Back to kitchen remodel contractors
Kozubek Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2001 to Dec 2016
- Last 24 months
- 0 permits filed
22 permits since 2000: 20 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 54 days from filing to permit and 554 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 22, 2016 | Completed final sign-off Feb 2019 | 774 10th Av | horizontal extension at rear under sunroom; extend deck; repair substandard framing & dry rot, widen (e) garage opening. replace front windows in kind, new rear windows. kitchen and bath remodel. demo (e) deck & stair, rebuild & extend; local seismic strengthening; per plan.Details
horizontal extension at rear under sunroom; extend deck; repair substandard framing & dry rot, widen (e) garage opening. replace front windows in kind, new rear windows. kitchen and bath remodel. demo (e) deck & stair, rebuild & extend; local seismic strengthening; per plan. | $175,000 |
| Feb 7, 2007 | Completed final sign-off May 2007 | 2927 Pierce St | field revision to 200503288486. change open rail at south side of deck to solid. add 2 windows at south wall of addition . u-factor.42 or less. remove kitchen remodel from scope of work.Details
field revision to 200503288486. change open rail at south side of deck to solid. add 2 windows at south wall of addition . u-factor.42 or less. remove kitchen remodel from scope of work. | $1,000 |
| Mar 28, 2005 | Completed final sign-off Nov 2007 | 2927 Pierce St | 1st floor addition @ rear yard (283 sf) 3rd floor infill @ rear building (21 sf) interiror kitchen remodel.Details
1st floor addition @ rear yard (283 sf) 3rd floor infill @ rear building (21 sf) interiror kitchen remodel. | $38,000 |