Back to kitchen remodel contractors
L M Preciado Construction
- Based in
- Martinez
- On San Francisco permits
- Aug 2017 to Jun 2018
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 16 days from filing to permit and 43 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 22, 2017 | Completed final sign-off Oct 2017 | 101 Gold Mine Dr | t.i. to lower floor of an (e) religious/institution to become a licensed child care center w/14 max children. child care is added as educational use (a-3 change to e). no change to upper floor. no change to (e) elect, lighting, hvac, plumbing, fire sprinkler. kitchen will not be accessible duringDetails
t.i. to lower floor of an (e) religious/institution to become a licensed child care center w/14 max children. child care is added as educational use (a-3 change to e). no change to upper floor. no change to (e) elect, lighting, hvac, plumbing, fire sprinkler. kitchen will not be accessible during | $6,000 |