Back to kitchen remodel contractors
L.G. Construction Co.,Inc
- Based in
- San Francsico
- On San Francisco permits
- Jan 2000 to Sep 2020
- Last 24 months
- 0 permits filed
65 permits since 2000: 52 completed, 8 never finaled, 5 expired or cancelled.
Of the 8 never-finaled permits, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
20 kitchen remodel permits: 17 completed, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 232 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 24, 2016 | Completed final sign-off Jun 2017 | 1831 Union St | unit #c: kitchen & bath only - remodeling works at topfloor rear of the building. remodeling exisitng kitchen, bathroom bedrooms, living room. replace exisitng widnows (keep (e) size), level existing floor & replace plywood.Details
unit #c: kitchen & bath only - remodeling works at topfloor rear of the building. remodeling exisitng kitchen, bathroom bedrooms, living room. replace exisitng widnows (keep (e) size), level existing floor & replace plywood. | $80,000 |
| Feb 23, 2016 | Completed final sign-off Aug 2016 | 1831 Union St | 1831: reconfiguration of 2nd floor interior remodel only. no fennistration or square footage. removing kitchen wall. relocate bathroom, create closet in bedroom add washer dryer combo. revision to permit 2016-01-12-6860Details
1831: reconfiguration of 2nd floor interior remodel only. no fennistration or square footage. removing kitchen wall. relocate bathroom, create closet in bedroom add washer dryer combo. revision to permit 2016-01-12-6860 | $25,000 |
| Feb 10, 2016 | Completed final sign-off Aug 2017 | 87 Morningside Dr | garage: install 91) family room (2) bedrooms, (1) bathroom; 2nd floor - remodel (e) kitchen and (e) bathroom, relocate 1 bathroom, replace all (e) windows, replace fireplace. relocate interior stair from 2nd floor to garage level.Details
garage: install 91) family room (2) bedrooms, (1) bathroom; 2nd floor - remodel (e) kitchen and (e) bathroom, relocate 1 bathroom, replace all (e) windows, replace fireplace. relocate interior stair from 2nd floor to garage level. | $65,000 |
| Jan 12, 2016 | Completed final sign-off Aug 2016 | 1831 Union St | apt #b - remodel one existing kitchen & 2 bathrooms. replace wall & ceiling board in bedrooms & living room.Details
apt #b - remodel one existing kitchen & 2 bathrooms. replace wall & ceiling board in bedrooms & living room. | $45,000 |
| Jul 9, 2015 | Completed final sign-off Dec 2015 | 50 Maywood Dr | remodel (e) kitchen, convert (e) closet into a toilet on ground floor, remodel (e) 23 baths, replace (e) 2 bathroom windowsDetails
remodel (e) kitchen, convert (e) closet into a toilet on ground floor, remodel (e) 23 baths, replace (e) 2 bathroom windows | $10,000 |
| Apr 18, 2014 | Expired or cancelled expired Dec 2016 | 2429 Bay St | interior remodeling - relocate one-bedroom, one bath & interior stairs at ground floor. relocate half bath, add central island, a 3 l.f. cabinets & 3.5 lf counter @ 2nd floor kitchen at 2nd floor. remodel 2 bths @ 3rd floor & repair stair handrail.Details
interior remodeling - relocate one-bedroom, one bath & interior stairs at ground floor. relocate half bath, add central island, a 3 l.f. cabinets & 3.5 lf counter @ 2nd floor kitchen at 2nd floor. remodel 2 bths @ 3rd floor & repair stair handrail. | $40,000 |
| Jul 3, 2012 | Completed final sign-off Oct 2013 | 1951 29th Av | remodel (e) kitchen, convert (e) bathroom & closet into 1 full bathroom & a toilet on 2nd floor, dry rot repair at rear deck. add 2 bedrooms, 1 full bathroom & a hallway at ground floorDetails
remodel (e) kitchen, convert (e) bathroom & closet into 1 full bathroom & a toilet on 2nd floor, dry rot repair at rear deck. add 2 bedrooms, 1 full bathroom & a hallway at ground floor | $35,000 |
| Sep 7, 2010 | Completed final sign-off Feb 2011 | 3001 26th Av | replace existing kitchen cabinets and countertop. keep existing ceiling and wallDetails
replace existing kitchen cabinets and countertop. keep existing ceiling and wall | $8,200 |
