Back to kitchen remodel contractors
L And P Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2000 to Dec 2024
- Last 24 months
- 1 permit filed
15 permits since 2000: 15 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 6 completed. Typically 12 days from filing to permit and 193 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 14, 2015 | Completed final sign-off Sep 2016 | 337 Union St | in-fill of lightwell on 2nd floor with room & skylight; reconfigure kitchen/utility & 2 bathrooms on 2nd floor (1 new bathroom) ; relocate secondary staircase from garage level to 2nd floor; new patio door on 3rd floorDetails
in-fill of lightwell on 2nd floor with room & skylight; reconfigure kitchen/utility & 2 bathrooms on 2nd floor (1 new bathroom) ; relocate secondary staircase from garage level to 2nd floor; new patio door on 3rd floor | $85,000 |
| May 14, 2014 | Completed final sign-off Oct 2014 | 266 28th Av | revision to 201304083979. kitchen remodel and field revision change railing to 1-hr. fire-rate parapet wall @ 42" high. document (e) & proposed height change.Details
revision to 201304083979. kitchen remodel and field revision change railing to 1-hr. fire-rate parapet wall @ 42" high. document (e) & proposed height change. | $19,000 |
| Apr 9, 2014 | Completed final sign-off Oct 2014 | 3233 Jackson St | master bedroom/bathroom remodel, kitchen/family room remodel, remove skylight & replace with new roof. remove glass blocks & replace with windows in lightwell, not visable from street. n/a ordinance #155-13.Details
master bedroom/bathroom remodel, kitchen/family room remodel, remove skylight & replace with new roof. remove glass blocks & replace with windows in lightwell, not visable from street. n/a ordinance #155-13. | $110,000 |
| Nov 15, 2013 | Completed final sign-off Jun 2014 | 222 28th Av | revision to app#201205039706. revision to exterior finish on the rear side. new window locations at kitchen (2)Details
revision to app#201205039706. revision to exterior finish on the rear side. new window locations at kitchen (2) | $2,000 |
| Nov 20, 2012 | Completed final sign-off Mar 2013 | 408 Urbano Dr | remodeling kitchen move cabinet, counter top, upgrade electrical , install cabinets & counter top install appliance no structural work .Details
remodeling kitchen move cabinet, counter top, upgrade electrical , install cabinets & counter top install appliance no structural work . | $8,000 |
| May 3, 2012 | Completed final sign-off Jun 2014 | 222 28th Av | expansion of family room on main floor. expansion of garage to match expansion of family room above (total new area is 160 sf). (n) deck on main floor w/ stair to rear yard. deck size 160 sf. remodel (e) kitchen.Details
expansion of family room on main floor. expansion of garage to match expansion of family room above (total new area is 160 sf). (n) deck on main floor w/ stair to rear yard. deck size 160 sf. remodel (e) kitchen. | $80,000 |