Back to bathroom remodel contractors
Kevin Sullivan Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Nov 2021
- Last 24 months
- 0 permits filed
106 permits since 2000: 83 completed, 13 never finaled, 10 expired or cancelled.
Of the 13 never-finaled permits, 4 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
26 bathroom remodel permits: 20 completed, 5 never finaled, 1 expired or cancelled. Typically 1 days from filing to permit and 222 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 2, 2020 | Completed final sign-off Sep 2021 | 1973 16th Av | remodel (2) (e) bathroomsDetails
remodel (2) (e) bathrooms | $30,000 |
| Mar 4, 2020 | Completed final sign-off Aug 2020 | 2910 24th Av | remodel kitchen and bathroom in kind @ 1st floor.Details
remodel kitchen and bathroom in kind @ 1st floor. | $100,000 |
| Dec 23, 2019 | Completed final sign-off Feb 2021 | 741 Natoma St | at existing 1/2 bath, new plumbing fixtures and finishes add a shower, laundry sinkDetails
at existing 1/2 bath, new plumbing fixtures and finishes add a shower, laundry sink | $9,000 |
| Feb 7, 2019 | Completed final sign-off Oct 2019 | 1579 18th Av | 1st fl: add 2 bedrooms, 2 full baths, office and media.Details
1st fl: add 2 bedrooms, 2 full baths, office and media. | $70,000 |
| Jul 20, 2018 | Completed final sign-off Mar 2020 | 160 Molimo Dr | interior remodel of 3rd fl bath and closets. remove 1 e property line window and replace with 2 new windows, skylights. new property line window under ab-009Details
interior remodel of 3rd fl bath and closets. remove 1 e property line window and replace with 2 new windows, skylights. new property line window under ab-009 | $40,000 |
| Mar 22, 2017 | Expired or cancelled expired Oct 2019 | 35 San Fernando Wy | kitchen remodel, office relocated, remove bath. add outdoor bbq and fire pit. (2) side , 1 east new windows. one new door on east and one new door on north facade.Details
kitchen remodel, office relocated, remove bath. add outdoor bbq and fire pit. (2) side , 1 east new windows. one new door on east and one new door on north facade. | $68,000 |
| Jan 18, 2017 | Completed final sign-off Mar 2017 | 160 Molimo Dr | remodel existing kitchen and bath. no wall added or removedDetails
remodel existing kitchen and bath. no wall added or removed | $50,000 |
| Dec 23, 2016 | Never finaled issued Mar 2018, no final | 2563 47th Av | add 15'x25' rear 2 story addition to include: 1st flr; add bdrm, bath, laundry & interior stairs. 2nd flr; remodel kitchen, add study & exterior stairs to rear yard & (2) skylights.Details
add 15'x25' rear 2 story addition to include: 1st flr; add bdrm, bath, laundry & interior stairs. 2nd flr; remodel kitchen, add study & exterior stairs to rear yard & (2) skylights. | $120,000 |
| Oct 3, 2016 | Completed final sign-off May 2017 | 45 Homestead St | remodel lower floor adding new bathroom, replace (e) stair from 1st to lower floor. new exterior door to yard in (e) window openingDetails
remodel lower floor adding new bathroom, replace (e) stair from 1st to lower floor. new exterior door to yard in (e) window opening | $98,000 |
| Aug 17, 2016 | Completed final sign-off Jan 2017 | 2980 24th Av | remodel master bathroom on 2/f, no structural work. n/a ordinance #155-13Details
remodel master bathroom on 2/f, no structural work. n/a ordinance #155-13 | $20,000 |
| Jan 22, 2016 | Completed final sign-off Dec 2016 | 35 San Fernando Wy | addition of conditions space at (e) basement to include 1 bathroom and new open railing at (e) stair and media room/bar/hallwayDetails
addition of conditions space at (e) basement to include 1 bathroom and new open railing at (e) stair and media room/bar/hallway | $65,000 |
| Dec 16, 2015 | Completed final sign-off Dec 2016 | 37 Jordan Av | remodel master bath and remodel 2nd bath on same floorDetails
remodel master bath and remodel 2nd bath on same floor | $30,000 |
| May 6, 2015 | Completed final sign-off Dec 2015 | 35 San Fernando Wy | addition of fireplace at master bedroom, remodel master bath, relocate laundry and add bathroom at second floor.Details
addition of fireplace at master bedroom, remodel master bath, relocate laundry and add bathroom at second floor. | $76,000 |
| Mar 3, 2015 | Completed final sign-off Jun 2015 | 1420 Shrader St | one bathroom remodel. (6'x7')Details
one bathroom remodel. (6'x7') | $10,000 |
| Oct 29, 2014 | Completed final sign-off Jul 2015 | 2024 14th Av | interior remodel, kitchen and bathrooms per plan. new electrical and pumbling. replacement of 8 windows, 1 skylight and 1 sliding door.Details
