Kozubek Construction

Contractor license
767921
State license record
Based in
San Francisco
On San Francisco permits
Sep 2001 to Dec 2016
Last 24 months
0 permits filed

22 permits since 2000: 20 completed, 2 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Stairs permits

AllDeck 4Stairs 3Kitchen remodel 3Bathroom remodel 3

3 stairs permits: 3 completed. Typically 0 days from filing to permit and 75 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Dec 22, 2016Completed
final sign-off Feb 2019
774 10th Avhorizontal extension at rear under sunroom; extend deck; repair substandard framing & dry rot, widen (e) garage opening. replace front windows in kind, new rear windows. kitchen and bath remodel. demo (e) deck & stair, rebuild & extend; local seismic strengthening; per plan.
Details
Permit
201612225688
Status
complete
Filed
Dec 22, 2016
Permit issued
Dec 29, 2016
Final sign-off
Feb 20, 2019
Declared cost
$175,000
Address
774 10th Av

horizontal extension at rear under sunroom; extend deck; repair substandard framing & dry rot, widen (e) garage opening. replace front windows in kind, new rear windows. kitchen and bath remodel. demo (e) deck & stair, rebuild & extend; local seismic strengthening; per plan.

Open the permit page

$175,000
Dec 5, 2011Completed
final sign-off Jan 2012
1949 Webster Stdry rot repair to the staircase column pedestal decoration at front of building, less than 50% in-kind replacement. painting are not included. less than 50% in kind replacement
Details
Permit
201112050076
Status
complete
Filed
Dec 5, 2011
Permit issued
Dec 5, 2011
Final sign-off
Jan 19, 2012
Declared cost
$2,500
Address
1949 Webster St

dry rot repair to the staircase column pedestal decoration at front of building, less than 50% in-kind replacement. painting are not included. less than 50% in kind replacement

Open the permit page

$2,500
Sep 15, 2005Completed
final sign-off Nov 2005
265 21st Avrepair dryrot on the front wall/right side of stairs approx. 20 sq ft/stucco repair
Details
Permit
200509153043
Status
complete
Filed
Sep 15, 2005
Permit issued
Sep 15, 2005
Final sign-off
Nov 29, 2005
Declared cost
$3,000
Address
265 21st Av

repair dryrot on the front wall/right side of stairs approx. 20 sq ft/stucco repair

Open the permit page

$3,000