Kevin Lin Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2015 to Jun 2026
- Last 24 months
- 15 permits filed
67 permits since 2000: 57 completed, 4 in progress, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 4 are 5 to 10 years old, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
10 stairs permits: 8 completed, 2 never finaled. Typically 20 days from filing to permit and 174 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 27, 2026 | Completed final sign-off Sep 2026 | 122 Flood Av | replace front stair in kindDetails
replace front stair in kind | $5,000 |
| Sep 9, 2025 | Completed final sign-off Apr 2026 | 254 Niagara Av | repair front stair way (less than 50%), repair the dryrot and 20sf around the stair wayDetails
repair front stair way (less than 50%), repair the dryrot and 20sf around the stair way | $5,000 |
| Aug 4, 2020 | Completed final sign-off Sep 2021 | 135 Brentwood Av | 1st floor: add 2 bedrooms, 2.5 bath, family room & media room. 2nd floor: remodel bedrooms, kitchen & bathroom. add 1.5 bath. add patio at rear. repair stucco & front stairs.Details
1st floor: add 2 bedrooms, 2.5 bath, family room & media room. 2nd floor: remodel bedrooms, kitchen & bathroom. add 1.5 bath. add patio at rear. repair stucco & front stairs. | $85,000 |
| Apr 23, 2019 | Completed final sign-off Aug 2019 | 845 Rutland St | construct new wall @ ground floor; construct new deck w/staircase at rear of building (size approx 18'-0 x 20'-0)Details
construct new wall @ ground floor; construct new deck w/staircase at rear of building (size approx 18'-0 x 20'-0) | $40,000 |
| Dec 12, 2018 | Completed final sign-off Aug 2019 | 384 Rolph St | 1st fl - convert half bath to full bath. convert storage to media room. 2nd fl - relocate (e) kitchen, bathroom & bedroom. add new bathroom. remove bearing wall between living room and hallway, new stairway to connect 1st fl. new deck at rear side of building.Details
1st fl - convert half bath to full bath. convert storage to media room. 2nd fl - relocate (e) kitchen, bathroom & bedroom. add new bathroom. remove bearing wall between living room and hallway, new stairway to connect 1st fl. new deck at rear side of building. | $60,000 |
| May 15, 2018 | Never finaled issued Jun 2018, no final | 239 Vernon St | revision to pa #201802010111, revise staircase connect to existing deck at rear of building.Details
revision to pa #201802010111, revise staircase connect to existing deck at rear of building. | $2,000 |
| Feb 1, 2018 | Completed final sign-off Jun 2018 | 239 Vernon St | relocate kitchen, bed room & bathroom. add 1 new bathroom @ 2nd fl. construct family, bedroom & bathroom @ ground floor. construt new deck w/staircase at rear of buildingDetails
relocate kitchen, bed room & bathroom. add 1 new bathroom @ 2nd fl. construct family, bedroom & bathroom @ ground floor. construt new deck w/staircase at rear of building | $62,000 |
| Jan 31, 2018 | Completed final sign-off May 2019 | 41 Pueblo St | 1) construct 2 bedroom, one full bath room and media room at ground floor. 2)construct new deck with staircase at rear of bldg(size approx 16'-0"x 18'-0")Details
1) construct 2 bedroom, one full bath room and media room at ground floor. 2)construct new deck with staircase at rear of bldg(size approx 16'-0"x 18'-0") | $30,000 |
| May 19, 2017 | Completed final sign-off Nov 2017 | 2050 31st Av | construct 2 bedrooms, 2 full bathrooms & laundry area @ ground floor. convert 1 bathroom to 2 full bathrooms & remodel (e) kitchen replace counter, cabinets & sink @ 2nd floor. construct new deck with staircase at rear of buildingDetails
construct 2 bedrooms, 2 full bathrooms & laundry area @ ground floor. convert 1 bathroom to 2 full bathrooms & remodel (e) kitchen replace counter, cabinets & sink @ 2nd floor. construct new deck with staircase at rear of building | $68,000 |
| Oct 2, 2015 | Never finaled filed Oct 2015, never issued | 20 Borica St | replace whole building stucco and repair front stair 50 per cent or less. comply with complaint no 201572002 and replace stret face - wood windows to match existing at the front.Details
replace whole building stucco and repair front stair 50 per cent or less. comply with complaint no 201572002 and replace stret face - wood windows to match existing at the front. | $30,000 |