Kozubek Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2001 to Dec 2016
- Last 24 months
- 0 permits filed
22 permits since 2000: 20 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 3 completed. Typically 0 days from filing to permit and 75 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 22, 2016 | Completed final sign-off Feb 2019 | 774 10th Av | horizontal extension at rear under sunroom; extend deck; repair substandard framing & dry rot, widen (e) garage opening. replace front windows in kind, new rear windows. kitchen and bath remodel. demo (e) deck & stair, rebuild & extend; local seismic strengthening; per plan.Details
horizontal extension at rear under sunroom; extend deck; repair substandard framing & dry rot, widen (e) garage opening. replace front windows in kind, new rear windows. kitchen and bath remodel. demo (e) deck & stair, rebuild & extend; local seismic strengthening; per plan. | $175,000 |
| Dec 5, 2011 | Completed final sign-off Jan 2012 | 1949 Webster St | dry rot repair to the staircase column pedestal decoration at front of building, less than 50% in-kind replacement. painting are not included. less than 50% in kind replacementDetails
dry rot repair to the staircase column pedestal decoration at front of building, less than 50% in-kind replacement. painting are not included. less than 50% in kind replacement | $2,500 |
| Sep 15, 2005 | Completed final sign-off Nov 2005 | 265 21st Av | repair dryrot on the front wall/right side of stairs approx. 20 sq ft/stucco repairDetails
repair dryrot on the front wall/right side of stairs approx. 20 sq ft/stucco repair | $3,000 |