Ket Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2016 to Jun 2026
- Last 24 months
- 8 permits filed
35 permits since 2000: 29 completed, 5 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
8 stairs permits: 7 completed, 1 in progress. Typically 59 days from filing to permit and 297 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 24, 2026 | In progress issued Sep 2026 | 1683 21st Av | 2 story and 1 story lightwell infill on left south side.1 story lightwell infill north side. dryrot repair frnt stairs. gr fl:provide rms down consist of family rm,bedrm, bath, lndry rm. replce & relcate wtr hter & furnace in garage.2nd fl: relocate kitchen, remodel e bath. novs 202314806,202314741Details
2 story and 1 story lightwell infill on left south side.1 story lightwell infill north side. dryrot repair frnt stairs. gr fl:provide rms down consist of family rm,bedrm, bath, lndry rm. replce & relcate wtr hter & furnace in garage.2nd fl: relocate kitchen, remodel e bath. novs 202314806,202314741 | $85,000 |
| May 16, 2025 | Completed final sign-off Apr 2026 | 3936 21st St | ground fl: rebuild stair 2nd fl: remodel kitchen, relocate bath, infill light court, upgrade stairs to 1st fl, modify (e) rear roof deck. 3rd fl: remodel master bath & bath, infill light court. replace & upgrade windowsDetails
ground fl: rebuild stair 2nd fl: remodel kitchen, relocate bath, infill light court, upgrade stairs to 1st fl, modify (e) rear roof deck. 3rd fl: remodel master bath & bath, infill light court. replace & upgrade windows | $220,000 |
| Jul 11, 2023 | Completed final sign-off May 2024 | 2395 27th Av | repair wooden exterior stairway. less than 50%Details
repair wooden exterior stairway. less than 50% | $2,500 |
| Jul 27, 2021 | Completed final sign-off May 2022 | 1631 26th Av | revision to pa 2021-0524-0854 1st fl reconfigure layout, add 1 full bath. reconfigure interior stairsDetails
revision to pa 2021-0524-0854 1st fl reconfigure layout, add 1 full bath. reconfigure interior stairs | $2,000 |
| May 24, 2021 | Completed final sign-off May 2022 | 1631 26th Av | remodel (e) interior stair connecting basement to 2/f. remodel 1 bedroom, add a bathroom and laundry area, 1 family room.Details
remodel (e) interior stair connecting basement to 2/f. remodel 1 bedroom, add a bathroom and laundry area, 1 family room. | $50,000 |
| Apr 26, 2018 | Completed final sign-off Feb 2020 | 715 Sargent St | legalize (e) unauthorized dwelling unit, including (n) entry & skylight for light & ventilation. update entry stair for code conformance & legalize unpermitted shower & kitchen fixtures. legalization per ordinance 43-14.Details
legalize (e) unauthorized dwelling unit, including (n) entry & skylight for light & ventilation. update entry stair for code conformance & legalize unpermitted shower & kitchen fixtures. legalization per ordinance 43-14. | $15,000 |
| Oct 3, 2017 | Completed final sign-off May 2019 | 375 30th Av | 1st floor: add 2 bedrooms, 2 full baths, and media room. new patio.2nd floor: remodel kitchen and bath. reconfigure stairs and new deck at rear. 3rd floor: remodel bath and add one full bath. new cantilever deck at rear. 3 new dormers and infill at rear.Details
1st floor: add 2 bedrooms, 2 full baths, and media room. new patio.2nd floor: remodel kitchen and bath. reconfigure stairs and new deck at rear. 3rd floor: remodel bath and add one full bath. new cantilever deck at rear. 3 new dormers and infill at rear. | $85,000 |
| Feb 1, 2016 | Completed final sign-off Nov 2017 | 806 39th Av | 1/f- add one power, relocate kitchen, dining room, living room, 2/f- add 2 full bath, turn (e) living room into office, combine two (e) bathroom into one master bedroom, add one bedroom, remodel (e) full bath, relocate interior stair, in fill & match (e) lightwell.Details
1/f- add one power, relocate kitchen, dining room, living room, 2/f- add 2 full bath, turn (e) living room into office, combine two (e) bathroom into one master bedroom, add one bedroom, remodel (e) full bath, relocate interior stair, in fill & match (e) lightwell. | $70,000 |