Back to bathroom remodel contractors
Kyvos Construction Inc
- Based in
- Pittsburg
- On San Francisco permits
- May 2019 to Mar 2025
- Last 24 months
- 1 permit filed
18 permits since 2000: 15 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 7 completed, 1 never finaled. Typically 0 days from filing to permit and 175 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 28, 2023 | Never finaled issued Aug 2023, no final | 855 Folsom St | unit# 322: convert (e) tub to shower in same locaiton in (e) bath. repatch with tiling.Details
unit# 322: convert (e) tub to shower in same locaiton in (e) bath. repatch with tiling. | $8,000 |
| Apr 27, 2022 | Completed final sign-off Dec 2022 | 255 Berry St | unit 317: change all the outlets: move the bathroom vanity 3 feet. bathroom to retain all cbc chapter 11a features.Details
unit 317: change all the outlets: move the bathroom vanity 3 feet. bathroom to retain all cbc chapter 11a features. | $5,300 |
| Aug 11, 2021 | Completed final sign-off Feb 2022 | 149 Wool St | bathroom remodel. new vanity. new faucets, tiles installation, new lights, painting walls, ceiling and new accesories.Details
bathroom remodel. new vanity. new faucets, tiles installation, new lights, painting walls, ceiling and new accesories. | $20,000 |
| Jan 20, 2021 | Completed final sign-off Apr 2021 | 1263 Oak St | unit 2: bathroom remodeling.Details
unit 2: bathroom remodeling. | $8,000 |
| Nov 13, 2020 | Completed final sign-off Sep 2021 | 541 Dellbrook Av | 1/f: 2 new bedrooms, 2 new closets, (e) bathroom remodel and expansion. 2/f: no work at this level. only for referenceDetails
1/f: 2 new bedrooms, 2 new closets, (e) bathroom remodel and expansion. 2/f: no work at this level. only for reference | $25,000 |
| Nov 9, 2020 | Completed final sign-off Apr 2021 | 1304 Hyde St | 1304: kitchen & bathroom upgrade. adding washer & dryer. no wall modification. no structural work.Details
1304: kitchen & bathroom upgrade. adding washer & dryer. no wall modification. no structural work. | $30,000 |
| Feb 10, 2020 | Completed final sign-off Dec 2021 | 69 Piedmont St | kitchen remodel, bathroom relocation on level 2 and remodel of extg bathroom on level 3, removal of side deck and steps on exterior. replace extg windows at bathtoom and bedroom on level 1Details
kitchen remodel, bathroom relocation on level 2 and remodel of extg bathroom on level 3, removal of side deck and steps on exterior. replace extg windows at bathtoom and bedroom on level 1 | $180,000 |
| Aug 12, 2019 | Completed final sign-off Oct 2019 | 1141 Cole St | rehab. extg bath to replace extg shower with new bath tub. no walls to be removed. no change on extg structural. 2nd fl.Details
rehab. extg bath to replace extg shower with new bath tub. no walls to be removed. no change on extg structural. 2nd fl. | $16,000 |