Back to bathroom remodel contractors
Kmk Construction And Design
- Based in
- Citrus Heights
- On San Francisco permits
- Apr 2014 to Sep 2026
- Last 24 months
- 11 permits filed
69 permits since 2000: 43 completed, 7 in progress, 10 never finaled, 9 expired or cancelled.
Of the 10 never-finaled permits, 7 are 3 to 5 years old, 3 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
28 bathroom remodel permits: 18 completed, 1 in progress, 5 never finaled, 4 expired or cancelled. Typically 27 days from filing to permit and 512 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 30, 2026 | In progress issued May 2026 | 755 46th Av | convet 697 sf of garage space to living area with living room, bedroom, bath, laundry. remodel e kitchen and e bath. add new bath and interior stairs.Details
convet 697 sf of garage space to living area with living room, bedroom, bath, laundry. remodel e kitchen and e bath. add new bath and interior stairs. | $180,000 |
| Apr 2, 2025 | Expired or cancelled withdrawn Jan 2026 | 1970 Ocean Av | east wing: upgrade (2) bathrooms on the 1st floor.Details
east wing: upgrade (2) bathrooms on the 1st floor. | $35,000 |
| Apr 23, 2024 | Expired or cancelled withdrawn Jan 2026 | 1970 Ocean Av | remodel 4 bathrooms in kind. 202 sq ft all on ground level.Details
remodel 4 bathrooms in kind. 202 sq ft all on ground level. | $65,000 |
| Oct 20, 2023 | Completed final sign-off Jul 2025 | 291 Church St | all work on 4/f: (e) kitchen and bathroom remodel. relocate living room. add 1 new bedroom and 1 full bath and 1 media room.Details
all work on 4/f: (e) kitchen and bathroom remodel. relocate living room. add 1 new bedroom and 1 full bath and 1 media room. | $50,000 |
| Feb 8, 2023 | Never finaled issued Feb 2023, no final | 1201 06th Av | comply with complaint 202292048 and 202300932. no removal of walls for all of them. fix intercom and buzzer. units 1,3,4,6,7,9: remodel 1 kitchen (80sf) and 1 bath (45sf) in each unit. units 2,5,8: remodel 1 kitchen (56sf) and 1 bath (35sf) in each unit. remodel in kind. no wall removalDetails
comply with complaint 202292048 and 202300932. no removal of walls for all of them. fix intercom and buzzer. units 1,3,4,6,7,9: remodel 1 kitchen (80sf) and 1 bath (45sf) in each unit. units 2,5,8: remodel 1 kitchen (56sf) and 1 bath (35sf) in each unit. remodel in kind. no wall removal | $198,000 |
| Sep 12, 2022 | Never finaled filed Sep 2022, never issued | 1135 Guerrero St | 1st fl: add 2 adu's per ord 162-16. unit a: add 1 bedroom, kitchen & 1 full bath. unit b: add 1 bedroom, kitchen & 1 full bath. (soft story under pa# 201903014244). add gym room and half bath on 1st floor.Details
1st fl: add 2 adu's per ord 162-16. unit a: add 1 bedroom, kitchen & 1 full bath. unit b: add 1 bedroom, kitchen & 1 full bath. (soft story under pa# 201903014244). add gym room and half bath on 1st floor. | $98,000 |
| Jul 6, 2022 | Completed final sign-off Aug 2023 | 289 Church St | unit 289: 3rd fl remodel kitchen & bathrooom per layout. add 1 full bath & 2 bedrooms, 1 bedroom and 1 denDetails
unit 289: 3rd fl remodel kitchen & bathrooom per layout. add 1 full bath & 2 bedrooms, 1 bedroom and 1 den | $32,000 |
| Jan 6, 2022 | Completed final sign-off Feb 2023 | 1375 Dolores St | remodel kitchen (90 sf) and 2 bathrooms (95 sf) in kind. tiles, sink, tub, cabinets, toilet. no change in layout. no change in wall layout. lights per cemc 150.0 (k).Details
remodel kitchen (90 sf) and 2 bathrooms (95 sf) in kind. tiles, sink, tub, cabinets, toilet. no change in layout. no change in wall layout. lights per cemc 150.0 (k). | $40,000 |
| Sep 24, 2021 | Completed final sign-off Jan 2023 | 1335 16th Av | unit 3 and 5: remodel kitchen (171sf) and bath (40sf) each in kind. lights per cenc 150.0(k).Details
unit 3 and 5: remodel kitchen (171sf) and bath (40sf) each in kind. lights per cenc 150.0(k). | $60,000 |
| Aug 20, 2021 | Completed final sign-off Feb 2023 | 1377 Dolores St | remodel kitchen (90 sf) and 2 baths (95 sf) in kind. lights per cemc 150.0 (k).Details
