L K Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2010 to Jun 2021
- Last 24 months
- 0 permits filed
32 permits since 2000: 28 completed, 4 never finaled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 4 completed. Typically 0 days from filing to permit and 138 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 20, 2015 | Completed final sign-off Feb 2015 | 4810 California St | to comply the complaint #201414381 - remove entire exterior wood utility ladder where is located at the top landing of rear stairs. replace one window at the bathroom.Details
to comply the complaint #201414381 - remove entire exterior wood utility ladder where is located at the top landing of rear stairs. replace one window at the bathroom. | $1,000 |
| Jul 22, 2013 | Completed final sign-off Feb 2014 | 247 Pixley St | repair back stair less than 50%.Details
repair back stair less than 50%. | $3,800 |
| Aug 27, 2012 | Completed final sign-off Nov 2012 | 251 14th St | to comply with physical inspection report application no. cc-5991; to repair the damaged rear stair less than 50% in-kind.Details
to comply with physical inspection report application no. cc-5991; to repair the damaged rear stair less than 50% in-kind. | $6,500 |
| Aug 17, 2011 | Completed final sign-off Mar 2012 | 1142 Munich St | replace stucco at front about 400 sf and dry rot repair at front stair less than 50% in-kind.Details
replace stucco at front about 400 sf and dry rot repair at front stair less than 50% in-kind. | $5,000 |