Back to bathroom remodel contractors
Kilb's Construction Inc
- Based in
- Millbrae
- On San Francisco permits
- Mar 2016 to Jul 2026
- Last 24 months
- 4 permits filed
16 permits since 2000: 12 completed, 4 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 7 completed, 3 in progress. Typically 12 days from filing to permit and 193 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 13, 2026 | In progress issued Jul 2026 | 1951 35th Av | remodel (e) bathroom & kitchen. no wall demo/modifications or structural work. remove (e) wall plaster & celing plaster for electrical upgrazde and installation to comply with current code. patch & replace. remove racking at garage.Details
remodel (e) bathroom & kitchen. no wall demo/modifications or structural work. remove (e) wall plaster & celing plaster for electrical upgrazde and installation to comply with current code. patch & replace. remove racking at garage. | $47,000 |
| Jun 30, 2026 | In progress issued Oct 2026 | 86 Stratford Dr | remodel: convert (e) playroom& powder room into new bedrm & bath on 1/f. enlarge (e) kitchen & dining rm.relocate staircase 1/f-2/f. reconfig (ew) closet & bathroom and add new masterbath.remove(e) fireplace and install elec fireplace.remove (e) side staircase and (n) rear deck w/stairs.replace wdwsDetails
remodel: convert (e) playroom& powder room into new bedrm & bath on 1/f. enlarge (e) kitchen & dining rm.relocate staircase 1/f-2/f. reconfig (ew) closet & bathroom and add new masterbath.remove(e) fireplace and install elec fireplace.remove (e) side staircase and (n) rear deck w/stairs.replace wdws | $120,000 |
| Apr 6, 2026 | In progress issued Apr 2026 | 2198 31st Av | rev 202512192305 & 202601143857: underpin (e) foundation along grile line 1 and c due to insufficient foundation depth. level out concrete slab on 1/f to match garage ch. window replcements on south wall.reconfig layout on 1/f: add new powder rm and (n) bathroom. new tankless water heater & radiantDetails
rev 202512192305 & 202601143857: underpin (e) foundation along grile line 1 and c due to insufficient foundation depth. level out concrete slab on 1/f to match garage ch. window replcements on south wall.reconfig layout on 1/f: add new powder rm and (n) bathroom. new tankless water heater & radiant | $10,000 |
| Jan 28, 2021 | Completed final sign-off Mar 2022 | 235 Faxon Av | bathroom remodel. no demo. non fixtures replaced in same location. finishes replaced.Details
bathroom remodel. no demo. non fixtures replaced in same location. finishes replaced. | $14,000 |
| Aug 5, 2019 | Completed final sign-off Feb 2020 | 1387 22nd Av | remodel the bathroom. no remove wall.Details
remodel the bathroom. no remove wall. | $4,000 |
| Jul 12, 2018 | Completed final sign-off Dec 2018 | 500 Bryant St | unit 206: remodel (2) bathrooms, 5'x7' each, replace in-kindDetails
unit 206: remodel (2) bathrooms, 5'x7' each, replace in-kind | $1,000 |
| Oct 2, 2017 | Completed final sign-off May 2019 | 66 Escondido Av | legalize one (e) bedroom, construct one new bedroom, 2 full bathroom, family room at g/f, convert (e) one bathroom to 2 full bathroom at 2/f.Details
legalize one (e) bedroom, construct one new bedroom, 2 full bathroom, family room at g/f, convert (e) one bathroom to 2 full bathroom at 2/f. | $80,000 |
| Sep 11, 2017 | Completed final sign-off Jan 2018 | 3466 17th St | bathroom remodel - no structural work. new fixtures & accessories. n/a maherDetails
bathroom remodel - no structural work. new fixtures & accessories. n/a maher | $10,000 |
| Dec 28, 2016 | Completed final sign-off Feb 2017 | 2680 Lombard St | replace the sink in bathroom, upgrade the electric wire, patch the wall, painting, flooring.Details
replace the sink in bathroom, upgrade the electric wire, patch the wall, painting, flooring. | $4,000 |
| Mar 8, 2016 | Completed final sign-off Jun 2019 | 1566 18th Av | legalize ground floor in law unit. (e) bedroom & bath completed per pa# 8612170. new lanscape work @ front.Details
legalize ground floor in law unit. (e) bedroom & bath completed per pa# 8612170. new lanscape work @ front. | $10,000 |