Back to kitchen remodel contractors
Kilb's Construction Inc
- Based in
- Millbrae
- On San Francisco permits
- Mar 2016 to Jul 2026
- Last 24 months
- 4 permits filed
16 permits since 2000: 12 completed, 4 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 2 completed, 3 in progress. Typically 28 days from filing to permit and 214 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 13, 2026 | In progress issued Jul 2026 | 1951 35th Av | remodel (e) bathroom & kitchen. no wall demo/modifications or structural work. remove (e) wall plaster & celing plaster for electrical upgrazde and installation to comply with current code. patch & replace. remove racking at garage.Details
remodel (e) bathroom & kitchen. no wall demo/modifications or structural work. remove (e) wall plaster & celing plaster for electrical upgrazde and installation to comply with current code. patch & replace. remove racking at garage. | $47,000 |
| Jun 30, 2026 | In progress issued Oct 2026 | 86 Stratford Dr | remodel: convert (e) playroom& powder room into new bedrm & bath on 1/f. enlarge (e) kitchen & dining rm.relocate staircase 1/f-2/f. reconfig (ew) closet & bathroom and add new masterbath.remove(e) fireplace and install elec fireplace.remove (e) side staircase and (n) rear deck w/stairs.replace wdwsDetails
remodel: convert (e) playroom& powder room into new bedrm & bath on 1/f. enlarge (e) kitchen & dining rm.relocate staircase 1/f-2/f. reconfig (ew) closet & bathroom and add new masterbath.remove(e) fireplace and install elec fireplace.remove (e) side staircase and (n) rear deck w/stairs.replace wdws | $120,000 |
| Jan 14, 2026 | In progress issued Feb 2026 | 2198 31st Av | revision to pa #202512192305: infill (e) 2/f cantilever overhang to add new bedroom on 1/f. infill (e) 2/f lightwell at interior staircase from non-code compliant to current code compliant. reconfigure 2/f layout to create 2 suites & kitchen remodel.Details
revision to pa #202512192305: infill (e) 2/f cantilever overhang to add new bedroom on 1/f. infill (e) 2/f lightwell at interior staircase from non-code compliant to current code compliant. reconfigure 2/f layout to create 2 suites & kitchen remodel. | $100,000 |
| Oct 4, 2019 | Completed final sign-off Sep 2020 | 119 Bridgeview Dr | remodel kitchen, remove a wall between the kitchen and living room.Details
remodel kitchen, remove a wall between the kitchen and living room. | $13,000 |
| Sep 7, 2018 | Completed final sign-off Feb 2019 | 3420 18th St | commercial t.i. 1) install kitchen equip, plmbg & finishes, 2)install elec, subpanel & water heater. fire sprinklers under separate permit. exterior signage under separate permit. n/a for maher.Details
commercial t.i. 1) install kitchen equip, plmbg & finishes, 2)install elec, subpanel & water heater. fire sprinklers under separate permit. exterior signage under separate permit. n/a for maher. | $80,000 |