L Cabral Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2014 to Jun 2026
- Last 24 months
- 10 permits filed
71 permits since 2000: 52 completed, 6 in progress, 8 never finaled, 5 expired or cancelled.
Of the 8 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
5 stairs permits: 4 completed, 1 in progress. Typically 2 days from filing to permit and 441 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 19, 2025 | In progress issued Dec 2025 | 726 Lake St | replace deck post at rear stair in kind, replace trim and siding at front steps and throughout exterior per pest report, in kind. street visible repairs. contractor to provide pest report # 12810 per inspector request.Details
replace deck post at rear stair in kind, replace trim and siding at front steps and throughout exterior per pest report, in kind. street visible repairs. contractor to provide pest report # 12810 per inspector request. | $12,500 |
| Mar 27, 2024 | Completed final sign-off Sep 2024 | 62 Santa Ysabel Av | g/f: new 302 sq.ft will include a new bedroom and closet with new interior stairs to the 2/f. (1) new pair of doors and (1) window on rear g/f. the project will enclose 22 sq.ft of exterior space at the g/f below the existing 2/f.Details
g/f: new 302 sq.ft will include a new bedroom and closet with new interior stairs to the 2/f. (1) new pair of doors and (1) window on rear g/f. the project will enclose 22 sq.ft of exterior space at the g/f below the existing 2/f. | $85,000 |
| Feb 21, 2024 | Completed final sign-off Sep 2024 | 448 Gold Mine Dr | new deck in rear yard at 1/f with stair to yard. remove non-structural wall between family room & interior stair. infill 1/f at stair to yard. new office within (e) 1/f family room. new exterior door in (e) window opening. minor elec work. no plumb work. no increase in flr area. no street space req.Details
new deck in rear yard at 1/f with stair to yard. remove non-structural wall between family room & interior stair. infill 1/f at stair to yard. new office within (e) 1/f family room. new exterior door in (e) window opening. minor elec work. no plumb work. no increase in flr area. no street space req. | $50,000 |
| Oct 2, 2018 | Completed final sign-off Dec 2020 | 2867 Bryant St | the permit will replace in kind an existing failing deck & stairs at rear of home. existing unconditioned storage room below deck will be rebuilt in kind. windows & siding will be replaced on the rear of the home.Details
the permit will replace in kind an existing failing deck & stairs at rear of home. existing unconditioned storage room below deck will be rebuilt in kind. windows & siding will be replaced on the rear of the home. | $45,000 |
| Jul 8, 2015 | Completed final sign-off Jul 2017 | 20 Sea View Tr | demo create 3 new bathrooms, replace fixtures in powder room. remodel 2 extg baths, remodel kitchen, create new opening, create new stairs to basement, convert storage space to living space 180's new hydrolics/ flooring/ insulation/ windows/doorsDetails
demo create 3 new bathrooms, replace fixtures in powder room. remodel 2 extg baths, remodel kitchen, create new opening, create new stairs to basement, convert storage space to living space 180's new hydrolics/ flooring/ insulation/ windows/doors | $436,000 |