Back to bathroom remodel contractors
L.G. Construction Co.,Inc
- Based in
- San Francsico
- On San Francisco permits
- Jan 2000 to Sep 2020
- Last 24 months
- 0 permits filed
65 permits since 2000: 52 completed, 8 never finaled, 5 expired or cancelled.
Of the 8 never-finaled permits, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
27 bathroom remodel permits: 24 completed, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 218 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 5, 2020 | Completed final sign-off Nov 2021 | 2989 23rd Av | remodel (e) bath and propose storage rm at lower and at 1st flr. (n) bathroom on 2nd flr. rearrange closet area in bedroom and enclose (e) opening ( not visible from street )Details
remodel (e) bath and propose storage rm at lower and at 1st flr. (n) bathroom on 2nd flr. rearrange closet area in bedroom and enclose (e) opening ( not visible from street ) | $60,000 |
| Aug 24, 2016 | Completed final sign-off Jun 2017 | 1831 Union St | unit #c: kitchen & bath only - remodeling works at topfloor rear of the building. remodeling exisitng kitchen, bathroom bedrooms, living room. replace exisitng widnows (keep (e) size), level existing floor & replace plywood.Details
unit #c: kitchen & bath only - remodeling works at topfloor rear of the building. remodeling exisitng kitchen, bathroom bedrooms, living room. replace exisitng widnows (keep (e) size), level existing floor & replace plywood. | $80,000 |
| Feb 23, 2016 | Completed final sign-off Aug 2016 | 1831 Union St | 1831: reconfiguration of 2nd floor interior remodel only. no fennistration or square footage. removing kitchen wall. relocate bathroom, create closet in bedroom add washer dryer combo. revision to permit 2016-01-12-6860Details
1831: reconfiguration of 2nd floor interior remodel only. no fennistration or square footage. removing kitchen wall. relocate bathroom, create closet in bedroom add washer dryer combo. revision to permit 2016-01-12-6860 | $25,000 |
| Feb 10, 2016 | Completed final sign-off Aug 2017 | 87 Morningside Dr | garage: install 91) family room (2) bedrooms, (1) bathroom; 2nd floor - remodel (e) kitchen and (e) bathroom, relocate 1 bathroom, replace all (e) windows, replace fireplace. relocate interior stair from 2nd floor to garage level.Details
garage: install 91) family room (2) bedrooms, (1) bathroom; 2nd floor - remodel (e) kitchen and (e) bathroom, relocate 1 bathroom, replace all (e) windows, replace fireplace. relocate interior stair from 2nd floor to garage level. | $65,000 |
| Jan 12, 2016 | Completed final sign-off Aug 2016 | 1831 Union St | apt #b - remodel one existing kitchen & 2 bathrooms. replace wall & ceiling board in bedrooms & living room.Details
apt #b - remodel one existing kitchen & 2 bathrooms. replace wall & ceiling board in bedrooms & living room. | $45,000 |
| Jul 9, 2015 | Completed final sign-off Dec 2015 | 50 Maywood Dr | remodel (e) kitchen, convert (e) closet into a toilet on ground floor, remodel (e) 23 baths, replace (e) 2 bathroom windowsDetails
remodel (e) kitchen, convert (e) closet into a toilet on ground floor, remodel (e) 23 baths, replace (e) 2 bathroom windows | $10,000 |
| Apr 18, 2014 | Expired or cancelled expired Dec 2016 | 2429 Bay St | interior remodeling - relocate one-bedroom, one bath & interior stairs at ground floor. relocate half bath, add central island, a 3 l.f. cabinets & 3.5 lf counter @ 2nd floor kitchen at 2nd floor. remodel 2 bths @ 3rd floor & repair stair handrail.Details
interior remodeling - relocate one-bedroom, one bath & interior stairs at ground floor. relocate half bath, add central island, a 3 l.f. cabinets & 3.5 lf counter @ 2nd floor kitchen at 2nd floor. remodel 2 bths @ 3rd floor & repair stair handrail. | $40,000 |
| Apr 3, 2014 | Never finaled issued Apr 2014, no final | 351 San Benito Wy | existing two bathroom remodeling at 1st fl and 2nd fl.Details
existing two bathroom remodeling at 1st fl and 2nd fl. | $32,000 |
| Dec 26, 2013 | Never finaled issued Dec 2013, no final | 287 Oxford St | to comply with complaint 20134451 - replace floor tiles at 2nd floor bathroomDetails
to comply with complaint 20134451 - replace floor tiles at 2nd floor bathroom | $1,000 |
| Jul 3, 2012 | Completed final sign-off Oct 2013 | 1951 29th Av | remodel (e) kitchen, convert (e) bathroom & closet into 1 full bathroom & a toilet on 2nd floor, dry rot repair at rear deck. add 2 bedrooms, 1 full bathroom & a hallway at ground floorDetails
remodel (e) kitchen, convert (e) bathroom & closet into 1 full bathroom & a toilet on 2nd floor, dry rot repair at rear deck. add 2 bedrooms, 1 full bathroom & a hallway at ground floor | $35,000 |
| Mar 13, 2012 | Completed final sign-off Jul 2012 | 858 32nd Av | remove existing toiletroom and install full bath at 2nd flDetails
remove existing toiletroom and install full bath at 2nd fl | $12,000 |
