Back to kitchen remodel contractors
Kmh Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Apr 2013 to Oct 2025
- Last 24 months
- 3 permits filed
32 permits since 2000: 25 completed, 3 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 10 completed, 1 in progress. Typically 0 days from filing to permit and 246 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 5, 2025 | In progress issued Jun 2025 | 439 30th Av | kitchen cabinets, bathroom remodel.Details
kitchen cabinets, bathroom remodel. | $30,000 |
| Jun 4, 2019 | Completed final sign-off Oct 2019 | 319 Hearst Av | 1st fl - remodel bath room & bedroom, add 1 bedroom, 1 full bath, wet bar & media room; 2nd fl - remodel bath, relocate bedroom, kitchen, dining & interior stair; add 1 full bath; replace 3 windows visible from st with aluminum clad woodDetails
1st fl - remodel bath room & bedroom, add 1 bedroom, 1 full bath, wet bar & media room; 2nd fl - remodel bath, relocate bedroom, kitchen, dining & interior stair; add 1 full bath; replace 3 windows visible from st with aluminum clad wood | $90,000 |
| Feb 1, 2019 | Completed final sign-off Jul 2020 | 15 Corona St | addition of dwelling unit per ord# 95-17 w/ 3 bedrooms, 2 bath, kitchen and living/dining room.Details
addition of dwelling unit per ord# 95-17 w/ 3 bedrooms, 2 bath, kitchen and living/dining room. | $56,000 |
| Sep 26, 2018 | Completed final sign-off Jun 2020 | 15 Corona St | remodel kitchen (150sf) & 2 bathrooms (40sf ea) at existing location on 2nd fl. replace licing room & dining room plaster with 5/8" type "x" gtp. bd. with r17 insulation. and 2in screw 5/8" drywall at 4" o.c. upgrade plumbing & electrical.Details
remodel kitchen (150sf) & 2 bathrooms (40sf ea) at existing location on 2nd fl. replace licing room & dining room plaster with 5/8" type "x" gtp. bd. with r17 insulation. and 2in screw 5/8" drywall at 4" o.c. upgrade plumbing & electrical. | $38,000 |
| Mar 6, 2018 | Completed final sign-off Feb 2019 | 1806 38th Av | remodel kitchen and bathroom (top) floor. no alteration of any (e) wall.Details
remodel kitchen and bathroom (top) floor. no alteration of any (e) wall. | $20,000 |
| Mar 7, 2017 | Completed final sign-off Nov 2017 | 45 Montecito Av | remodel kitchen & 2 bathrooms. replace interior finishes.Details
remodel kitchen & 2 bathrooms. replace interior finishes. | $36,000 |
| Feb 17, 2017 | Completed final sign-off Aug 2017 | 419 Lakeshore Dr | to comply with complaint 201614351 & 201650341. 2/f: rev to pa#201611042041. relocate (e) bathroom, (e) kitchen & interior stair. add (n) 1 full bathroom & 1 bedroom. 1/f: add 2 bedrooms, 2 full bathros & family room.Details
to comply with complaint 201614351 & 201650341. 2/f: rev to pa#201611042041. relocate (e) bathroom, (e) kitchen & interior stair. add (n) 1 full bathroom & 1 bedroom. 1/f: add 2 bedrooms, 2 full bathros & family room. | $113,000 |
| Nov 4, 2016 | Completed final sign-off Aug 2017 | 419 Lakeshore Dr | remodel kitchen and bath room. replace interior finishes. no structural workDetails
remodel kitchen and bath room. replace interior finishes. no structural work | $35,000 |
| Aug 12, 2016 | Completed final sign-off Feb 2017 | 118 Arch St | remodel kitchen & bathroom; replace floor tiles, counter sink, toilet & shower. replace interior finishes w/ 5/8" type x gyp. bd. in kind.Details
remodel kitchen & bathroom; replace floor tiles, counter sink, toilet & shower. replace interior finishes w/ 5/8" type x gyp. bd. in kind. | $27,500 |
| Apr 13, 2015 | Completed final sign-off Dec 2015 | 639 35th Av | 2 units -remodel 2 kitchens and 6 bathrooms; to comply with cec150.0(k)3 & 5Details
2 units -remodel 2 kitchens and 6 bathrooms; to comply with cec150.0(k)3 & 5 | $120,000 |
| Nov 10, 2014 | Completed final sign-off Dec 2015 | 2451 19th Av | revision to app#201304184893 including 1)remove a closet in ground floor level. 2) rearrange layout of bed room and kitchen in 2nd floor. 3)relocate side windows.Details
revision to app#201304184893 including 1)remove a closet in ground floor level. 2) rearrange layout of bed room and kitchen in 2nd floor. 3)relocate side windows. |