Back to bathroom remodel contractors
L K Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2010 to Jun 2021
- Last 24 months
- 0 permits filed
32 permits since 2000: 28 completed, 4 never finaled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
15 bathroom remodel permits: 14 completed, 1 never finaled. Typically 0 days from filing to permit and 74 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 20, 2015 | Completed final sign-off Feb 2015 | 4810 California St | to comply the complaint #201414381 - remove entire exterior wood utility ladder where is located at the top landing of rear stairs. replace one window at the bathroom.Details
to comply the complaint #201414381 - remove entire exterior wood utility ladder where is located at the top landing of rear stairs. replace one window at the bathroom. | $1,000 |
| Feb 26, 2014 | Completed final sign-off Jun 2014 | 30 Pasadena St | add (n) bedroom & bathroom on 1st floor. remodle kitchen & bathroom on 2nd floor.Details
add (n) bedroom & bathroom on 1st floor. remodle kitchen & bathroom on 2nd floor. | $31,000 |
| Dec 23, 2013 | Completed final sign-off Apr 2014 | 2272 Filbert St | paint the whole unit, remodel kitchen and one and a half bathroom, re-wire the unit. kitchen lighting - 5-% total wattage is high efficacy. bathroom lighting - high efficacy unless controlled by manuel on occupancy sensor.Details
paint the whole unit, remodel kitchen and one and a half bathroom, re-wire the unit. kitchen lighting - 5-% total wattage is high efficacy. bathroom lighting - high efficacy unless controlled by manuel on occupancy sensor. | $28,000 |
| Dec 18, 2013 | Never finaled issued Dec 2013, no final | 1852 28th Av | add & legalize 2 bedrooms and bathroom on 1/f. add new master bath on 2/f.Details
add & legalize 2 bedrooms and bathroom on 1/f. add new master bath on 2/f. | $38,000 |
| Oct 18, 2013 | Completed final sign-off Mar 2014 | 1852 28th Av | remodel kitchen & bathroom at 2/fDetails
remodel kitchen & bathroom at 2/f | $10,000 |
| Aug 5, 2013 | Completed final sign-off Oct 2013 | 2121 Laguna St | remodel kitchen an bathroom, painting, no alteration of partition wall, retile, replace cabinet & fixtures.Details
remodel kitchen an bathroom, painting, no alteration of partition wall, retile, replace cabinet & fixtures. | $12,000 |
| Jul 16, 2013 | Completed final sign-off Jul 2013 | 1750 Sutter St | unit #306:revision to app#2013.02.08.9762. delete closet in master bath. delete counter in kitchen and straight wall at master bedroom entrance.Details
unit #306:revision to app#2013.02.08.9762. delete closet in master bath. delete counter in kitchen and straight wall at master bedroom entrance. | |
| Jun 6, 2013 | Completed final sign-off Dec 2013 | 1750 Broadway | remodel apartment #2 full bathroomDetails
remodel apartment #2 full bathroom | $4,800 |
| May 23, 2013 | Completed final sign-off Oct 2013 | 741 09th Av | work on 3rd floor - minor remodel of bathroom, replace cabinets & counter in kitchen.Details
work on 3rd floor - minor remodel of bathroom, replace cabinets & counter in kitchen. | $18,000 |
| Feb 8, 2013 | Completed final sign-off Jul 2013 | 1750 Sutter St | unit #306 interior remodel:relocate closets, remodel extg master bath, replace cabinets in kitchen, and add new full bath. no work on all bearing walls and headers.Details
unit #306 interior remodel:relocate closets, remodel extg master bath, replace cabinets in kitchen, and add new full bath. no work on all bearing walls and headers. | $28,000 |
| Feb 8, 2013 | Completed final sign-off Apr 2013 | 2246 30th Av | remodel kitchen and one half bathroom. repair light well area. no change on walls.Details
remodel kitchen and one half bathroom. repair light well area. no change on walls. | $28,000 |
| Jan 7, 2013 | Completed final sign-off Mar 2013 | 1310 15th Av | remodel 2 master bedrooms with full bathroom at 2nd flr and 3rd flrDetails
remodel 2 master bedrooms with full bathroom at 2nd flr and 3rd flr | $7,500 |
| Sep 14, 2012 | Completed final sign-off Nov 2012 | 825 North Point St | remodel the kitchen (6'x7') & one full bathroom (5'x'7") replace four windows u factor less 0.4 replace in kind. replace gypsum boards. rewire all the electrical for this unit. lighting must comply w/ cec 150 (k).Details
remodel the kitchen (6'x7') & one full bathroom (5'x'7") replace four windows u factor less 0.4 replace in kind. replace gypsum boards. rewire all the electrical for this unit. lighting must comply w/ cec 150 (k). | $32,000 |
| Mar 12, 2012 | Completed final sign-off Jul 2012 | 1542 Sacramento St | remodel 1 bathroom and 1 kitchen. remove plaster sheet rock.Details
remodel 1 bathroom and 1 kitchen. remove plaster sheet rock. | $8,000 |
| Mar 23, 2011 | Completed final sign-off Apr 2011 | 1756 Alemany Bl | remodel 1 kitchen & 1 bathroom, rewire whole house electrical and upgrade service. no change walls or doors, lighting to comply cec150(k)Details
remodel 1 kitchen & 1 bathroom, rewire whole house electrical and upgrade service. no change walls or doors, lighting to comply cec150(k) | $11,000 |