Kevin Lehane Construction
- Based in
- Walnut Creek
- On San Francisco permits
- Sep 2002 to Feb 2020
- Last 24 months
- 0 permits filed
131 permits since 2000: 70 completed, 33 never finaled, 28 expired or cancelled.
Of the 33 never-finaled permits, 2 are 5 to 10 years old, 31 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
6 stairs permits: 5 completed, 1 never finaled. Typically 4 days from filing to permit and 255 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 18, 2014 | Completed final sign-off Oct 2017 | 48 Hancock St | misc dry rot repair and voluntary partial garage foundation upgrade of an existing 1 story garage at gr level with roof deck. replace existing concrete stairs in kind. comply nov 201485587Details
misc dry rot repair and voluntary partial garage foundation upgrade of an existing 1 story garage at gr level with roof deck. replace existing concrete stairs in kind. comply nov 201485587 | $17,500 |
| Dec 16, 2013 | Completed final sign-off Sep 2015 | 47 Prospect Av | rebuilding of interior stair case. revision to pa 2012/1121/4672.Details
rebuilding of interior stair case. revision to pa 2012/1121/4672. | $5,000 |
| Jan 16, 2013 | Never finaled issued Jan 2013, no final | 214 Edinburgh St | revision to pa#2012-07-25-5725. remove (e) shed roof & rear stairs to add 1/2 bath in upper floor. (n) foundation in the ground floor.Details
revision to pa#2012-07-25-5725. remove (e) shed roof & rear stairs to add 1/2 bath in upper floor. (n) foundation in the ground floor. | $30,000 |
| Nov 27, 2012 | Completed final sign-off Dec 2012 | 530 Banks St | construct 2 bedroom and 2 baths on 1st floor. new interior stair to 2nd floor, foundation replacementDetails
construct 2 bedroom and 2 baths on 1st floor. new interior stair to 2nd floor, foundation replacement | $75,000 |
| Nov 13, 2012 | Completed final sign-off Aug 2013 | 86 Wool St | add hbitable space @ 1st floor to accomodate two (n) bedrooms & two (n) bathrooms. interior remodeling at 2nd floor w/kitchen & stairs relocating & add one (n) family room by relocating one bedroom to first floor.Details
add hbitable space @ 1st floor to accomodate two (n) bedrooms & two (n) bathrooms. interior remodeling at 2nd floor w/kitchen & stairs relocating & add one (n) family room by relocating one bedroom to first floor. | $75,000 |
| Jul 30, 2012 | Completed final sign-off Aug 2012 | 219 Crescent Av | add one full bath & 1/2 bath in non-conforming bedroom space. repair front stairs as needed.Details
add one full bath & 1/2 bath in non-conforming bedroom space. repair front stairs as needed. | $12,000 |