| May 27, 2010 | Completed final sign-off Feb 2011 | 2627 33rd Av | add (n) cabinets to (e) kitchen, remodel (e) toilet on 2nd. flr., relocate (e) full bath to match (e) garage to park 2-cars. reinforce (e) wood beam in order to remove some post @ ground flr.; add a.b. on (e) foundation in (e) ground floor @ garage area of perimeter wall.Details
add (n) cabinets to (e) kitchen, remodel (e) toilet on 2nd. flr., relocate (e) full bath to match (e) garage to park 2-cars. reinforce (e) wood beam in order to remove some post @ ground flr.; add a.b. on (e) foundation in (e) ground floor @ garage area of perimeter wall. | $35,000 |
| Jul 24, 2009 | Completed final sign-off Oct 2009 | 5 Rosemary Ct | (e) kitchen remodeling at second floor min 50% of kitchen lighting wattage shall be in high efficany light.Details
(e) kitchen remodeling at second floor min 50% of kitchen lighting wattage shall be in high efficany light. | $9,000 |
| Mar 30, 2009 | Completed final sign-off Mar 2010 | 2538 28th Av | 1st. flr.: remodel (2) bedrms., fam. rm. & bathrm. change furn. & w/h. replace dilapidited conc. slab. 2nd. flr.: remodel master bath & master bedrm., re-design location of (2) bedrms, a bathrm., kitchen voluntary seismic upgrading of residence. provide rear deck 3'-5" above grade.Details
1st. flr.: remodel (2) bedrms., fam. rm. & bathrm. change furn. & w/h. replace dilapidited conc. slab. 2nd. flr.: remodel master bath & master bedrm., re-design location of (2) bedrms, a bathrm., kitchen voluntary seismic upgrading of residence. provide rear deck 3'-5" above grade. | $95,000 |
| Sep 15, 2008 | Completed final sign-off May 2009 | 1675 33rd Av | rev. appl#200712049592 -kitchen remodel & (n) drywall on walls & ceiling. no change in lighting count.Details
rev. appl#200712049592 -kitchen remodel & (n) drywall on walls & ceiling. no change in lighting count. | |
| Aug 27, 2008 | Never finaled issued Aug 2008, no final | 115 Lakeshore Dr | remodel exist kitchen at 2nd floor w/ lighting changes. non structural. to meet title 24.Details
remodel exist kitchen at 2nd floor w/ lighting changes. non structural. to meet title 24. | $8,200 |
| Nov 9, 2006 | Completed final sign-off Oct 2007 | 756 24th Av | add rooms at g/f, remodel (e) kitchen, toilet and rear deck 2/f, remodel 2 baths, closet at 3/f, repair front stucco and replace all front and rear windows same kind, same size.Details
add rooms at g/f, remodel (e) kitchen, toilet and rear deck 2/f, remodel 2 baths, closet at 3/f, repair front stucco and replace all front and rear windows same kind, same size. | $50,000 |
| Oct 18, 2006 | Completed final sign-off Dec 2010 | 530 Crestlake Dr | adding 2nd flor master bed room & bbaths , 2 bed room and bath, remodel kitchen & exterior.Details
adding 2nd flor master bed room & bbaths , 2 bed room and bath, remodel kitchen & exterior. | $20,000 |
| May 13, 2005 | Completed final sign-off Dec 2005 | 147 Lakeshore Dr | remodel (e) 3 full bathroom & kitchen @ 2/f,flourescent lightingDetails
remodel (e) 3 full bathroom & kitchen @ 2/f,flourescent lighting | $48,000 |
| Apr 26, 2005 | Completed final sign-off Sep 2005 | 80 Morningside Dr | add rooms at ground fl: two bedrooms, family room full bath and laundry. remodel (e) kitchen andDetails
add rooms at ground fl: two bedrooms, family room full bath and laundry. remodel (e) kitchen and | $45,000 |
| Jan 24, 2005 | Completed final sign-off Mar 2005 | 1001 Pine St | replace kitchen cabinets,countertop,bathroom walls,floor tiles.keep bathtub.work on unit 1310 only.Details
replace kitchen cabinets,countertop,bathroom walls,floor tiles.keep bathtub.work on unit 1310 only. | $5,000 |
| Apr 21, 2003 | Completed final sign-off Jun 2003 | 190 Gellert Dr | kitchen remodel at 2nd fl. new cabinets, countertops, wall coverings, appliances&floor coverings.Details
kitchen remodel at 2nd fl. new cabinets, countertops, wall coverings, appliances&floor coverings. | $15,000 |
| Feb 2, 2000 | Expired or cancelled expired Oct 2001 | 101 Lombard St | kitchen remodeling in unit 103eDetails
kitchen remodeling in unit 103e | $6,500 |