L E D Construction
- Based in
- Alameda
- On San Francisco permits
- May 2016 to Mar 2026
- Last 24 months
- 4 permits filed
16 permits since 2000: 7 completed, 2 in progress, 2 never finaled, 5 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 104 days from filing to permit and 91 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 27, 2016 | Completed final sign-off Dec 2016 | 205 Carl St | to comply with case #2016-000719 enf - window replacement at street facade-all (e) &(n) windows are"marvin wood ultrex"- 3 (e) 2nd flr windows replaced, 2 (e) windows at stair enclosure replaced - 3 (e) windows at 3rd flr replaced w/(n) dbl hung sash w/simu divided lites in upper sash.Details
to comply with case #2016-000719 enf - window replacement at street facade-all (e) &(n) windows are"marvin wood ultrex"- 3 (e) 2nd flr windows replaced, 2 (e) windows at stair enclosure replaced - 3 (e) windows at 3rd flr replaced w/(n) dbl hung sash w/simu divided lites in upper sash. | $5,000 |