Back to bathroom remodel contractors
Kevin Lin Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2015 to Jun 2026
- Last 24 months
- 15 permits filed
67 permits since 2000: 57 completed, 4 in progress, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 4 are 5 to 10 years old, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
40 bathroom remodel permits: 36 completed, 2 in progress, 1 never finaled, 1 expired or cancelled. Typically 14 days from filing to permit and 152 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 29, 2026 | In progress issued Aug 2026 | 548 Vienna St | 1/f: add 2 bedroom, 1 full bath and media room. 2/f: remodel kitchen and bathroom. relocate bedroom. add 1 office and 1 full bath. new deck at rear. replace front window with in-kind (vinyl). replace new garage door (wood)Details
1/f: add 2 bedroom, 1 full bath and media room. 2/f: remodel kitchen and bathroom. relocate bedroom. add 1 office and 1 full bath. new deck at rear. replace front window with in-kind (vinyl). replace new garage door (wood) | $180,000 |
| May 29, 2026 | Completed final sign-off Sep 2026 | 122 Flood Av | 2rev 202506047926: 1/f: reconfig bathroom layout. 2/f: reconfig bath layout. add 3 new skylights. remove deck at 2/f. change heaitng system to radiant heat.Details
2rev 202506047926: 1/f: reconfig bathroom layout. 2/f: reconfig bath layout. add 3 new skylights. remove deck at 2/f. change heaitng system to radiant heat. | $2,800 |
| Nov 26, 2025 | Completed final sign-off Apr 2026 | 131 Wetmore St | 2/f unit 131: remodel kitchen and bathroom. add 1 full bath.Details
2/f unit 131: remodel kitchen and bathroom. add 1 full bath. | $50,000 |
| Jul 31, 2025 | Completed final sign-off Apr 2026 | 254 Niagara Av | ground floor remodel: to add two bedrooms, full bathrooms, kitchenette and study room. relocate and replace (e) furnace and water heater. add washer and dryer at the garage location.Details
ground floor remodel: to add two bedrooms, full bathrooms, kitchenette and study room. relocate and replace (e) furnace and water heater. add washer and dryer at the garage location. | $80,000 |
| Jul 28, 2025 | Completed final sign-off Sep 2026 | 122 Flood Av | horizontal additions @ lvl 2, 1st floor:add family room with wet bar, bedroom, 1.5 baths, & laundry/relocate utilities. 2nd fl: remodel existing living, kitchen, dining, 2 bedrooms & bathroom. add 1 full bath. 3rd fl: remodel existing playroom, add 1 full bath. infill lightwell. new deck at rearDetails
horizontal additions @ lvl 2, 1st floor:add family room with wet bar, bedroom, 1.5 baths, & laundry/relocate utilities. 2nd fl: remodel existing living, kitchen, dining, 2 bedrooms & bathroom. add 1 full bath. 3rd fl: remodel existing playroom, add 1 full bath. infill lightwell. new deck at rear | $195,000 |
| Jul 22, 2025 | In progress issued Jul 2025 | 350 Brunswick St | convert (e) storage at 1st fl. into living space (430) sq ft. add one bed room, one full bath. one gym room and one media room with wet bar. add new tankless water heater and new ac split for new living spaceDetails
convert (e) storage at 1st fl. into living space (430) sq ft. add one bed room, one full bath. one gym room and one media room with wet bar. add new tankless water heater and new ac split for new living space | $110,000 |
| May 27, 2025 | Completed final sign-off May 2026 | 1962 Quint St | 1st fl: add 1 bedroom, family, 1 full and mudroom. 2nd fl : remodel kitchen and bathroom. replace front window w in kind vinyl. add patio at rear.Details
1st fl: add 1 bedroom, family, 1 full and mudroom. 2nd fl : remodel kitchen and bathroom. replace front window w in kind vinyl. add patio at rear. | $180,000 |
| Oct 21, 2024 | Completed final sign-off Jul 2025 | 243 Granada Av | 1st floor: add 1 bedroom, 1 family room, and one full bath. 2nd floor: remodel bathroom, relocate kitchen and bedrrom, add 1 full bath. to comply with nov #2022885151-12). replace windows at front wood aluminum clad. add (n) deck at rearDetails
