Back to kitchen remodel contractors
L O D Construction
- Based in
- Pescadero
- On San Francisco permits
- Mar 2020 to Sep 2026
- Last 24 months
- 10 permits filed
29 permits since 2000: 21 completed, 3 in progress, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 8 completed, 1 never finaled, 1 expired or cancelled. Typically 12 days from filing to permit and 284 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 16, 2023 | Completed final sign-off Aug 2024 | 1674 17th Av | revision to permit # 202307252884: replace kitchen cabinets in kind, and lower bathroom remodels in kind.Details
revision to permit # 202307252884: replace kitchen cabinets in kind, and lower bathroom remodels in kind. | $15,000 |
| May 4, 2023 | Completed final sign-off Aug 2025 | 2227 Lombard St | remodel (2) units, bathrooms, kitchens, addition of lower room & bathrooms, additional (2) bathrooms-(1) each unit. no exterior facade work.Details
remodel (2) units, bathrooms, kitchens, addition of lower room & bathrooms, additional (2) bathrooms-(1) each unit. no exterior facade work. | $350,000 |
| Dec 21, 2022 | Completed final sign-off Jun 2025 | 2377 Greenwich St | kitchen, bathroom remodel, partition wall removal & addition split (e) bath to create 1/2 bath. replace 2 front windows in kind and 5 side windows. front window arched, double hung wood, original ogee locks, side vinyl replacment same size.Details
kitchen, bathroom remodel, partition wall removal & addition split (e) bath to create 1/2 bath. replace 2 front windows in kind and 5 side windows. front window arched, double hung wood, original ogee locks, side vinyl replacment same size. | $55,000 |
| Apr 5, 2022 | Completed final sign-off Dec 2022 | 1129 Clay St | remove walls between kitchens & living rooms on 2nd & 3rd fl.Details
remove walls between kitchens & living rooms on 2nd & 3rd fl. | $30,000 |
| Feb 23, 2022 | Expired or cancelled expired May 2026 | 835 Union St | interior remodel of single unit. remodel kitchen and bath. new living room with open floor plan to kitchen.Details
interior remodel of single unit. remodel kitchen and bath. new living room with open floor plan to kitchen. | $50,000 |
| Oct 25, 2021 | Completed final sign-off Dec 2022 | 1129 Clay St | remodel two kitchens and two bathrooms in kind, 1 each in each unit.Details
remodel two kitchens and two bathrooms in kind, 1 each in each unit. | $50,000 |
| Jun 28, 2021 | Completed final sign-off Dec 2021 | 423 Lyon St | revision to pa 2021-0318-6814 (zero plans) as builts. remove walls in the kitchen, bathroom, dining room, sun room and bathroomDetails
revision to pa 2021-0318-6814 (zero plans) as builts. remove walls in the kitchen, bathroom, dining room, sun room and bathroom | $20,000 |
| Mar 18, 2021 | Completed final sign-off Dec 2021 | 423 Lyon St | kitchen remodel in kind. remodel 2 bathrooms in kind.Details
kitchen remodel in kind. remodel 2 bathrooms in kind. | $30,000 |
| Sep 30, 2020 | Never finaled issued Sep 2020, no final | 571 14th Av | addition of hot/cold water supply & drain for use w/clothing washer/dryer in kitchen pantry areaDetails
addition of hot/cold water supply & drain for use w/clothing washer/dryer in kitchen pantry area | $7,590 |
| Mar 4, 2020 | Completed final sign-off Sep 2020 | 245 Laussat St | kitchen remodel: countertops, backsplashDetails
kitchen remodel: countertops, backsplash | $18,000 |