Back to kitchen remodel contractors
Kevin Sullivan Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Nov 2021
- Last 24 months
- 0 permits filed
106 permits since 2000: 83 completed, 13 never finaled, 10 expired or cancelled.
Of the 13 never-finaled permits, 4 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
18 kitchen remodel permits: 11 completed, 6 never finaled, 1 expired or cancelled. Typically 8 days from filing to permit and 180 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 4, 2020 | Completed final sign-off Aug 2020 | 2910 24th Av | remodel kitchen and bathroom in kind @ 1st floor.Details
remodel kitchen and bathroom in kind @ 1st floor. | $100,000 |
| Mar 22, 2017 | Expired or cancelled expired Oct 2019 | 35 San Fernando Wy | kitchen remodel, office relocated, remove bath. add outdoor bbq and fire pit. (2) side , 1 east new windows. one new door on east and one new door on north facade.Details
kitchen remodel, office relocated, remove bath. add outdoor bbq and fire pit. (2) side , 1 east new windows. one new door on east and one new door on north facade. | $68,000 |
| Jan 18, 2017 | Completed final sign-off Mar 2017 | 160 Molimo Dr | remodel existing kitchen and bath. no wall added or removedDetails
remodel existing kitchen and bath. no wall added or removed | $50,000 |
| Dec 23, 2016 | Never finaled issued Mar 2018, no final | 2563 47th Av | add 15'x25' rear 2 story addition to include: 1st flr; add bdrm, bath, laundry & interior stairs. 2nd flr; remodel kitchen, add study & exterior stairs to rear yard & (2) skylights.Details
add 15'x25' rear 2 story addition to include: 1st flr; add bdrm, bath, laundry & interior stairs. 2nd flr; remodel kitchen, add study & exterior stairs to rear yard & (2) skylights. | $120,000 |
| Aug 28, 2015 | Never finaled issued Jun 2019, no final | 3283 Folsom St | remove & replace in kind rotted rear stairs & porch. provide new foundation for porch. enclose space below (e) conditioned study with plywood for lateral resistance. enlarge (e) opening btwn kitchen & dining room. minor renovation of kitchen. install new siding & deck @ rear.Details
remove & replace in kind rotted rear stairs & porch. provide new foundation for porch. enclose space below (e) conditioned study with plywood for lateral resistance. enlarge (e) opening btwn kitchen & dining room. minor renovation of kitchen. install new siding & deck @ rear. | $40,000 |
| Aug 7, 2015 | Completed final sign-off Jun 2016 | 33 Bennington St | remodel (e) kitchen. remove non bearing walls in kitchen breakfast area. provide new cabinets, lighting, etc. work to include plumb, elect/ replace (e) window with new double pan - size for size - not visible from the street . u -factor not > .32, to comply with cec150.0(k)3Details
remodel (e) kitchen. remove non bearing walls in kitchen breakfast area. provide new cabinets, lighting, etc. work to include plumb, elect/ replace (e) window with new double pan - size for size - not visible from the street . u -factor not > .32, to comply with cec150.0(k)3 | $25,000 |
| Oct 29, 2014 | Completed final sign-off Jul 2015 | 2024 14th Av | interior remodel, kitchen and bathrooms per plan. new electrical and pumbling. replacement of 8 windows, 1 skylight and 1 sliding door.Details
interior remodel, kitchen and bathrooms per plan. new electrical and pumbling. replacement of 8 windows, 1 skylight and 1 sliding door. | $40,000 |
| Aug 19, 2014 | Completed final sign-off Nov 2014 | 183 Maddux Av | remodel kitchen, open up plaster walls at cabinet areas to install wiring & plumibng. install new cabinets, use existing appliances.Details
remodel kitchen, open up plaster walls at cabinet areas to install wiring & plumibng. install new cabinets, use existing appliances. | $8,000 |
| Jun 19, 2014 | Completed final sign-off Dec 2015 | 294 Page St | kitchen remodel & new dumb waiters.Details
kitchen remodel & new dumb waiters. | $15,000 |
