Back to kitchen remodel contractors
Kuality Constructions
- Based in
- Foster City
- On San Francisco permits
- Sep 2004 to Oct 2023
- Last 24 months
- 0 permits filed
26 permits since 2000: 19 completed, 2 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 7 completed, 3 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 175 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 23, 2023 | Never finaled issued Aug 2023, no final | 2366 28th Av | in kind remodel one kitchen and one bathroomDetails
in kind remodel one kitchen and one bathroom | $45,000 |
| Aug 23, 2023 | Never finaled issued Aug 2023, no final | 1506 24th Av | in kind remodel (1) kitchen and (1) bathroomDetails
in kind remodel (1) kitchen and (1) bathroom | $65,000 |
| Oct 15, 2018 | Never finaled issued Nov 2018, no final | 1542 24th Av | ground floor renovation new bathroom, 2 bedrooms, new non load bearing walls. 2nd floor renovation of kitchen and new bathroom.Details
ground floor renovation new bathroom, 2 bedrooms, new non load bearing walls. 2nd floor renovation of kitchen and new bathroom. | $200,000 |
| Jul 26, 2012 | Completed final sign-off Apr 2013 | 2075 41st Av | legalize downstairs bedroom and bathroom. remodel kitchen and upstairs bathroom. upgrade main electrical panel to 200a service.Details
legalize downstairs bedroom and bathroom. remodel kitchen and upstairs bathroom. upgrade main electrical panel to 200a service. | $30,000 |
| Jun 3, 2010 | Expired or cancelled expired Feb 2013 | 625 Castro St | remodel kitchen and bathroom in unit#625. kitchen-replace counter. no new lighting, bathrooms - replace plumbing fixts. & retile floor's walls. no structural work.Details
remodel kitchen and bathroom in unit#625. kitchen-replace counter. no new lighting, bathrooms - replace plumbing fixts. & retile floor's walls. no structural work. | $25,000 |
| Mar 24, 2009 | Completed final sign-off Sep 2009 | 1630 40th Av | remodel kitchen & bathroom, replace windows with same size, legalize downstair rooms & bathroom. build new deck, upgrade electric main panel. remove (e) drywall, insulate & install new drywall. install new lighting. replace front 2 windows w/marvin alun. clad wood frame windows in same configurationDetails
remodel kitchen & bathroom, replace windows with same size, legalize downstair rooms & bathroom. build new deck, upgrade electric main panel. remove (e) drywall, insulate & install new drywall. install new lighting. replace front 2 windows w/marvin alun. clad wood frame windows in same configuration | $36,000 |
| Jun 13, 2008 | Completed final sign-off Jul 2008 | 38 Cole St | work @ unit# 42 only. remodel kitchen. some lighting. no structural work. all llighting to be flourescent (100%).Details
work @ unit# 42 only. remodel kitchen. some lighting. no structural work. all llighting to be flourescent (100%). | $10,000 |
| Nov 28, 2007 | Completed final sign-off Feb 2008 | 30 Nibbi Ct | remodel kitchen,(2) bathroom, install new garage door, add island in kitchen. (18'x7') garage door replacement in kind. provide 200 sq in. venting @ door wood panel 15 feet across.Details
remodel kitchen,(2) bathroom, install new garage door, add island in kitchen. (18'x7') garage door replacement in kind. provide 200 sq in. venting @ door wood panel 15 feet across. | $22,000 |
| Mar 17, 2006 | Completed final sign-off Dec 2006 | 2975 24th Av | remove kitchen, replace (e) kitchen window & patio door with like kind. repair deck less than 50% of the deck element to be replaced). outside kitchen. kitchen is located at rear of house.Details
remove kitchen, replace (e) kitchen window & patio door with like kind. repair deck less than 50% of the deck element to be replaced). outside kitchen. kitchen is located at rear of house. | $15,000 |
| Jan 20, 2006 | Completed final sign-off Apr 2006 | 1402 Chestnut St | replace kitchen cabinets, countertop, sink & faucet, replace bathtub, shower/tub fixture, toilet & sink, install new tile flooringDetails
replace kitchen cabinets, countertop, sink & faucet, replace bathtub, shower/tub fixture, toilet & sink, install new tile flooring | $20,000 |
| Mar 14, 2005 | Completed final sign-off Sep 2005 | 1285 Filbert St | remodel 1 kitchen, 1 bathroom, 1 1/2 bath, electrical service upgrade, install new house meters forDetails
remodel 1 kitchen, 1 bathroom, 1 1/2 bath, electrical service upgrade, install new house meters for | $50,000 |