Back to kitchen remodel contractors
L Cabral Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2014 to Jun 2026
- Last 24 months
- 10 permits filed
71 permits since 2000: 52 completed, 6 in progress, 8 never finaled, 5 expired or cancelled.
Of the 8 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
16 kitchen remodel permits: 11 completed, 2 in progress, 3 never finaled. Typically 4 days from filing to permit and 234 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 16, 2026 | Completed final sign-off Sep 2026 | 44 Macondray Ln | unit 6e: replace finishes in powder room, replace kitchen counter tops and faucet, paint cabinets, replace kitchen lights, add recessed lights in three bedroooms, relocate electrical panel, install step lights, 2 bath fans. update plumbing as necessary. replace 2 bath cans.Details
unit 6e: replace finishes in powder room, replace kitchen counter tops and faucet, paint cabinets, replace kitchen lights, add recessed lights in three bedroooms, relocate electrical panel, install step lights, 2 bath fans. update plumbing as necessary. replace 2 bath cans. | $65,000 |
| Dec 16, 2025 | In progress issued Apr 2026 | 137 Lundys Ln | non-structural renovation of (e) kitchen. plumbing and electrical work to be performed. moving one window on rear of building and add siding to match (e).Details
non-structural renovation of (e) kitchen. plumbing and electrical work to be performed. moving one window on rear of building and add siding to match (e). | $35,000 |
| Sep 18, 2025 | In progress issued Oct 2025 | 1447 Thomas Av | 1st fl revision to pa # 202301130184: reduced size of bathroom and kitchen/dining.Details
1st fl revision to pa # 202301130184: reduced size of bathroom and kitchen/dining. | |
| Jun 1, 2023 | Completed final sign-off Sep 2026 | 2960 25th Av | 226 square foot ground & 2nd floor rear addition. remodel of existing 1st fl bedroom, laundry room and addition of full bathroom. remodel and addition to existing 2nd floor kitchen.Details
226 square foot ground & 2nd floor rear addition. remodel of existing 1st fl bedroom, laundry room and addition of full bathroom. remodel and addition to existing 2nd floor kitchen. | $120,000 |
| Oct 19, 2020 | Completed final sign-off Nov 2022 | 1371 Grove St | remodel (e) kitchen, expand opening between kitchen & living room.Details
remodel (e) kitchen, expand opening between kitchen & living room. | $22,400 |
| Apr 24, 2019 | Never finaled issued Apr 2019, no final | 3515 25th St | unit # 103, replace kitchen cabinets & countertop replace as kind, install gfi's in kitchenDetails
unit # 103, replace kitchen cabinets & countertop replace as kind, install gfi's in kitchen | $5,000 |
| Apr 4, 2019 | Completed final sign-off Nov 2019 | 1925 Gough St | remove kitchen cabinets and replace in kind. replace finishes on existing bathroom damaged by water-fire. repair floor/paint. maintain fire rating. no alter of walls, repair in kind.Details
remove kitchen cabinets and replace in kind. replace finishes on existing bathroom damaged by water-fire. repair floor/paint. maintain fire rating. no alter of walls, repair in kind. | $160,000 |
| Dec 20, 2018 | Completed final sign-off Aug 2019 | 1238 33rd Av | the project will remodel the extg kitchen and bathroom on the 2nd floor. openings on the rear will be replaced. a new deck will be added to the rear.Details
the project will remodel the extg kitchen and bathroom on the 2nd floor. openings on the rear will be replaced. a new deck will be added to the rear. | $153,000 |
| Apr 21, 2017 | Completed final sign-off Dec 2017 | 207 Cole St | relocate 1/2 bath, relocate laundry room. replace all finishes to existing kitchen. replace 4 windows (in-kind) and 1 ext door. remodel existing master bath. windows will be replaced w/ wood marvin brandDetails
