Back to kitchen remodel contractors
Kiely Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2015 to Jan 2024
- Last 24 months
- 0 permits filed
26 permits since 2000: 24 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 8 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 224 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 25, 2024 | Completed final sign-off Jun 2024 | 1031 Fell St | kitchen remodel- remodel kitchen, update with new cabinets, floors insulation, drywall, lighting fixtures, plumbing fixtures and appliances. no moving walls.Details
kitchen remodel- remodel kitchen, update with new cabinets, floors insulation, drywall, lighting fixtures, plumbing fixtures and appliances. no moving walls. | $30,000 |
| Feb 7, 2022 | Completed final sign-off Apr 2023 | 133 Winfield St | level 1: bathroom & laundry room remodel. level 2: replace tub & finishes in (e) bathroom, remodel kitchenDetails
level 1: bathroom & laundry room remodel. level 2: replace tub & finishes in (e) bathroom, remodel kitchen | $85,000 |
| Mar 1, 2021 | Completed final sign-off Aug 2021 | 1112 Fulton St | in kind kitchen remodel. remodel of (e) existing kitchen. replace cabinets, finishes, fixtures with in-kind like materials: no removal of wallsDetails
in kind kitchen remodel. remodel of (e) existing kitchen. replace cabinets, finishes, fixtures with in-kind like materials: no removal of walls | $50,000 |
| Jan 8, 2021 | Expired or cancelled cancelled Jan 2026 | 665 Carolina St | apt 21: rev to pa202011128687: open up 2 walls in kitchen and install dropped beams.Details
apt 21: rev to pa202011128687: open up 2 walls in kitchen and install dropped beams. | $2,000 |
| Nov 12, 2020 | Completed final sign-off Aug 2021 | 665 Carolina St | replace kitchen fixtures in kind. replace main bathroom and master bathroom fixtures in kind. new flooring throughout. reface fireplace surround.Details
replace kitchen fixtures in kind. replace main bathroom and master bathroom fixtures in kind. new flooring throughout. reface fireplace surround. | $8,000 |
| Sep 26, 2019 | Completed final sign-off Oct 2020 | 75 Winfield St | replace siding on front facade in kind, replace rear & side facade siding, add skylights per plan, new kitchen cabinets, replace (e) 2nd fl bathroom fixtures & finishes in kind, add second full bath to 2nd fl. new patio slider door in rear facade, replace front exterior. ref pa 201908229593Details
replace siding on front facade in kind, replace rear & side facade siding, add skylights per plan, new kitchen cabinets, replace (e) 2nd fl bathroom fixtures & finishes in kind, add second full bath to 2nd fl. new patio slider door in rear facade, replace front exterior. ref pa 201908229593 | $90,000 |
| Aug 22, 2019 | Completed final sign-off Oct 2020 | 75 Winfield St | replace kitchen cabinets and appliances in kind, replace plumbing fixtures in both bathrooms in kind. re-tile bathroomsDetails
replace kitchen cabinets and appliances in kind, replace plumbing fixtures in both bathrooms in kind. re-tile bathrooms | $25,000 |
| Oct 25, 2018 | Completed final sign-off Apr 2019 | 2263 47th Av | reconfiguring and renovating bathroom & kitchen. remove load bearing walls between dining room & living room. convert (e) bedroom closet and merge with (e) bathroom. covert (e) bathroom closet into (e) bedroom.Details
reconfiguring and renovating bathroom & kitchen. remove load bearing walls between dining room & living room. convert (e) bedroom closet and merge with (e) bathroom. covert (e) bathroom closet into (e) bedroom. | $20,000 |
| Jul 15, 2016 | Completed final sign-off Sep 2016 | 309 02nd Av | replace kitchen counter, backsplash, and cabinetry. replace light fixtures in kind in kitchen. no archtectural or structural modification. all lighting to be high efficacy.Details
replace kitchen counter, backsplash, and cabinetry. replace light fixtures in kind in kitchen. no archtectural or structural modification. all lighting to be high efficacy. | $17,000 |