Back to kitchen remodel contractors
L E D Construction
- Based in
- Alameda
- On San Francisco permits
- May 2016 to Mar 2026
- Last 24 months
- 4 permits filed
16 permits since 2000: 7 completed, 2 in progress, 2 never finaled, 5 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 1 completed, 1 expired or cancelled. Typically 12 days from filing to permit and 99 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 8, 2017 | Expired or cancelled expired Dec 2025 | 482 Belvedere St | interior remodel to 2/f & 3/f residential units of (e) 2 family residence. scope includes reconfiguration of 1/f partitions, bathroom, kitchen remodel, 4 (n) windows at rear, finishes, fixtures & infill of (e) secondary noncompliant stairwell at all floors. meps, l/s under sep permit as req'd.Details
interior remodel to 2/f & 3/f residential units of (e) 2 family residence. scope includes reconfiguration of 1/f partitions, bathroom, kitchen remodel, 4 (n) windows at rear, finishes, fixtures & infill of (e) secondary noncompliant stairwell at all floors. meps, l/s under sep permit as req'd. | $60,000 |
| Dec 22, 2016 | Completed final sign-off Apr 2017 | 37 Fairmount St | 2nd floor: remove portion of interior walls, remove extg kitchen, remove extg 2 windows and 1 door at rear yard. intall new beams,posts, footings and new kitchen. install 3 new windows and one door at rear yard.Details
2nd floor: remove portion of interior walls, remove extg kitchen, remove extg 2 windows and 1 door at rear yard. intall new beams,posts, footings and new kitchen. install 3 new windows and one door at rear yard. | $28,000 |