relocate 1/2 bath, relocate laundry room. replace all finishes to existing kitchen. replace 4 windows (in-kind) and 1 ext door. remodel existing master bath. windows will be replaced w/ wood marvin brand | $250,000 |
| May 18, 2016 | Never finaled issued May 2016, no final | 31 Commonwealth Av | replace all finishes in master bath one shower one bath , same location, repalce all finishes, in kids bath, replace bathtub with shower stall. replace kitchen countertop ,add shelves, to kitchen,add 3 pendant lights to kitchenDetails
replace all finishes in master bath one shower one bath , same location, repalce all finishes, in kids bath, replace bathtub with shower stall. replace kitchen countertop ,add shelves, to kitchen,add 3 pendant lights to kitchen | $73,000 |
| May 16, 2016 | Completed final sign-off Apr 2017 | 2240 Hyde St | renovate 3 bathrooms, replace all finishes in (e) location. renovate (e) kitchen, add island, add washer/dryer room. upgrade electrical and plumbing, refinish (e) floor, paint entire floorDetails
renovate 3 bathrooms, replace all finishes in (e) location. renovate (e) kitchen, add island, add washer/dryer room. upgrade electrical and plumbing, refinish (e) floor, paint entire floor | $143,000 |
| Apr 22, 2016 | Completed final sign-off Oct 2016 | 448 Anderson St | remodel a kitchen and bathroom under previously approved app#201604154901. another half bathroom will be added to the 2nd fl. a new beam will be installed in the kitchen. 6 windows on the rear and 2 on the front will be replaced in kind.Details
remodel a kitchen and bathroom under previously approved app#201604154901. another half bathroom will be added to the 2nd fl. a new beam will be installed in the kitchen. 6 windows on the rear and 2 on the front will be replaced in kind. | $38,000 |
| Apr 15, 2016 | Never finaled issued Apr 2016, no final | 448 Anderson St | one kitchen & one bathroom remodel, includes sheetrock removal replace w/5/8 type x @property line walls voluntary sil plate bolting @ 4'.0 oc 5/8 diamater threader rod 8" min embedment w 3x3 sq plate washer install a35 clips 16 on center at top plaste lowest level only.Details
one kitchen & one bathroom remodel, includes sheetrock removal replace w/5/8 type x @property line walls voluntary sil plate bolting @ 4'.0 oc 5/8 diamater threader rod 8" min embedment w 3x3 sq plate washer install a35 clips 16 on center at top plaste lowest level only. | $40,000 |
| Dec 7, 2015 | Completed final sign-off Sep 2019 | 267 25th Av | add 2 units to (e) bldg per ordinance 30-15 ,sf soft story program. new units located at groudn fl. (e) upper 6 units will remodel kitchen & bath & add washer/dryer. all windows to be replaced in kind. remove (e) curb cut & add street tree. new nfpa-13 spriklers at entire bldg under separate permit.Details
add 2 units to (e) bldg per ordinance 30-15 ,sf soft story program. new units located at groudn fl. (e) upper 6 units will remodel kitchen & bath & add washer/dryer. all windows to be replaced in kind. remove (e) curb cut & add street tree. new nfpa-13 spriklers at entire bldg under separate permit. | $345,000 |
| Jul 8, 2015 | Completed final sign-off Jul 2017 | 20 Sea View Tr | demo create 3 new bathrooms, replace fixtures in powder room. remodel 2 extg baths, remodel kitchen, create new opening, create new stairs to basement, convert storage space to living space 180's new hydrolics/ flooring/ insulation/ windows/doorsDetails
demo create 3 new bathrooms, replace fixtures in powder room. remodel 2 extg baths, remodel kitchen, create new opening, create new stairs to basement, convert storage space to living space 180's new hydrolics/ flooring/ insulation/ windows/doors | $436,000 |
| Jun 11, 2015 | Completed final sign-off Oct 2015 | 20 Sea View Tr | exploratory demolition for future remodel permit for kitchen and 2 bathrooms, including brick fireplace removal.Details
exploratory demolition for future remodel permit for kitchen and 2 bathrooms, including brick fireplace removal. | $8,000 |