Back to bathroom remodel contractors
L And P Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2000 to Dec 2024
- Last 24 months
- 1 permit filed
15 permits since 2000: 15 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 7 completed. Typically 4 days from filing to permit and 141 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 9, 2024 | Completed final sign-off Nov 2025 | 771 Sweeny St | remodel (e) bathroom, add1 (n) full bathroom at 2/f. construct 2 bedroom, full bathroom, media room & install wetbar at g/f. (including in-fill under (e) bedroom.Details
remodel (e) bathroom, add1 (n) full bathroom at 2/f. construct 2 bedroom, full bathroom, media room & install wetbar at g/f. (including in-fill under (e) bedroom. | $158,000 |
| Oct 14, 2015 | Completed final sign-off Sep 2016 | 337 Union St | in-fill of lightwell on 2nd floor with room & skylight; reconfigure kitchen/utility & 2 bathrooms on 2nd floor (1 new bathroom) ; relocate secondary staircase from garage level to 2nd floor; new patio door on 3rd floorDetails
in-fill of lightwell on 2nd floor with room & skylight; reconfigure kitchen/utility & 2 bathrooms on 2nd floor (1 new bathroom) ; relocate secondary staircase from garage level to 2nd floor; new patio door on 3rd floor | $85,000 |
| Apr 9, 2014 | Completed final sign-off Oct 2014 | 3233 Jackson St | master bedroom/bathroom remodel, kitchen/family room remodel, remove skylight & replace with new roof. remove glass blocks & replace with windows in lightwell, not visable from street. n/a ordinance #155-13.Details
master bedroom/bathroom remodel, kitchen/family room remodel, remove skylight & replace with new roof. remove glass blocks & replace with windows in lightwell, not visable from street. n/a ordinance #155-13. | $110,000 |
| Feb 20, 2014 | Completed final sign-off Jun 2014 | 222 28th Av | remodel master bathroom & bathroom 2 on 2/f, remove 1 window, replace 1 window & add 1 window of same size. add type x gyp bd. finish to portions of existing garage level wall & ceiling.Details
remodel master bathroom & bathroom 2 on 2/f, remove 1 window, replace 1 window & add 1 window of same size. add type x gyp bd. finish to portions of existing garage level wall & ceiling. | $28,000 |
| Aug 26, 2013 | Completed final sign-off Dec 2013 | 2763 Yorba St | remodel one bathroom.Details
remodel one bathroom. | $5,000 |
| Dec 17, 2012 | Completed final sign-off Mar 2013 | 408 Urbano Dr | remodeling one bathroom.Details
remodeling one bathroom. | $10,000 |
| Oct 18, 2012 | Completed final sign-off Mar 2013 | 408 Urbano Dr | remodeling the bathroomDetails
remodeling the bathroom | $10,000 |