1st floor: add 1 bedroom, 1 family room, and one full bath. 2nd floor: remodel bathroom, relocate kitchen and bedrrom, add 1 full bath. to comply with nov #2022885151-12). replace windows at front wood aluminum clad. add (n) deck at rear | $220,000 |
| Mar 28, 2024 | Completed final sign-off Jun 2024 | 1712 Felton St | 2nd floor- bathroom and kitchen remodel. addition of a full bathroom. add (3) new skylights and replace front window in kind.Details
2nd floor- bathroom and kitchen remodel. addition of a full bathroom. add (3) new skylights and replace front window in kind. | $50,000 |
| Sep 7, 2023 | Completed final sign-off Mar 2024 | 107 University St | kitchen & bathroom remodel in-kind. no removal of walls (approx 300 sf)Details
kitchen & bathroom remodel in-kind. no removal of walls (approx 300 sf) | $35,000 |
| Aug 12, 2022 | Completed final sign-off Dec 2022 | 224 Garfield St | 1/f: add (1) full bathroom & laundry; 2/f: remodel kitchen & bathroom, replace front windows w/in-kind aluminum cladd woodDetails
1/f: add (1) full bathroom & laundry; 2/f: remodel kitchen & bathroom, replace front windows w/in-kind aluminum cladd wood | $45,000 |
| May 5, 2022 | Completed final sign-off Oct 2022 | 258 Monticello St | revision to bpa#202204132151. 2/f: reconfigure kitchen & bathroom layout. add new deck @ rear. replace all windows w/in-kind aluminum clad woodDetails
revision to bpa#202204132151. 2/f: reconfigure kitchen & bathroom layout. add new deck @ rear. replace all windows w/in-kind aluminum clad wood | $20,000 |
| Apr 13, 2022 | Completed final sign-off Oct 2022 | 258 Monticello St | remodel bathrooms and kitchen in-kind.Details
remodel bathrooms and kitchen in-kind. | $30,000 |
| Sep 10, 2021 | Completed final sign-off Nov 2021 | 350 Brunswick St | remodel bathroom. at (e) 2/fDetails
remodel bathroom. at (e) 2/f | $10,000 |
| Aug 24, 2021 | Completed final sign-off Oct 2021 | 820 Visitacion Av | rev pa202107275170 - add 1 full bathroom on 2/f.Details
rev pa202107275170 - add 1 full bathroom on 2/f. | $10,000 |
| Jul 27, 2021 | Completed final sign-off Oct 2021 | 820 Visitacion Av | remodel kitchen and bathroom. no layout change, no wall stud framing demolitionDetails
remodel kitchen and bathroom. no layout change, no wall stud framing demolition | $3,500 |
| Dec 10, 2020 | Completed final sign-off Jun 2021 | 109 Lakeshore Dr | revision to pa# 202003137067. add 1 new family room and 1 full bath on 1st fl. reconfigure 2nd fl.Details
revision to pa# 202003137067. add 1 new family room and 1 full bath on 1st fl. reconfigure 2nd fl. | |
| Aug 4, 2020 | Completed final sign-off Sep 2021 | 135 Brentwood Av | 1st floor: add 2 bedrooms, 2.5 bath, family room & media room. 2nd floor: remodel bedrooms, kitchen & bathroom. add 1.5 bath. add patio at rear. repair stucco & front stairs.Details
1st floor: add 2 bedrooms, 2.5 bath, family room & media room. 2nd floor: remodel bedrooms, kitchen & bathroom. add 1.5 bath. add patio at rear. repair stucco & front stairs. | $85,000 |
| Feb 10, 2020 | Completed final sign-off Sep 2021 | 135 Brentwood Av | remodel kitchen & 1 bathroom at 2nd fl. no alteration to wall. replace new sheetrock for 2 bedrooms.Details
remodel kitchen & 1 bathroom at 2nd fl. no alteration to wall. replace new sheetrock for 2 bedrooms. | $30,000 |
| Nov 7, 2019 | Completed final sign-off Sep 2020 | 2336 Sloat Bl | construct 2 bedroom, 2 full bath, and laundry rm at gr fl. removel e kitchen, bath rm, add 1 new bath and remove interior wall between lving rm/ dining rm 2nd flDetails
construct 2 bedroom, 2 full bath, and laundry rm at gr fl. removel e kitchen, bath rm, add 1 new bath and remove interior wall between lving rm/ dining rm 2nd fl | $120,000 |
| Feb 28, 2019 | Completed final sign-off Oct 2019 | 1614 32nd Av | add new bedrooms, bathrooms, laundry room and family room on 1t fl approx 700 sq ft; relocate and remodel (e) kitchen and bathrooms. enclose light well and new office and bathroomDetails
