with new 4x10 header. all work on 2nd floor.Details
remove (e) 4x8 header, replace with new 4x10 header. all work on 2nd floor. | $2,000 |
| Feb 6, 2020 | Completed final sign-off Sep 2020 | 3329 Scott St | remove e laundry area and add a full bath at 2nd fl bedroom. maher not reqDetails
remove e laundry area and add a full bath at 2nd fl bedroom. maher not req | $30,000 |
| Oct 10, 2019 | Completed final sign-off Dec 2019 | 804 Balboa St | adding corner sink to existing 1/2 bathroom ( less than 25 sq ft), adding 1 outlet next to toilet. replac wall tiles 4' in height, around 1/2 bath walls.Details
adding corner sink to existing 1/2 bathroom ( less than 25 sq ft), adding 1 outlet next to toilet. replac wall tiles 4' in height, around 1/2 bath walls. | $3,000 |