Back to bathroom remodel contractors
Kiely Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2015 to Jan 2024
- Last 24 months
- 0 permits filed
26 permits since 2000: 24 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 8 completed. Typically 12 days from filing to permit and 294 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 1, 2023 | Completed final sign-off Aug 2023 | 166 Putnam St | replace in kind plumbing fixture for extg ground floor bathroom. new toilet, new vanity, shower fixtures and tile for shower and floor to replace extg approx 45 sf.Details
replace in kind plumbing fixture for extg ground floor bathroom. new toilet, new vanity, shower fixtures and tile for shower and floor to replace extg approx 45 sf. | $19,000 |
| Feb 7, 2022 | Completed final sign-off Apr 2023 | 133 Winfield St | level 1: bathroom & laundry room remodel. level 2: replace tub & finishes in (e) bathroom, remodel kitchenDetails
level 1: bathroom & laundry room remodel. level 2: replace tub & finishes in (e) bathroom, remodel kitchen | $85,000 |
| Nov 12, 2020 | Completed final sign-off Aug 2021 | 665 Carolina St | replace kitchen fixtures in kind. replace main bathroom and master bathroom fixtures in kind. new flooring throughout. reface fireplace surround.Details
replace kitchen fixtures in kind. replace main bathroom and master bathroom fixtures in kind. new flooring throughout. reface fireplace surround. | $8,000 |
| Sep 26, 2019 | Completed final sign-off Oct 2020 | 75 Winfield St | replace siding on front facade in kind, replace rear & side facade siding, add skylights per plan, new kitchen cabinets, replace (e) 2nd fl bathroom fixtures & finishes in kind, add second full bath to 2nd fl. new patio slider door in rear facade, replace front exterior. ref pa 201908229593Details
replace siding on front facade in kind, replace rear & side facade siding, add skylights per plan, new kitchen cabinets, replace (e) 2nd fl bathroom fixtures & finishes in kind, add second full bath to 2nd fl. new patio slider door in rear facade, replace front exterior. ref pa 201908229593 | $90,000 |
| Aug 22, 2019 | Completed final sign-off Oct 2020 | 75 Winfield St | replace kitchen cabinets and appliances in kind, replace plumbing fixtures in both bathrooms in kind. re-tile bathroomsDetails
replace kitchen cabinets and appliances in kind, replace plumbing fixtures in both bathrooms in kind. re-tile bathrooms | $25,000 |
| Oct 25, 2018 | Completed final sign-off Apr 2019 | 2263 47th Av | reconfiguring and renovating bathroom & kitchen. remove load bearing walls between dining room & living room. convert (e) bedroom closet and merge with (e) bathroom. covert (e) bathroom closet into (e) bedroom.Details
reconfiguring and renovating bathroom & kitchen. remove load bearing walls between dining room & living room. convert (e) bedroom closet and merge with (e) bathroom. covert (e) bathroom closet into (e) bedroom. | $20,000 |
| May 23, 2018 | Completed final sign-off Mar 2019 | 2545 23rd Av | renovate kichen bathroom and add new bathroom on 2nd floor. sheet rock in garage for new mechanical room.Details
renovate kichen bathroom and add new bathroom on 2nd floor. sheet rock in garage for new mechanical room. | $70,000 |
| May 16, 2018 | Completed final sign-off Aug 2019 | 215 Banks St | convert (e) garage to media room & bathroom. infill garage door, add new windows & exterior , new led lighting and flooring remove curb cutDetails
convert (e) garage to media room & bathroom. infill garage door, add new windows & exterior , new led lighting and flooring remove curb cut | $40,000 |