add new bedrooms, bathrooms, laundry room and family room on 1t fl approx 700 sq ft; relocate and remodel (e) kitchen and bathrooms. enclose light well and new office and bathroom | $100,000 |
| Dec 13, 2018 | Never finaled issued Dec 2018, no final | 1614 32nd Av | remodel (e) kitchen & bathroom. replace lath & plaster with 5/8" type "x" gyp. bd. approx 400 sf.Details
remodel (e) kitchen & bathroom. replace lath & plaster with 5/8" type "x" gyp. bd. approx 400 sf. | $20,000 |
| Dec 12, 2018 | Completed final sign-off Aug 2019 | 384 Rolph St | 1st fl - convert half bath to full bath. convert storage to media room. 2nd fl - relocate (e) kitchen, bathroom & bedroom. add new bathroom. remove bearing wall between living room and hallway, new stairway to connect 1st fl. new deck at rear side of building.Details
1st fl - convert half bath to full bath. convert storage to media room. 2nd fl - relocate (e) kitchen, bathroom & bedroom. add new bathroom. remove bearing wall between living room and hallway, new stairway to connect 1st fl. new deck at rear side of building. | $60,000 |
| Oct 9, 2018 | Completed final sign-off May 2019 | 215 Gambier St | relocate (e) kitchen, bath rm, add one new bathrm upgrade partial ceiling joists at 2nd flr. construct 2 bedrm, 2 full bathrm, family rm, laundry rm & office at ground flrDetails
relocate (e) kitchen, bath rm, add one new bathrm upgrade partial ceiling joists at 2nd flr. construct 2 bedrm, 2 full bathrm, family rm, laundry rm & office at ground flr | $125,000 |
| Feb 22, 2018 | Completed final sign-off Oct 2018 | 6 Pinehurst Wy | 2/f: create open floor plan for living room, dining room, & kitchen, reconfigure & remodel kitchen & bathroom; infill lightwell & add full bathroom. g/f: add family room & playroom.Details
2/f: create open floor plan for living room, dining room, & kitchen, reconfigure & remodel kitchen & bathroom; infill lightwell & add full bathroom. g/f: add family room & playroom. | $55,000 |
| Feb 9, 2018 | Completed final sign-off Jul 2018 | 56 Morningside Dr | add one each bathroom. 1 each bed room, one each family room on 1st floorDetails
add one each bathroom. 1 each bed room, one each family room on 1st floor | $50,000 |
| Feb 6, 2018 | Expired or cancelled expired Jul 2022 | 1642 19th Av | 1)relocate kitchen, add one new bath rm, & convert extg kitchen space to office/media room. infill partial light well at 2nd floor. 2)construct 2 bedroom, 2 bath room and media room at ground floor.Details
1)relocate kitchen, add one new bath rm, & convert extg kitchen space to office/media room. infill partial light well at 2nd floor. 2)construct 2 bedroom, 2 bath room and media room at ground floor. | $68,000 |
| Feb 1, 2018 | Completed final sign-off Jun 2018 | 239 Vernon St | relocate kitchen, bed room & bathroom. add 1 new bathroom @ 2nd fl. construct family, bedroom & bathroom @ ground floor. construt new deck w/staircase at rear of buildingDetails
relocate kitchen, bed room & bathroom. add 1 new bathroom @ 2nd fl. construct family, bedroom & bathroom @ ground floor. construt new deck w/staircase at rear of building | $62,000 |
| Jan 31, 2018 | Completed final sign-off May 2019 | 41 Pueblo St | 1) construct 2 bedroom, one full bath room and media room at ground floor. 2)construct new deck with staircase at rear of bldg(size approx 16'-0"x 18'-0")Details
1) construct 2 bedroom, one full bath room and media room at ground floor. 2)construct new deck with staircase at rear of bldg(size approx 16'-0"x 18'-0") | $30,000 |
| Dec 7, 2017 | Completed final sign-off Apr 2018 | 127 Wetmore St | unit #127: remodel" add 1 each, bathroom and remodel (e) bathroom and kitchen and bedrooms maher naDetails
unit #127: remodel" add 1 each, bathroom and remodel (e) bathroom and kitchen and bedrooms maher na | $30,000 |
| Oct 17, 2017 | Completed final sign-off Dec 2018 | 261 Rolph St | legalize exist. ground floor family room and bath. enclose space below exist. sunroom. conventional framing per building codeDetails