remodel kitchen (90 sf) and 2 baths (95 sf) in kind. lights per cemc 150.0 (k). | $35,000 |
| Jun 23, 2021 | Completed final sign-off Jun 2022 | 287 Church St | 2/f: remodel kitchen, bathroom. add 1 full bath, 1 bedroom and 1 den.Details
2/f: remodel kitchen, bathroom. add 1 full bath, 1 bedroom and 1 den. | $70,000 |
| Apr 29, 2021 | Completed final sign-off Jan 2023 | 1335 16th Av | 3 unit kitchen & bath remodel in -kind. no change on walls & layout. unit 1: remodel kitchen (74 sf) and bathroom (40 sf) in-kind. unit 2: remodel kitchen (95 sf) and bathroom (40 sf) in kind. unit 4: remodel kitchen (76 sf) and bathroom (40 sf) in-kind.Details
3 unit kitchen & bath remodel in -kind. no change on walls & layout. unit 1: remodel kitchen (74 sf) and bathroom (40 sf) in-kind. unit 2: remodel kitchen (95 sf) and bathroom (40 sf) in kind. unit 4: remodel kitchen (76 sf) and bathroom (40 sf) in-kind. | $40,000 |
| Apr 27, 2021 | Never finaled issued Jun 2022, no final | 111 Fowler Av | convert office space into adu residential space. remodel kitchen and bath per layout. add 1 bedroom and 1 living room.Details
convert office space into adu residential space. remodel kitchen and bath per layout. add 1 bedroom and 1 living room. | $20,000 |
| Sep 21, 2020 | Never finaled issued Mar 2022, no final | 209 Lincoln Wy | 1st floor: add 4 adu per ordinance 95-17.unit a: add 1 bedroom, kitchen, living and 1 full bathunit b: add 2 bedrooms, kitchen, living and 1 full bathunit c: add 2 bedrooms, kitchen, living and 1 full bath unit d: add 2 bedrooms, kitchen, living and 1 full bathDetails
1st floor: add 4 adu per ordinance 95-17.unit a: add 1 bedroom, kitchen, living and 1 full bathunit b: add 2 bedrooms, kitchen, living and 1 full bathunit c: add 2 bedrooms, kitchen, living and 1 full bath unit d: add 2 bedrooms, kitchen, living and 1 full bath | $200,000 |
| Feb 13, 2020 | Expired or cancelled expired Jun 2026 | 818 Green St | revision to pa 201812067663 & to comply with nov 201830631, 201831481, 201058766, 201063886, 201488953, 201831255 & 201049199. 1st fl - reconfigure layout of bedroom & bathroom; 3rd & 4th fl - reconfigure layout of 2 bathrooms.Details
revision to pa 201812067663 & to comply with nov 201830631, 201831481, 201058766, 201063886, 201488953, 201831255 & 201049199. 1st fl - reconfigure layout of bedroom & bathroom; 3rd & 4th fl - reconfigure layout of 2 bathrooms. | $5,000 |
| Nov 14, 2019 | Never finaled issued Dec 2019, no final | 209 Lincoln Wy | interior alteration: unit 1 & 5 remodel bath. relocated kitchen, add 1 den. unit 2 & 6 remodel bath relocated kitchen, dining and bedroom, add 1 den. unit#3 & 7 remodel kitchen and bath. add 1 bedroom. unit 4 & 8 remodel bath, relocate kitchen, dining & bedroom. add 1 den.Details
interior alteration: unit 1 & 5 remodel bath. relocated kitchen, add 1 den. unit 2 & 6 remodel bath relocated kitchen, dining and bedroom, add 1 den. unit#3 & 7 remodel kitchen and bath. add 1 bedroom. unit 4 & 8 remodel bath, relocate kitchen, dining & bedroom. add 1 den. | $600,000 |
| Dec 6, 2018 | Expired or cancelled expired Jun 2026 | 818 Green St | 1st fl:add bdr, 1 full bath and fam room, add interior stairs to connect 2nd fl. unit 818: remodel kithcen and bath rm, add 1 full and 1 bdr, unit 818a: remodel kitchen and bath rm, add 1 full bath, unit 820: remodel kitchen and bath rm, add 1 full bath. sprinkler unit #818 with nfda under sep paDetails
1st fl:add bdr, 1 full bath and fam room, add interior stairs to connect 2nd fl. unit 818: remodel kithcen and bath rm, add 1 full and 1 bdr, unit 818a: remodel kitchen and bath rm, add 1 full bath, unit 820: remodel kitchen and bath rm, add 1 full bath. sprinkler unit #818 with nfda under sep pa | $90,000 |
| Dec 6, 2018 | Completed final sign-off Apr 2022 | 1480 Guerrero St | 1st fl. add (1) bedroom, family room, and (1) full bath, 2nd & 3rd fl. remodel kitchen and bath room, add (1) full bath, rebuild required exit stairs in -kind at rearDetails
