Back to kitchen remodel contractors
L Briseno Construction
- Based in
- Petaluma
- On San Francisco permits
- Jun 2018 to Jun 2026
- Last 24 months
- 6 permits filed
28 permits since 2000: 23 completed, 1 in progress, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 10 completed, 1 never finaled. Typically 0 days from filing to permit and 96 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 29, 2025 | Completed final sign-off Dec 2025 | 573 Connecticut St | remodel kitchen and two bathrooms keeping layout. like for like. install new sub panel. no moving walls. in-kind remodel. each bathroom approx. 40 sq ft. kitchen approx. 80 sq ft.Details
remodel kitchen and two bathrooms keeping layout. like for like. install new sub panel. no moving walls. in-kind remodel. each bathroom approx. 40 sq ft. kitchen approx. 80 sq ft. | $50,000 |
| Sep 5, 2024 | Completed final sign-off Oct 2024 | 238 Hearst Av | remodel kitchen & bathroom. no layout changes. install new electrical panel, no wall demolition or construction, no change in plumbing fixture count.Details
remodel kitchen & bathroom. no layout changes. install new electrical panel, no wall demolition or construction, no change in plumbing fixture count. | $60,000 |
| Oct 3, 2023 | Completed final sign-off Mar 2024 | 1776 Sacramento St | apt# 704: kitchen and 2 bathrooms renovation. same layout. install new carpet.Details
apt# 704: kitchen and 2 bathrooms renovation. same layout. install new carpet. | $60,000 |
| Sep 14, 2023 | Completed final sign-off Nov 2023 | 1497 Hudson Av | install new lower cabinets in kitchen, new countertop, new washer/dryer, move minor plmg and electric.Details
install new lower cabinets in kitchen, new countertop, new washer/dryer, move minor plmg and electric. | $10,000 |
| Jul 6, 2023 | Completed final sign-off Jan 2024 | 2461 Washington St | update 2 kitchens and one bathroom. install new electrical sub panel, minor plumbing work. like for likeDetails
update 2 kitchens and one bathroom. install new electrical sub panel, minor plumbing work. like for like | $50,000 |
| May 17, 2023 | Completed final sign-off Jul 2023 | 50 Quartz Wy | update kitchen & bathroom like for like. add new electric subpanel.Details
update kitchen & bathroom like for like. add new electric subpanel. | $50,000 |
| Dec 14, 2022 | Completed final sign-off Jan 2023 | 206 Nevada St | update kitchen & 2 bathrooms. new subpanel. install 13 led fixtures. install new tankless water heater. new furnace. paint inside & outside. install spiral staircase. new lvt flooring.Details
update kitchen & 2 bathrooms. new subpanel. install 13 led fixtures. install new tankless water heater. new furnace. paint inside & outside. install spiral staircase. new lvt flooring. | $50,000 |
| Dec 8, 2022 | Never finaled issued Dec 2022, no final | 446 Diamond St | revision to pa#202110261155. no new kitchen. layout to remain. comply with nov 202180450Details
revision to pa#202110261155. no new kitchen. layout to remain. comply with nov 202180450 | |
| Oct 26, 2021 | Completed final sign-off Dec 2022 | 446 Diamond St | convert ground floor living and bedroom area to accessory dwelling unit - 535 sq ft two bedrooms, one bath, provide (n) kitchen, and widen stairs access route.Details
convert ground floor living and bedroom area to accessory dwelling unit - 535 sq ft two bedrooms, one bath, provide (n) kitchen, and widen stairs access route. | $20,000 |
| Sep 23, 2021 | Completed final sign-off Dec 2021 | 68 Monterey Bl | replace cabinets, countertops, and flooring, fixtures in both units kitchens and bathrooms. total of 2 kitchens and 2 bathrooms. non structural.Details
replace cabinets, countertops, and flooring, fixtures in both units kitchens and bathrooms. total of 2 kitchens and 2 bathrooms. non structural. | $90,000 |
| Aug 23, 2021 | Completed final sign-off Dec 2021 | 475 Justin Dr | replace counterops and new tile work, new cabinets and paint in kitchen and 1 bathroom. in kind. no wall layout changes.Details
replace counterops and new tile work, new cabinets and paint in kitchen and 1 bathroom. in kind. no wall layout changes. | $30,000 |