legalize exist. ground floor family room and bath. enclose space below exist. sunroom. conventional framing per building code | $60,000 |
| Jul 28, 2017 | Completed final sign-off Dec 2017 | 38 Everglade Dr | remodel kitchen and add 1 new bathroomDetails
remodel kitchen and add 1 new bathroom | $20,000 |
| May 19, 2017 | Completed final sign-off Nov 2017 | 2050 31st Av | construct 2 bedrooms, 2 full bathrooms & laundry area @ ground floor. convert 1 bathroom to 2 full bathrooms & remodel (e) kitchen replace counter, cabinets & sink @ 2nd floor. construct new deck with staircase at rear of buildingDetails
construct 2 bedrooms, 2 full bathrooms & laundry area @ ground floor. convert 1 bathroom to 2 full bathrooms & remodel (e) kitchen replace counter, cabinets & sink @ 2nd floor. construct new deck with staircase at rear of building | $68,000 |
| May 19, 2017 | Completed final sign-off Feb 2018 | 210 Casitas Av | 2nd fl: remodel (e) bath. main fl: remodel (e) kitchen & bath, add one half bath. lower fl: convert family rm to master bedroom, add laundry room to family rm. remodel (e) bath, add half bath, replace w/h, furnace. basement fl: add exercise room & wine rm, construct wood deck at rear yard.Details
2nd fl: remodel (e) bath. main fl: remodel (e) kitchen & bath, add one half bath. lower fl: convert family rm to master bedroom, add laundry room to family rm. remodel (e) bath, add half bath, replace w/h, furnace. basement fl: add exercise room & wine rm, construct wood deck at rear yard. | $80,000 |
| Oct 11, 2016 | Completed final sign-off Apr 2017 | 1235 41st Av | remodeling ground floor including a family room, two bedrooms, two baths & a storage.Details
remodeling ground floor including a family room, two bedrooms, two baths & a storage. | $20,000 |
| Jun 27, 2016 | Completed final sign-off Sep 2016 | 510 22nd Av | replace 4 (e) windows at rear elevation. 1st flr- remove washer/dryer & sink. 2nd flr- convert toilet room to laundry w/sink, reconfigure storage/breakfast room to bath & study. 3rd flr - remodel bathDetails
replace 4 (e) windows at rear elevation. 1st flr- remove washer/dryer & sink. 2nd flr- convert toilet room to laundry w/sink, reconfigure storage/breakfast room to bath & study. 3rd flr - remodel bath | $35,000 |
| May 17, 2016 | Completed final sign-off Aug 2016 | 1474 20th Av | revision to app#201604124537. changed/relocated half bathroom to a full bath keeping extg side door at front unit. relocated bedroom window at rear unit.Details
revision to app#201604124537. changed/relocated half bathroom to a full bath keeping extg side door at front unit. relocated bedroom window at rear unit. | |
| May 4, 2016 | Completed final sign-off Sep 2016 | 256 Francisco St | remodel 2 bathrooms: replace vanity, faucet, tile, new fixtures. replace kitchen countertop, sink, faucet.Details
remodel 2 bathrooms: replace vanity, faucet, tile, new fixtures. replace kitchen countertop, sink, faucet. | $15,000 |
| Apr 12, 2016 | Completed final sign-off Aug 2016 | 1474 20th Av | front unit- relocate kitchen, convert (e) kitchen to a bedroom, add 1/2 bath on 2/f, add a media room & an office with two 1/2 baths on 1/f. rear unit- relocate kitchen, convert (e) kitchen to a bedroom, modify (e) bathroom, convert (e) bedroom to 2 bedrooms, replace water heater to tankless.Details
front unit- relocate kitchen, convert (e) kitchen to a bedroom, add 1/2 bath on 2/f, add a media room & an office with two 1/2 baths on 1/f. rear unit- relocate kitchen, convert (e) kitchen to a bedroom, modify (e) bathroom, convert (e) bedroom to 2 bedrooms, replace water heater to tankless. | $60,000 |
| Mar 20, 2015 | Completed final sign-off Sep 2020 | 2616 24th Av | new 2 stories horizontal rear addition. new 2 bedrooms, family room & 2 bathrooms @ 1st floor. new 2 master bedrooms & bathrooms @ 2nd floor.Details
new 2 stories horizontal rear addition. new 2 bedrooms, family room & 2 bathrooms @ 1st floor. new 2 master bedrooms & bathrooms @ 2nd floor. | $100,000 |