| Jun 14, 2011 | Completed final sign-off Sep 2011 | 143 Lakeshore Dr | remodel 2 bathrooms at 2nd floor and top floor.Details
remodel 2 bathrooms at 2nd floor and top floor. | $16,000 |
| May 9, 2011 | Completed final sign-off Aug 2013 | 459 32nd Av | revision to appl #201003118051s - add residential elevator. add home office & full bath at ground floor.Details
revision to appl #201003118051s - add residential elevator. add home office & full bath at ground floor. | $30,000 |
| May 27, 2010 | Completed final sign-off Feb 2011 | 2627 33rd Av | add (n) cabinets to (e) kitchen, remodel (e) toilet on 2nd. flr., relocate (e) full bath to match (e) garage to park 2-cars. reinforce (e) wood beam in order to remove some post @ ground flr.; add a.b. on (e) foundation in (e) ground floor @ garage area of perimeter wall.Details
add (n) cabinets to (e) kitchen, remodel (e) toilet on 2nd. flr., relocate (e) full bath to match (e) garage to park 2-cars. reinforce (e) wood beam in order to remove some post @ ground flr.; add a.b. on (e) foundation in (e) ground floor @ garage area of perimeter wall. | $35,000 |
| Mar 12, 2010 | Completed final sign-off Dec 2010 | 530 Crestlake Dr | revise (e) pa #200910209367: convert storage space in basement to living area w/(1) bedroom, 1/2 bath, full bath, billiard room & game room.Details
revise (e) pa #200910209367: convert storage space in basement to living area w/(1) bedroom, 1/2 bath, full bath, billiard room & game room. | $15,000 |
| Mar 30, 2009 | Completed final sign-off Mar 2010 | 2538 28th Av | 1st. flr.: remodel (2) bedrms., fam. rm. & bathrm. change furn. & w/h. replace dilapidited conc. slab. 2nd. flr.: remodel master bath & master bedrm., re-design location of (2) bedrms, a bathrm., kitchen voluntary seismic upgrading of residence. provide rear deck 3'-5" above grade.Details
1st. flr.: remodel (2) bedrms., fam. rm. & bathrm. change furn. & w/h. replace dilapidited conc. slab. 2nd. flr.: remodel master bath & master bedrm., re-design location of (2) bedrms, a bathrm., kitchen voluntary seismic upgrading of residence. provide rear deck 3'-5" above grade. | $95,000 |
| Dec 24, 2007 | Completed final sign-off May 2008 | 39 Meadowbrook Dr | remodel extg kitchn and bathroom at 2nd floorDetails
remodel extg kitchn and bathroom at 2nd floor | $19,500 |
| Nov 9, 2006 | Completed final sign-off Oct 2007 | 756 24th Av | add rooms at g/f, remodel (e) kitchen, toilet and rear deck 2/f, remodel 2 baths, closet at 3/f, repair front stucco and replace all front and rear windows same kind, same size.Details
add rooms at g/f, remodel (e) kitchen, toilet and rear deck 2/f, remodel 2 baths, closet at 3/f, repair front stucco and replace all front and rear windows same kind, same size. | $50,000 |
| Oct 18, 2006 | Completed final sign-off Dec 2010 | 530 Crestlake Dr | adding 2nd flor master bed room & bbaths , 2 bed room and bath, remodel kitchen & exterior.Details
adding 2nd flor master bed room & bbaths , 2 bed room and bath, remodel kitchen & exterior. | $20,000 |
| Aug 21, 2006 | Completed final sign-off Nov 2006 | 1675 33rd Av | 2nd floor (e) bathroom remodeling.Details
2nd floor (e) bathroom remodeling. | $5,000 |
| Jun 29, 2005 | Completed final sign-off Dec 2005 | 147 Lakeshore Dr | legalize rooms at grund gloor, family rm, full bath, storage and closet.Details
legalize rooms at grund gloor, family rm, full bath, storage and closet. | $8,000 |
| May 18, 2005 | Completed final sign-off Dec 2005 | 147 Lakeshore Dr | remodel e pull bathroom at ground floor. no structural workDetails
remodel e pull bathroom at ground floor. no structural work | $8,000 |
| May 13, 2005 | Completed final sign-off Dec 2005 | 147 Lakeshore Dr | remodel (e) 3 full bathroom & kitchen @ 2/f,flourescent lightingDetails
remodel (e) 3 full bathroom & kitchen @ 2/f,flourescent lighting | $48,000 |
| Apr 26, 2005 | Completed final sign-off Sep 2005 | 80 Morningside Dr | add rooms at ground fl: two bedrooms, family room full bath and laundry. remodel (e) kitchen andDetails
add rooms at ground fl: two bedrooms, family room full bath and laundry. remodel (e) kitchen and | $45,000 |
| Jan 24, 2005 | Completed final sign-off Mar 2005 | 1001 Pine St | replace kitchen cabinets,countertop,bathroom walls,floor tiles.keep bathtub.work on unit 1310 only.Details
replace kitchen cabinets,countertop,bathroom walls,floor tiles.keep bathtub.work on unit 1310 only. | $5,000 |
| Dec 29, 2003 | Completed final sign-off Apr 2004 | 169 Commonwealth Av | remodel full bath on 3rd fl. half bath on 2nd fl. replace sheetrock for liv rm ceiling.Details
remodel full bath on 3rd fl. half bath on 2nd fl. replace sheetrock for liv rm ceiling. | $9,000 |
| Aug 14, 2003 | Completed final sign-off Dec 2003 | 2 South Hill Bl | add rooms at the grd floor-exercise room. family room. master bed room and full bathDetails
add rooms at the grd floor-exercise room. family room. master bed room and full bath | $28,000 |