Back to bathroom remodel contractors
Koefoed Const Co
- Based in
- San Rafael
- On San Francisco permits
- Jan 2000 to Dec 2021
- Last 24 months
- 0 permits filed
102 permits since 2000: 97 completed, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
20 bathroom remodel permits: 20 completed. Typically 0 days from filing to permit and 124 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 17, 2020 | Completed final sign-off Nov 2020 | 234 Lisbon St | minor change to bathroom layout, no structural, no changes to footprint of the house. ref app#201802090957 s1 and 201911157401Details
minor change to bathroom layout, no structural, no changes to footprint of the house. ref app#201802090957 s1 and 201911157401 | |
| Nov 15, 2019 | Completed final sign-off Nov 2020 | 234 Lisbon St | rev to pa:201802090957: 1/f: provide separate heating system *ductelss), revise bathroom grade - no excavation, add w/d in approved bathroom, take out job in wall.Details
rev to pa:201802090957: 1/f: provide separate heating system *ductelss), revise bathroom grade - no excavation, add w/d in approved bathroom, take out job in wall. | |
| Jul 17, 2019 | Completed final sign-off Mar 2020 | 2378 36th Av | renovation of extg bathroom and laundry to new master bath, 1/2 bath and new communicating stair to lower bedroom.Details
renovation of extg bathroom and laundry to new master bath, 1/2 bath and new communicating stair to lower bedroom. | $150,000 |
| Apr 21, 2015 | Completed final sign-off Aug 2015 | 196 Castenada Av | remodel master bathroomDetails
remodel master bathroom | $40,000 |
| Mar 6, 2015 | Completed final sign-off Oct 2016 | 1970 32nd Av | horizontal addition to rear yard, 474 sf total. 1-story with deck (n) over 1st floor. adding 1 bedroom, 1 bath.Details
horizontal addition to rear yard, 474 sf total. 1-story with deck (n) over 1st floor. adding 1 bedroom, 1 bath. | $125,000 |
| Feb 2, 2015 | Completed final sign-off Jun 2015 | 537 Dellbrook Av | remodel of ground floor to create one new bedroom, one new bathroom and a closet. voluntary structure strengthening, new partitions and doors. plumbing, elect, mech to obtain trade permits.Details
remodel of ground floor to create one new bedroom, one new bathroom and a closet. voluntary structure strengthening, new partitions and doors. plumbing, elect, mech to obtain trade permits. | $85,000 |
| Oct 24, 2013 | Completed final sign-off Mar 2014 | 2650 17th Av | remodel extg lightwell. interior remodel to add mud room on 1st floor. reframe extg interior stair. interior remodel extg bath.Details
remodel extg lightwell. interior remodel to add mud room on 1st floor. reframe extg interior stair. interior remodel extg bath. | $45,000 |
| Sep 26, 2012 | Completed final sign-off Nov 2012 | 355 Surrey St | remodel downstairs bathroom.Details
remodel downstairs bathroom. | $20,000 |
| Nov 14, 2011 | Completed final sign-off Jan 2012 | 166 Castro St | revision to pa #201110136677 - new bathroom on 2nd floor, non structural.Details
revision to pa #201110136677 - new bathroom on 2nd floor, non structural. | |
| Oct 13, 2011 | Completed final sign-off Jan 2012 | 166 Castro St | remodel one existing bathroom, non structuralDetails
remodel one existing bathroom, non structural | $25,000 |
| Feb 17, 2011 | Completed final sign-off Jul 2011 | 4181 24th St | remodel kitchen and 2 baths on main floor. repair plaster throughout main floor on floor only inkind.Details
remodel kitchen and 2 baths on main floor. repair plaster throughout main floor on floor only inkind. | $100,000 |
| Feb 2, 2011 | Completed final sign-off Feb 2012 | 170 Saint Elmo Wy | build out (e) attic space. strengthen lower floors w/seismic shear walls, hold downs per struct. dwgs. new interior stair and new dormers at roof, new bath, bedroom and play room in attic space.Details
build out (e) attic space. strengthen lower floors w/seismic shear walls, hold downs per struct. dwgs. new interior stair and new dormers at roof, new bath, bedroom and play room in attic space. | $75,000 |
| Dec 15, 2010 | Completed final sign-off Jun 2011 | 4175 24th St | kitchen remodel, 2 bath remodels, as indicated on the drawingDetails
kitchen remodel, 2 bath remodels, as indicated on the drawing | $87,000 |
| Oct 7, 2010 | Completed final sign-off Dec 2010 | 355 Surrey St | remodel bathroom on main floor. no new wall and no wall relocation.Details
remodel bathroom on main floor. no new wall and no wall relocation. | $14,000 |
| Jul 8, 2008 | Completed final sign-off Oct 2009 | 1971 15th St | 3rd story addition to include new office and family room, remodel 2nd floor kitchen and laundry, new 2nd floor bathroom. new stair from 2nd to 3rd floor.Details
3rd story addition to include new office and family room, remodel 2nd floor kitchen and laundry, new 2nd floor bathroom. new stair from 2nd to 3rd floor. | $120,000 |
| Jan 17, 2007 | Completed final sign-off May 2007 | 45 Ashbury Tr | remodel 2 existing upstairs bathrooms lighting to meet current flourescent code.Details
remodel 2 existing upstairs bathrooms lighting to meet current flourescent code. | $50,000 |
| Feb 2, 2006 | Completed final sign-off May 2006 | 262 30th St | remodel (e) bathroom in (e) location. no structural work. flourescent lighting.Details
remodel (e) bathroom in (e) location. no structural work. flourescent lighting. | $20,000 |
| Jan 11, 2002 | Completed final sign-off Mar 2002 | 150 Castro St | remodel exisitng first floor guest bathroom in existing location. all new fixtures.no structural woDetails
remodel exisitng first floor guest bathroom in existing location. all new fixtures.no structural wo | $20,000 |
| Apr 21, 2000 | Completed final sign-off Aug 2000 | 160 Castro St | remodel upstairs bathroom off dining room 2nd flDetails
remodel upstairs bathroom off dining room 2nd fl | $15,000 |
| Jan 24, 2000 | Completed final sign-off May 2000 | 27 Stoneman St | remodel upstairs bathroom, new fixturesDetails
remodel upstairs bathroom, new fixtures | $9,500 |