Kevin Lehane Construction
- Based in
- Walnut Creek
- On San Francisco permits
- Sep 2002 to Feb 2020
- Last 24 months
- 0 permits filed
131 permits since 2000: 70 completed, 33 never finaled, 28 expired or cancelled.
Of the 33 never-finaled permits, 2 are 5 to 10 years old, 31 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
4 roof deck permits: 3 completed, 1 never finaled. Typically 124 days from filing to permit and 1104 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 8, 2016 | Never finaled issued Feb 2017, no final | 328 Richland Av | complete interior remodel with structural upgrages. enclose (e) family room below at rear.2 new dormers, new roof deckDetails
complete interior remodel with structural upgrages. enclose (e) family room below at rear.2 new dormers, new roof deck | $400,000 |
| Nov 10, 2014 | Completed final sign-off Aug 2021 | 414 Missouri St | remodel & reconfigure 2 units house per plan. include 2 kitchens,(e)3 bathrooms. adding one new bathroom, roof deck and rear bay window on 3rd floor per plan. change all windows at front(total of 6).add washer/dryer for ea.unit. (no expansion of footprint or envelope).Details
remodel & reconfigure 2 units house per plan. include 2 kitchens,(e)3 bathrooms. adding one new bathroom, roof deck and rear bay window on 3rd floor per plan. change all windows at front(total of 6).add washer/dryer for ea.unit. (no expansion of footprint or envelope). | $41,000 |
| Sep 18, 2014 | Completed final sign-off Oct 2017 | 48 Hancock St | misc dry rot repair and voluntary partial garage foundation upgrade of an existing 1 story garage at gr level with roof deck. replace existing concrete stairs in kind. comply nov 201485587Details
misc dry rot repair and voluntary partial garage foundation upgrade of an existing 1 story garage at gr level with roof deck. replace existing concrete stairs in kind. comply nov 201485587 | $17,500 |
| Apr 23, 2013 | Completed final sign-off Jul 2015 | 1621 Powell St | renovate extg 2 story 2 unit residence. work includes remove interior walls and remodel per plans. upgrade structural as required. remodel 2 kitchens,2 baths, add one bath, replace all windows. small in fill deck at rear and new roof deck. revision to app#201302281173.Details
renovate extg 2 story 2 unit residence. work includes remove interior walls and remodel per plans. upgrade structural as required. remodel 2 kitchens,2 baths, add one bath, replace all windows. small in fill deck at rear and new roof deck. revision to app#201302281173. | $195,000 |