1st fl. add (1) bedroom, family room, and (1) full bath, 2nd & 3rd fl. remodel kitchen and bath room, add (1) full bath, rebuild required exit stairs in -kind at rear | $95,000 |
| Oct 6, 2017 | Completed final sign-off Mar 2021 | 2812 21st St | comply with complaint #200557428, 201258185, 201631236. in fill at rear. 1st fl: add 1 bedrm, 1 full bath, and storage. 2-4th fl remodel kitchen & bath. add 1 full bath. provide nfpa 13r sprinkler systems on ground floor.Details
comply with complaint #200557428, 201258185, 201631236. in fill at rear. 1st fl: add 1 bedrm, 1 full bath, and storage. 2-4th fl remodel kitchen & bath. add 1 full bath. provide nfpa 13r sprinkler systems on ground floor. | $140,000 |
| Jun 16, 2017 | Completed final sign-off Oct 2018 | 953 Teresita Bl | 1st flr: add 2 bedrooms and 1 full bathroom. 2nd flr: remodel kitchen and a bathroom and add 1 bathroomDetails
1st flr: add 2 bedrooms and 1 full bathroom. 2nd flr: remodel kitchen and a bathroom and add 1 bathroom | $120,000 |
| Jul 6, 2016 | Completed final sign-off Jul 2017 | 513 05th Av | revision to app#201511193159. revise new bathroom layout. replace interior sheetrock & insulate walls.Details
revision to app#201511193159. revise new bathroom layout. replace interior sheetrock & insulate walls. | |
| Jun 24, 2016 | Completed final sign-off Feb 2021 | 3316 19th St | 1st floor - add 1 media room, 1 bedroom, 1 bath and new patio at rear; 2nd floor - remodel kitchen and bathroom; 3rd floor - remodel bathroom and add 1 bathroom; new wood alulminum clad windows at frontDetails
1st floor - add 1 media room, 1 bedroom, 1 bath and new patio at rear; 2nd floor - remodel kitchen and bathroom; 3rd floor - remodel bathroom and add 1 bathroom; new wood alulminum clad windows at front | $80,000 |
| Mar 7, 2016 | Completed final sign-off Jul 2017 | 511 05th Av | revision to app#201508204833. reconfigure half bathroom layout.Details
revision to app#201508204833. reconfigure half bathroom layout. | |
| Nov 19, 2015 | Completed final sign-off Jul 2017 | 513 05th Av | remodel (e) bathroom, add new bathroom, replace (e) windows at front shall be single hung, wood frame w/ others vinyle.Details
remodel (e) bathroom, add new bathroom, replace (e) windows at front shall be single hung, wood frame w/ others vinyle. | $20,000 |
| May 1, 2015 | Completed final sign-off Aug 2016 | 2940 Clement St | 1st floor: infill rear space to bedroom. add a family room, a bedroom and a full bathroom. 2nd floor: remodel kitchen and bathroom.Details
1st floor: infill rear space to bedroom. add a family room, a bedroom and a full bathroom. 2nd floor: remodel kitchen and bathroom. | $70,000 |
| Apr 9, 2015 | Completed final sign-off Jan 2017 | 511 05th Av | revision to permit #201409156334; move toilet & sink in bathroom.Details
revision to permit #201409156334; move toilet & sink in bathroom. | |
| Sep 15, 2014 | Completed final sign-off Jan 2017 | 511 05th Av | remodel e kitchen and bath. remodel e bath, toilet rm, replace windows, wood frame at front (all floors), vinyl elsewhere. convert extg laundry to bath. connect (e) laundry to bath.Details
remodel e kitchen and bath. remodel e bath, toilet rm, replace windows, wood frame at front (all floors), vinyl elsewhere. convert extg laundry to bath. connect (e) laundry to bath. | $25,000 |
| Apr 30, 2014 | Completed final sign-off Mar 2018 | 6423 California St | (e) 2nd floor residential unit over 1st floor vacant commercial space. convert 1st floor commercial space into new residential unit within rh-2 zoning (no change of building envelope). 1 kitchen, 1 living room, 2 bedrooms, 3.5 baths, 1 family room.Details
(e) 2nd floor residential unit over 1st floor vacant commercial space. convert 1st floor commercial space into new residential unit within rh-2 zoning (no change of building envelope). 1 kitchen, 1 living room, 2 bedrooms, 3.5 baths, 1 family room. | $115,000 |