Back to bathroom remodel contractors
L Briseno Construction
- Based in
- Petaluma
- On San Francisco permits
- Jun 2018 to Jun 2026
- Last 24 months
- 6 permits filed
28 permits since 2000: 23 completed, 1 in progress, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 14 completed. Typically 0 days from filing to permit and 76 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 29, 2025 | Completed final sign-off Dec 2025 | 573 Connecticut St | remodel kitchen and two bathrooms keeping layout. like for like. install new sub panel. no moving walls. in-kind remodel. each bathroom approx. 40 sq ft. kitchen approx. 80 sq ft.Details
remodel kitchen and two bathrooms keeping layout. like for like. install new sub panel. no moving walls. in-kind remodel. each bathroom approx. 40 sq ft. kitchen approx. 80 sq ft. | $50,000 |
| Oct 9, 2024 | Completed final sign-off Oct 2024 | 238 Hearst Av | ref 202409050141-replace (e) windows 12"x30" in kind with in the same opening located in bathroom. not visible from street.temper glazingDetails
ref 202409050141-replace (e) windows 12"x30" in kind with in the same opening located in bathroom. not visible from street.temper glazing | $800 |
| Sep 5, 2024 | Completed final sign-off Oct 2024 | 238 Hearst Av | remodel kitchen & bathroom. no layout changes. install new electrical panel, no wall demolition or construction, no change in plumbing fixture count.Details
remodel kitchen & bathroom. no layout changes. install new electrical panel, no wall demolition or construction, no change in plumbing fixture count. | $60,000 |
| Aug 2, 2024 | Completed final sign-off Oct 2024 | 2652 22nd St | update 2 existing bathrooms. install new subpanel (electric) and layout to remain. no removal of wallsDetails
update 2 existing bathrooms. install new subpanel (electric) and layout to remain. no removal of walls | $25,000 |
| Oct 3, 2023 | Completed final sign-off Mar 2024 | 1776 Sacramento St | apt# 704: kitchen and 2 bathrooms renovation. same layout. install new carpet.Details
apt# 704: kitchen and 2 bathrooms renovation. same layout. install new carpet. | $60,000 |
| Jul 6, 2023 | Completed final sign-off Jan 2024 | 2461 Washington St | update 2 kitchens and one bathroom. install new electrical sub panel, minor plumbing work. like for likeDetails
update 2 kitchens and one bathroom. install new electrical sub panel, minor plumbing work. like for like | $50,000 |
| May 31, 2023 | Completed final sign-off Aug 2023 | 2347 12th Av | convert laundry room to bathroom and closet. add sub panel.Details
convert laundry room to bathroom and closet. add sub panel. | $25,000 |
| May 17, 2023 | Completed final sign-off Jul 2023 | 50 Quartz Wy | update kitchen & bathroom like for like. add new electric subpanel.Details
update kitchen & bathroom like for like. add new electric subpanel. | $50,000 |
| Dec 14, 2022 | Completed final sign-off Jan 2023 | 206 Nevada St | update kitchen & 2 bathrooms. new subpanel. install 13 led fixtures. install new tankless water heater. new furnace. paint inside & outside. install spiral staircase. new lvt flooring.Details
update kitchen & 2 bathrooms. new subpanel. install 13 led fixtures. install new tankless water heater. new furnace. paint inside & outside. install spiral staircase. new lvt flooring. | $50,000 |
| Apr 14, 2022 | Completed final sign-off May 2022 | 122 Fair Oaks St | remodel bathroom- change out fixtures, flooring, tile- no showerDetails
remodel bathroom- change out fixtures, flooring, tile- no shower | $17,000 |
| Oct 26, 2021 | Completed final sign-off Dec 2022 | 446 Diamond St | convert ground floor living and bedroom area to accessory dwelling unit - 535 sq ft two bedrooms, one bath, provide (n) kitchen, and widen stairs access route.Details
convert ground floor living and bedroom area to accessory dwelling unit - 535 sq ft two bedrooms, one bath, provide (n) kitchen, and widen stairs access route. | $20,000 |
| Sep 23, 2021 | Completed final sign-off Dec 2021 | 68 Monterey Bl | replace cabinets, countertops, and flooring, fixtures in both units kitchens and bathrooms. total of 2 kitchens and 2 bathrooms. non structural.Details
replace cabinets, countertops, and flooring, fixtures in both units kitchens and bathrooms. total of 2 kitchens and 2 bathrooms. non structural. | $90,000 |
| Aug 23, 2021 | Completed final sign-off Dec 2021 | 475 Justin Dr | replace counterops and new tile work, new cabinets and paint in kitchen and 1 bathroom. in kind. no wall layout changes.Details
replace counterops and new tile work, new cabinets and paint in kitchen and 1 bathroom. in kind. no wall layout changes. | $30,000 |
| Jun 8, 2018 | Completed final sign-off May 2024 | 15 Woodland Av | work at lwr level garage to create larger storage and workroom with new bathroom, increased width & height of (e) garage door, retrofit (e) foundationDetails
work at lwr level garage to create larger storage and workroom with new bathroom, increased width & height of (e) garage door, retrofit (e) foundation | $120,000 |