L O D Construction
- Based in
- Pescadero
- On San Francisco permits
- Mar 2020 to Sep 2026
- Last 24 months
- 10 permits filed
29 permits since 2000: 21 completed, 3 in progress, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 0 days from filing to permit and 142 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 27, 2025 | Completed final sign-off Jun 2025 | 174 Brewster St | replace stair lights add led stair lights, back yard fence repair slats as needed replace stair treadsDetails
replace stair lights add led stair lights, back yard fence repair slats as needed replace stair treads | $25,000 |
| Dec 27, 2023 | Completed final sign-off May 2024 | 29 Joy St | replace in kind of front entrance staircase and rear staircase material only - no structural change. repair water damage to drywall interior. retile guest bathroom. 50 percent or less in thisc ase - change of materials.Details
replace in kind of front entrance staircase and rear staircase material only - no structural change. repair water damage to drywall interior. retile guest bathroom. 50 percent or less in thisc ase - change of materials. | $35,000 |