Back to kitchen remodel contractors
Kyvos Construction Inc
- Based in
- Pittsburg
- On San Francisco permits
- May 2019 to Mar 2025
- Last 24 months
- 1 permit filed
18 permits since 2000: 15 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 7 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 158 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 21, 2025 | Completed final sign-off Oct 2025 | 278 Niagara Av | kitchen remodel including new cabinets, appliances, counters, lighting, & finishes.Details
kitchen remodel including new cabinets, appliances, counters, lighting, & finishes. | $70,000 |
| May 12, 2021 | Completed final sign-off Jun 2021 | 19 Burlwood Dr | kitchen cabinet (only 2 cabinets reinstallation) new back splash new counter. flooring.Details
kitchen cabinet (only 2 cabinets reinstallation) new back splash new counter. flooring. | $7,000 |
| Jan 20, 2021 | Completed final sign-off Jul 2021 | 1306 Hyde St | kitchen and laundry remodel. adding washer and dryer.Details
kitchen and laundry remodel. adding washer and dryer. | $30,000 |
| Jan 20, 2021 | Completed final sign-off Mar 2021 | 875 Vermont St | unit 202: kitchen and laundry remodel. upgrade. no structural work. plumbing and elec onlyDetails
unit 202: kitchen and laundry remodel. upgrade. no structural work. plumbing and elec only | $10,000 |
| Jan 8, 2021 | Completed final sign-off Apr 2021 | 1263 Oak St | #2: kitchen remodeling. no change in wall & opening, layout. maintain 1-hr separation between units at area of work.Details
#2: kitchen remodeling. no change in wall & opening, layout. maintain 1-hr separation between units at area of work. | $8,000 |
| Nov 9, 2020 | Completed final sign-off Apr 2021 | 1304 Hyde St | 1304: kitchen & bathroom upgrade. adding washer & dryer. no wall modification. no structural work.Details
1304: kitchen & bathroom upgrade. adding washer & dryer. no wall modification. no structural work. | $30,000 |
| Feb 10, 2020 | Completed final sign-off Dec 2021 | 69 Piedmont St | kitchen remodel, bathroom relocation on level 2 and remodel of extg bathroom on level 3, removal of side deck and steps on exterior. replace extg windows at bathtoom and bedroom on level 1Details
kitchen remodel, bathroom relocation on level 2 and remodel of extg bathroom on level 3, removal of side deck and steps on exterior. replace extg windows at bathtoom and bedroom on level 1 | $180,000 |
| May 13, 2019 | Expired or cancelled expired Jun 2025 | 1 Rausch St | interior remodel of unit a on ground flr. add glass panel & wall on mezzanine level. remodel kitchen fixtures and add new office on ground floor. no change to exterior or structuralDetails
interior remodel of unit a on ground flr. add glass panel & wall on mezzanine level. remodel kitchen fixtures and add new office on ground floor. no change to exterior or structural | $15,000 |