| Jan 29, 2014 | Never finaled issued Oct 2014, no final | 735 Teresita Bl | horizontal addition. rear yard stair enclosure. rear yard decks at 1st & 2nd floors. interior renovations: kitchen, bath, new bedroom. struct, mech, elec, plumb.Details
horizontal addition. rear yard stair enclosure. rear yard decks at 1st & 2nd floors. interior renovations: kitchen, bath, new bedroom. struct, mech, elec, plumb. | $75,000 |
| Oct 30, 2012 | Completed final sign-off Aug 2013 | 740 El Camino Del Mar | remodel (e) kitchen, remove stairs to garage, convert bedrm #5 into den, demo (e) powder rm & bath #5 @main floor. add new powder room @main floor. at lower floor demo (e) bar, closet & sliding doors. add new french doors @(e) opening. remove & add windows, not visible from streetDetails
remodel (e) kitchen, remove stairs to garage, convert bedrm #5 into den, demo (e) powder rm & bath #5 @main floor. add new powder room @main floor. at lower floor demo (e) bar, closet & sliding doors. add new french doors @(e) opening. remove & add windows, not visible from street | $150,000 |
| Mar 23, 2012 | Never finaled issued Mar 2012, no final | 98 Taraval St | remodel 1 kitchen and 1 bathroom follwoing existing footprint, new cabinets, tile fixtures, appliances. lighting to comply cec150(k).Details
remodel 1 kitchen and 1 bathroom follwoing existing footprint, new cabinets, tile fixtures, appliances. lighting to comply cec150(k). | $40,000 |
| Mar 7, 2011 | Completed final sign-off Jun 2011 | 32 Knollview Wy | replace cabinets, plumbing, electrical, flooring appliances of (e) kitchen. remove non-load bearing wall between dining and kitchenDetails
replace cabinets, plumbing, electrical, flooring appliances of (e) kitchen. remove non-load bearing wall between dining and kitchen | $18,000 |
| Dec 29, 2008 | Completed final sign-off Apr 2009 | 1973 16th Av | remove (e) appliances, dry wall, cabinets, flooring, electrical & plumbing work. install new wiring. plumbing insulation, drywall, cabinets, & appliances. kitchen remodel. no new walls. no midification to (e) walls. all work to be non structural.Details
remove (e) appliances, dry wall, cabinets, flooring, electrical & plumbing work. install new wiring. plumbing insulation, drywall, cabinets, & appliances. kitchen remodel. no new walls. no midification to (e) walls. all work to be non structural. | $50,000 |
| Nov 10, 2005 | Never finaled issued Nov 2005, no final | 15 Magellan Av | kitchen and bath remodel. bath remove exist tub and fixtures sheetrock, tile, replace with new. demolish and rebuild. remove exist cabinets, counters, sheetrock, flooring. installing new sheetrock cabinets, counters, flooring , apliances.Details
kitchen and bath remodel. bath remove exist tub and fixtures sheetrock, tile, replace with new. demolish and rebuild. remove exist cabinets, counters, sheetrock, flooring. installing new sheetrock cabinets, counters, flooring , apliances. | $40,000 |
| Nov 4, 2005 | Completed final sign-off May 2007 | 179 Hernandez Av | add 2nd floor master suite, add internal stair, remodel kitchen 7'-6 x 9'-4" extesnion to create single space garage, new deck area and landscape steps in rear yard -electrical, plumbing and heating alterations.Details
add 2nd floor master suite, add internal stair, remodel kitchen 7'-6 x 9'-4" extesnion to create single space garage, new deck area and landscape steps in rear yard -electrical, plumbing and heating alterations. | $250,000 |
| Feb 6, 2004 | Never finaled issued Feb 2004, no final | 23 Magellan Av | remodel kitchen & bathroom, no structuralDetails
remodel kitchen & bathroom, no structural | $25,000 |
| Feb 26, 2001 | Completed final sign-off Jul 2007 | 2266 14th Av | demo (e) kitchen install new cabinets, demo (e) bathrm install new fix/tile, repair dry rot on (e)Details
demo (e) kitchen install new cabinets, demo (e) bathrm install new fix/tile, repair dry rot on (e) | $20,000 |