Back to bathroom remodel contractors
Ket Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2016 to Jun 2026
- Last 24 months
- 8 permits filed
35 permits since 2000: 29 completed, 5 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
19 bathroom remodel permits: 15 completed, 4 in progress. Typically 42 days from filing to permit and 281 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 25, 2026 | In progress issued Jul 2026 | 3936 21st St | interior remodel converting on habitable 1st fl space into habitable spaces inlculding a bath, media, study, gym, and wine room. new window being installed on rear facade. the existing buildings gross floor area is not being modified. 836 sf of prev e occupied floor is being renovated.Details
interior remodel converting on habitable 1st fl space into habitable spaces inlculding a bath, media, study, gym, and wine room. new window being installed on rear facade. the existing buildings gross floor area is not being modified. 836 sf of prev e occupied floor is being renovated. | $100,000 |
| Jun 24, 2026 | In progress issued Sep 2026 | 1683 21st Av | 2 story and 1 story lightwell infill on left south side.1 story lightwell infill north side. dryrot repair frnt stairs. gr fl:provide rms down consist of family rm,bedrm, bath, lndry rm. replce & relcate wtr hter & furnace in garage.2nd fl: relocate kitchen, remodel e bath. novs 202314806,202314741Details
2 story and 1 story lightwell infill on left south side.1 story lightwell infill north side. dryrot repair frnt stairs. gr fl:provide rms down consist of family rm,bedrm, bath, lndry rm. replce & relcate wtr hter & furnace in garage.2nd fl: relocate kitchen, remodel e bath. novs 202314806,202314741 | $85,000 |
| Aug 15, 2025 | In progress issued Nov 2025 | 1638 11th Av | 1st floor: reconfiture storage and utility. 2nd flr: remodel kitchen. add family room and powder. 3rd flr: remodel bedroom and bathroom. add 1 bedroom office and laundry replace roof deck. new deck at rear. replace front windows.Details
1st floor: reconfiture storage and utility. 2nd flr: remodel kitchen. add family room and powder. 3rd flr: remodel bedroom and bathroom. add 1 bedroom office and laundry replace roof deck. new deck at rear. replace front windows. | $95,000 |
| May 16, 2025 | Completed final sign-off Apr 2026 | 3936 21st St | ground fl: rebuild stair 2nd fl: remodel kitchen, relocate bath, infill light court, upgrade stairs to 1st fl, modify (e) rear roof deck. 3rd fl: remodel master bath & bath, infill light court. replace & upgrade windowsDetails
ground fl: rebuild stair 2nd fl: remodel kitchen, relocate bath, infill light court, upgrade stairs to 1st fl, modify (e) rear roof deck. 3rd fl: remodel master bath & bath, infill light court. replace & upgrade windows | $220,000 |
| Feb 27, 2025 | Completed final sign-off Feb 2026 | 828 Cortland Av | residential ti to remodel (e) residential unit at 2nd floor. scope of work includes demo of non structrual interior partitions and remodel bedrooms, bathrooms, and kitchenDetails
residential ti to remodel (e) residential unit at 2nd floor. scope of work includes demo of non structrual interior partitions and remodel bedrooms, bathrooms, and kitchen | $120,000 |
| Mar 23, 2024 | In progress issued Dec 2025 | 2195 Quesada Av | legalization of an udu to state converted adu (three bedrooms, great room with kitchen, one bathroom and laundry closet). addressing of code enforcement case # 2021-011249enf. (e) garage converted to living area. curb cut infill. demo of unpermitted addition.Details
legalization of an udu to state converted adu (three bedrooms, great room with kitchen, one bathroom and laundry closet). addressing of code enforcement case # 2021-011249enf. (e) garage converted to living area. curb cut infill. demo of unpermitted addition. | $120,000 |