interior remodel, kitchen and bathrooms per plan. new electrical and pumbling. replacement of 8 windows, 1 skylight and 1 sliding door. | $40,000 |
| Feb 27, 2014 | Completed final sign-off Jul 2015 | 740 El Camino Del Mar | remodel existing bathroom and closet, add new window. replace 3 windows with marvin clad replacement sashes. not visible.Details
remodel existing bathroom and closet, add new window. replace 3 windows with marvin clad replacement sashes. not visible. | $40,000 |
| Feb 21, 2014 | Completed final sign-off Apr 2015 | 1464 23rd Av | convert portion of garage space into family room wiht new bathroom & closet. relocate laundry, mechanical & storage space. remove & replace interior stair, remodel existing bathroom & relocate closet on 2nd floor. remove patio in rear yard & replace with new pavers & retaining wall.Details
convert portion of garage space into family room wiht new bathroom & closet. relocate laundry, mechanical & storage space. remove & replace interior stair, remodel existing bathroom & relocate closet on 2nd floor. remove patio in rear yard & replace with new pavers & retaining wall. | $85,000 |
| Jan 29, 2014 | Never finaled issued Oct 2014, no final | 735 Teresita Bl | horizontal addition. rear yard stair enclosure. rear yard decks at 1st & 2nd floors. interior renovations: kitchen, bath, new bedroom. struct, mech, elec, plumb.Details
horizontal addition. rear yard stair enclosure. rear yard decks at 1st & 2nd floors. interior renovations: kitchen, bath, new bedroom. struct, mech, elec, plumb. | $75,000 |
| Mar 4, 2013 | Completed final sign-off Jun 2013 | 2222 15th Av | demo extg bathroom and closets. build new master bathroom and 2nd bathroom, build new closets.Details
demo extg bathroom and closets. build new master bathroom and 2nd bathroom, build new closets. | $40,000 |
| Oct 30, 2012 | Completed final sign-off Aug 2013 | 740 El Camino Del Mar | remodel (e) kitchen, remove stairs to garage, convert bedrm #5 into den, demo (e) powder rm & bath #5 @main floor. add new powder room @main floor. at lower floor demo (e) bar, closet & sliding doors. add new french doors @(e) opening. remove & add windows, not visible from streetDetails
remodel (e) kitchen, remove stairs to garage, convert bedrm #5 into den, demo (e) powder rm & bath #5 @main floor. add new powder room @main floor. at lower floor demo (e) bar, closet & sliding doors. add new french doors @(e) opening. remove & add windows, not visible from street | $150,000 |
| Sep 24, 2012 | Completed final sign-off Mar 2013 | 50 Woodacre Dr | remodel (e) one bathroom: new tile, shower, vanity and toilet.Details
remodel (e) one bathroom: new tile, shower, vanity and toilet. | $20,000 |
| Mar 23, 2012 | Never finaled issued Mar 2012, no final | 98 Taraval St | remodel 1 kitchen and 1 bathroom follwoing existing footprint, new cabinets, tile fixtures, appliances. lighting to comply cec150(k).Details
remodel 1 kitchen and 1 bathroom follwoing existing footprint, new cabinets, tile fixtures, appliances. lighting to comply cec150(k). | $40,000 |
| Apr 7, 2009 | Completed final sign-off Nov 2010 | 3851 Clay St | remove fixtures,tile,sheetrock from 2 (e) bathrooms. install new drywall, tile and plumb fixtures& vanity's update plumbing & elec. no structrual work to be done. provide fluorescent lights or o.s. in bathrooms.Details
remove fixtures,tile,sheetrock from 2 (e) bathrooms. install new drywall, tile and plumb fixtures& vanity's update plumbing & elec. no structrual work to be done. provide fluorescent lights or o.s. in bathrooms. | $40,000 |
| Nov 10, 2005 | Never finaled issued Nov 2005, no final | 15 Magellan Av | kitchen and bath remodel. bath remove exist tub and fixtures sheetrock, tile, replace with new. demolish and rebuild. remove exist cabinets, counters, sheetrock, flooring. installing new sheetrock cabinets, counters, flooring , apliances.Details
kitchen and bath remodel. bath remove exist tub and fixtures sheetrock, tile, replace with new. demolish and rebuild. remove exist cabinets, counters, sheetrock, flooring. installing new sheetrock cabinets, counters, flooring , apliances. | $40,000 |
| Feb 6, 2004 | Never finaled issued Feb 2004, no final | 23 Magellan Av | remodel kitchen & bathroom, no structuralDetails
remodel kitchen & bathroom, no structural | $25,000 |
| Feb 12, 2003 | Completed final sign-off May 2003 | 475 Magellan Av | bathroom remodel.Details
bathroom remodel. | $7,200 |