Back to bathroom remodel contractors
Kmh Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Apr 2013 to Oct 2025
- Last 24 months
- 3 permits filed
32 permits since 2000: 25 completed, 3 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
18 bathroom remodel permits: 15 completed, 2 in progress, 1 never finaled. Typically 2 days from filing to permit and 191 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 17, 2025 | In progress issued Oct 2025 | 439 30th Av | revision to pa # 202506057986 & 202507312011: comply w. nov # 202543239 - construct 2 new bath & replace (e) sheetrock w/ new at 2/f. replace (e) sheetrock w/ new at 1/f. replace/remove (e) cement board w/ new wood siding at front & side of house.Details
revision to pa # 202506057986 & 202507312011: comply w. nov # 202543239 - construct 2 new bath & replace (e) sheetrock w/ new at 2/f. replace (e) sheetrock w/ new at 1/f. replace/remove (e) cement board w/ new wood siding at front & side of house. | $76,000 |
| Jun 5, 2025 | In progress issued Jun 2025 | 439 30th Av | kitchen cabinets, bathroom remodel.Details
kitchen cabinets, bathroom remodel. | $30,000 |
| Jul 8, 2020 | Completed final sign-off Feb 2021 | 743 Peru Av | add (n) exterior wooden deck at rear, btw street level & basement level. upgrade new staircase from basement to main fl & garage level. convert e 2 bedrooms into 1 family room & 1 office on street level. remodel e full bath w/ cosmetic elementsDetails
add (n) exterior wooden deck at rear, btw street level & basement level. upgrade new staircase from basement to main fl & garage level. convert e 2 bedrooms into 1 family room & 1 office on street level. remodel e full bath w/ cosmetic elements | $50,000 |
| Dec 17, 2019 | Completed final sign-off Jan 2022 | 92 Forest View Dr | add the playroom and bathroom on 1st flDetails
add the playroom and bathroom on 1st fl | $40,000 |
| Jun 4, 2019 | Completed final sign-off Oct 2019 | 319 Hearst Av | 1st fl - remodel bath room & bedroom, add 1 bedroom, 1 full bath, wet bar & media room; 2nd fl - remodel bath, relocate bedroom, kitchen, dining & interior stair; add 1 full bath; replace 3 windows visible from st with aluminum clad woodDetails
1st fl - remodel bath room & bedroom, add 1 bedroom, 1 full bath, wet bar & media room; 2nd fl - remodel bath, relocate bedroom, kitchen, dining & interior stair; add 1 full bath; replace 3 windows visible from st with aluminum clad wood | $90,000 |
| May 6, 2019 | Completed final sign-off Oct 2019 | 448 26th Av | remodel bathroom at ground floor, repair fence at rear yard max at 5-11. install (n) front entry iron gate. repair window trim and siding - non street facingDetails
remodel bathroom at ground floor, repair fence at rear yard max at 5-11. install (n) front entry iron gate. repair window trim and siding - non street facing | $8,000 |
| Feb 1, 2019 | Completed final sign-off Jul 2020 | 15 Corona St | addition of dwelling unit per ord# 95-17 w/ 3 bedrooms, 2 bath, kitchen and living/dining room.Details
addition of dwelling unit per ord# 95-17 w/ 3 bedrooms, 2 bath, kitchen and living/dining room. | $56,000 |
| Sep 26, 2018 | Completed final sign-off Jun 2020 | 15 Corona St | remodel kitchen (150sf) & 2 bathrooms (40sf ea) at existing location on 2nd fl. replace licing room & dining room plaster with 5/8" type "x" gtp. bd. with r17 insulation. and 2in screw 5/8" drywall at 4" o.c. upgrade plumbing & electrical.Details
