Koefoed Const Co
- Based in
- San Rafael
- On San Francisco permits
- Jan 2000 to Dec 2021
- Last 24 months
- 0 permits filed
102 permits since 2000: 97 completed, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
16 stairs permits: 14 completed, 2 never finaled. Typically 0 days from filing to permit and 127 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 4, 2019 | Completed final sign-off Nov 2020 | 29 Caselli Av | replace (e) rear stair w/ wood-framed stair, modify wdw size to accomodate stair landing.Details
replace (e) rear stair w/ wood-framed stair, modify wdw size to accomodate stair landing. | $21,000 |
| Jul 17, 2019 | Completed final sign-off Mar 2020 | 2378 36th Av | renovation of extg bathroom and laundry to new master bath, 1/2 bath and new communicating stair to lower bedroom.Details
renovation of extg bathroom and laundry to new master bath, 1/2 bath and new communicating stair to lower bedroom. | $150,000 |
| Apr 20, 2018 | Completed final sign-off Oct 2018 | 110 Melrose Av | repair front stair dryrot damage, replace brick treads & risers with tileDetails
repair front stair dryrot damage, replace brick treads & risers with tile | $22,000 |
| Mar 7, 2018 | Never finaled issued Mar 2018, no final | 9 Scott St | repair front staircase in kind treads, risers & stringers 50% or less replacementDetails
repair front staircase in kind treads, risers & stringers 50% or less replacement | $12,000 |
| Sep 29, 2015 | Completed final sign-off Oct 2015 | 73 Waller St | repair stringers and treads on two flights of rear stairs at back of building.Details
repair stringers and treads on two flights of rear stairs at back of building. | $5,000 |
| Oct 24, 2013 | Completed final sign-off Mar 2014 | 2650 17th Av | remodel extg lightwell. interior remodel to add mud room on 1st floor. reframe extg interior stair. interior remodel extg bath.Details
remodel extg lightwell. interior remodel to add mud room on 1st floor. reframe extg interior stair. interior remodel extg bath. | $45,000 |
| Feb 2, 2011 | Completed final sign-off Feb 2012 | 170 Saint Elmo Wy | build out (e) attic space. strengthen lower floors w/seismic shear walls, hold downs per struct. dwgs. new interior stair and new dormers at roof, new bath, bedroom and play room in attic space.Details
build out (e) attic space. strengthen lower floors w/seismic shear walls, hold downs per struct. dwgs. new interior stair and new dormers at roof, new bath, bedroom and play room in attic space. | $75,000 |
| May 10, 2010 | Completed final sign-off Sep 2010 | 1140 Oak St | repair existing stairs, decking, & 6 floor joists, & portions of guardrail. note: work constitutes less than 50% of the area being repaired.Details
repair existing stairs, decking, & 6 floor joists, & portions of guardrail. note: work constitutes less than 50% of the area being repaired. | $8,135 |
| Aug 1, 2008 | Completed final sign-off Sep 2008 | 4434 Fulton St | remove and replace existing guardrails at stairs and landings.Details
remove and replace existing guardrails at stairs and landings. | $7,000 |
| Jul 8, 2008 | Completed final sign-off Oct 2009 | 1971 15th St | 3rd story addition to include new office and family room, remodel 2nd floor kitchen and laundry, new 2nd floor bathroom. new stair from 2nd to 3rd floor.Details
3rd story addition to include new office and family room, remodel 2nd floor kitchen and laundry, new 2nd floor bathroom. new stair from 2nd to 3rd floor. | $120,000 |
| Oct 7, 2005 | Completed final sign-off Feb 2006 | 4106 20th St | replace concrete front stairs. new foundation (section). remove/replace rotten wood. replace basement window.Details
replace concrete front stairs. new foundation (section). remove/replace rotten wood. replace basement window. | $10,000 |
| Jul 14, 2005 | Never finaled issued Jul 2005, no final | 4106 20th St | install 2 18"x18" x24" depth underpinnings to west side of front stair where current fndtn is sinkDetails
install 2 18"x18" x24" depth underpinnings to west side of front stair where current fndtn is sink | $2,500 |
| Nov 12, 2003 | Completed final sign-off Dec 2003 | 675 Ivy St | anchor bolting in bsmt,repair upper deck & stair in kind.reroof under upper deck & cap foundation,Details
anchor bolting in bsmt,repair upper deck & stair in kind.reroof under upper deck & cap foundation, | $10,000 |
| Apr 10, 2003 | Completed final sign-off May 2003 | 4351 17th St | repair rotten stair case treads risers & stringers as necessary to remove rot less than 50%Details
repair rotten stair case treads risers & stringers as necessary to remove rot less than 50% | $4,441 |
| Jun 11, 2001 | Completed final sign-off Dec 2001 | 150 Castro St | remove front stairs guard rail & replace w/ victorian style guard rail 36"high w/ grasable hand railDetails
remove front stairs guard rail & replace w/ victorian style guard rail 36"high w/ grasable hand rail | $7,000 |
| Mar 27, 2000 | Completed final sign-off May 2000 | 3505 23rd St | replace 1 stairs as per koefoed scan dated 3/25/00.Details
replace 1 stairs as per koefoed scan dated 3/25/00. | $3,000 |