Back to kitchen remodel contractors
Kobliska Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Jul 2026
- Last 24 months
- 3 permits filed
34 permits since 2000: 29 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 7 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 159 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 18, 2024 | Completed final sign-off May 2026 | 273 Edinburgh St | revise application# 202206216657: (for kitchen, deck, bath remodel) plan revision to incorporate- re-framing of wall along gridline in kitchen. re-construction of roof above rear foyer. rear foyer will be added to the same area as kitchen.Details
revise application# 202206216657: (for kitchen, deck, bath remodel) plan revision to incorporate- re-framing of wall along gridline in kitchen. re-construction of roof above rear foyer. rear foyer will be added to the same area as kitchen. | |
| May 26, 2023 | Completed final sign-off Feb 2024 | 618 Lisbon St | kitchen remodel- no change to floor plan: replacement of cabinets, appliances, countertops. addition of kitchen island with electrical.Details
kitchen remodel- no change to floor plan: replacement of cabinets, appliances, countertops. addition of kitchen island with electrical. | $12,000 |
| Nov 6, 2017 | Completed final sign-off Apr 2018 | 100 Oxford St | kitchen & bath remodel. addition of 1/2 bath @ 2nd floor.Details
kitchen & bath remodel. addition of 1/2 bath @ 2nd floor. | $50,000 |
| Feb 21, 2013 | Completed final sign-off Apr 2013 | 1241 02nd Av | removal of non-load bearing partition in kitchen, move gas supply for range. patch to match (e) finish.Details
removal of non-load bearing partition in kitchen, move gas supply for range. patch to match (e) finish. | $12,000 |
| Apr 20, 2011 | Completed final sign-off May 2011 | 2245 18th St | #4- 7 kitchen cabinets installed in existing kitchen.Details
#4- 7 kitchen cabinets installed in existing kitchen. | $2,800 |
| Feb 25, 2010 | Completed final sign-off Mar 2011 | 11 High St | interior renovation to existing condo in (e) 8 uniot buildin g. kitchen, living room, ceiling floor & lighting.Details
interior renovation to existing condo in (e) 8 uniot buildin g. kitchen, living room, ceiling floor & lighting. | $14,000 |
| Dec 4, 2006 | Expired or cancelled expired Apr 2008 | 225 Mullen Av | reivision to pa# 2006/10/11/4611. replace (e) sliding glass doors, transoms & windows in same location. size & type at rear of building in bathroom. kitchen & bedroom. not visible from street.Details
reivision to pa# 2006/10/11/4611. replace (e) sliding glass doors, transoms & windows in same location. size & type at rear of building in bathroom. kitchen & bedroom. not visible from street. | $4,000 |
| Oct 11, 2006 | Completed final sign-off Jan 2007 | 225 Mullen Av | dry rot & remodeling (1) kitchen & (1) bath, fluorescent in bathroom or detector, 50% wattage of lighting in kitchen to be fluorescent, no structural workDetails
dry rot & remodeling (1) kitchen & (1) bath, fluorescent in bathroom or detector, 50% wattage of lighting in kitchen to be fluorescent, no structural work | $25,000 |