remodel kitchen (150sf) & 2 bathrooms (40sf ea) at existing location on 2nd fl. replace licing room & dining room plaster with 5/8" type "x" gtp. bd. with r17 insulation. and 2in screw 5/8" drywall at 4" o.c. upgrade plumbing & electrical. | $38,000 |
| Mar 6, 2018 | Completed final sign-off Feb 2019 | 1806 38th Av | remodel kitchen and bathroom (top) floor. no alteration of any (e) wall.Details
remodel kitchen and bathroom (top) floor. no alteration of any (e) wall. | $20,000 |
| May 8, 2017 | Completed final sign-off Nov 2017 | 45 Montecito Av | comply with nov 201771591, 201773412. basement fl add 1 full bath, change study to family rm, relocate washer.dryer. 1st fl add bedroom, full bath, remodel bath, reconfigue interior layout. 2nd fl add 2 full bath, bedrm,skylights,remodel media rm enlarged window at front.Details
comply with nov 201771591, 201773412. basement fl add 1 full bath, change study to family rm, relocate washer.dryer. 1st fl add bedroom, full bath, remodel bath, reconfigue interior layout. 2nd fl add 2 full bath, bedrm,skylights,remodel media rm enlarged window at front. | $86,000 |
| Mar 7, 2017 | Completed final sign-off Nov 2017 | 45 Montecito Av | remodel kitchen & 2 bathrooms. replace interior finishes.Details
remodel kitchen & 2 bathrooms. replace interior finishes. | $36,000 |
| Feb 17, 2017 | Completed final sign-off Aug 2017 | 419 Lakeshore Dr | to comply with complaint 201614351 & 201650341. 2/f: rev to pa#201611042041. relocate (e) bathroom, (e) kitchen & interior stair. add (n) 1 full bathroom & 1 bedroom. 1/f: add 2 bedrooms, 2 full bathros & family room.Details
to comply with complaint 201614351 & 201650341. 2/f: rev to pa#201611042041. relocate (e) bathroom, (e) kitchen & interior stair. add (n) 1 full bathroom & 1 bedroom. 1/f: add 2 bedrooms, 2 full bathros & family room. | $113,000 |
| Nov 4, 2016 | Completed final sign-off Aug 2017 | 419 Lakeshore Dr | remodel kitchen and bath room. replace interior finishes. no structural workDetails
remodel kitchen and bath room. replace interior finishes. no structural work | $35,000 |
| Aug 12, 2016 | Completed final sign-off Feb 2017 | 118 Arch St | remodel kitchen & bathroom; replace floor tiles, counter sink, toilet & shower. replace interior finishes w/ 5/8" type x gyp. bd. in kind.Details
remodel kitchen & bathroom; replace floor tiles, counter sink, toilet & shower. replace interior finishes w/ 5/8" type x gyp. bd. in kind. | $27,500 |
| Jun 29, 2015 | Completed final sign-off Jan 2016 | 641 35th Av | g/f -add one bedroom, media room, half bath, plywood panels & non bearing partition walls at 1/f per plan.Details
g/f -add one bedroom, media room, half bath, plywood panels & non bearing partition walls at 1/f per plan. | $31,000 |
| Apr 13, 2015 | Completed final sign-off Dec 2015 | 639 35th Av | 2 units -remodel 2 kitchens and 6 bathrooms; to comply with cec150.0(k)3 & 5Details
2 units -remodel 2 kitchens and 6 bathrooms; to comply with cec150.0(k)3 & 5 | $120,000 |
| Mar 24, 2015 | Completed final sign-off May 2015 | 362 28th Av | remove illegal bathroom and family room on first floor. revert back to garage and storage use.Details
remove illegal bathroom and family room on first floor. revert back to garage and storage use. | $5,000 |
| Nov 7, 2014 | Never finaled issued Nov 2014, no final | 47 Carr St | painting, install flooring, sheetrock, cabinet, vanity for bathroom. property line walls type x 5/8" sheetrock, all layouts to remain unchanged.Details
painting, install flooring, sheetrock, cabinet, vanity for bathroom. property line walls type x 5/8" sheetrock, all layouts to remain unchanged. | $25,000 |