| Feb 7, 2024 | Completed final sign-off Oct 2024 | 190 Collins St | to remodel 4 units w/ 3 kitchens & 4 bathrooms. remodel at unit 190, 190a, 192, & 192a. (no kitchen remodel at unit 192a), no exterior work re-locate entrance door @ unit 192, adding and remodelling clossets all four units per plans.Details
to remodel 4 units w/ 3 kitchens & 4 bathrooms. remodel at unit 190, 190a, 192, & 192a. (no kitchen remodel at unit 192a), no exterior work re-locate entrance door @ unit 192, adding and remodelling clossets all four units per plans. | $100,000 |
| Sep 21, 2023 | Completed final sign-off Sep 2024 | 837 26th Av | 1st floor: add family, bedroom, full bath and power room. new wet bar and relocate laundry. 2nd floor: reconfigure (e) kitchen and bathroom per layout. add 1 full bath. nrew roof deck. infill north side lightwell (not visible from street) and new skylights.Details
1st floor: add family, bedroom, full bath and power room. new wet bar and relocate laundry. 2nd floor: reconfigure (e) kitchen and bathroom per layout. add 1 full bath. nrew roof deck. infill north side lightwell (not visible from street) and new skylights. | $180,000 |
| Jul 12, 2022 | Completed final sign-off Nov 2023 | 1646 34th Av | 1st/fl: add 1 bedroom, family rm, & full bathroom. 2nd/fl: remodel kitchen, bathroom, add office and full bathroom. total remodel.Details
1st/fl: add 1 bedroom, family rm, & full bathroom. 2nd/fl: remodel kitchen, bathroom, add office and full bathroom. total remodel. | $110,000 |
| Feb 10, 2022 | Completed final sign-off Jul 2022 | 2059 44th Av | remodel one kitchen and one bathroom. replacement in kind of kitchen cabinets, sink, countertop, tiles, toilet, bathtub, vanitities, switches, and recess light fixtures.Details
remodel one kitchen and one bathroom. replacement in kind of kitchen cabinets, sink, countertop, tiles, toilet, bathtub, vanitities, switches, and recess light fixtures. | $28,500 |
| Dec 24, 2021 | Completed final sign-off Mar 2022 | 2395 27th Av | unit 3: remodel kitchen and bathroom. replace cabinets, countertop and tiles. replace sink,toilet and vanity and bathtub. change subpanel to 60amp.Details
unit 3: remodel kitchen and bathroom. replace cabinets, countertop and tiles. replace sink,toilet and vanity and bathtub. change subpanel to 60amp. | $22,000 |
| Jul 27, 2021 | Completed final sign-off May 2022 | 1631 26th Av | revision to pa 2021-0524-0854 1st fl reconfigure layout, add 1 full bath. reconfigure interior stairsDetails
revision to pa 2021-0524-0854 1st fl reconfigure layout, add 1 full bath. reconfigure interior stairs | $2,000 |
| May 24, 2021 | Completed final sign-off May 2022 | 1631 26th Av | remodel (e) interior stair connecting basement to 2/f. remodel 1 bedroom, add a bathroom and laundry area, 1 family room.Details
remodel (e) interior stair connecting basement to 2/f. remodel 1 bedroom, add a bathroom and laundry area, 1 family room. | $50,000 |
| Oct 28, 2020 | Completed final sign-off Sep 2021 | 540 Page St | 2/f: remodel kitchen, bathrooms. add 1 full bath. 3/f: remodel bathroom and add wetbar.Details
2/f: remodel kitchen, bathrooms. add 1 full bath. 3/f: remodel bathroom and add wetbar. | $90,000 |
| Sep 17, 2018 | Completed final sign-off Jul 2019 | 215 Granada Av | lower level - add bathroom, 2 bedrooms and a family/media rm. replace (e) deck w/ 8 ft by 16 ft wood deck. 2nd level - remodel kitchen and 1 bathroom, add 1 bathroomDetails
lower level - add bathroom, 2 bedrooms and a family/media rm. replace (e) deck w/ 8 ft by 16 ft wood deck. 2nd level - remodel kitchen and 1 bathroom, add 1 bathroom | $50,000 |
| Oct 3, 2017 | Completed final sign-off May 2019 | 375 30th Av | 1st floor: add 2 bedrooms, 2 full baths, and media room. new patio.2nd floor: remodel kitchen and bath. reconfigure stairs and new deck at rear. 3rd floor: remodel bath and add one full bath. new cantilever deck at rear. 3 new dormers and infill at rear.Details
1st floor: add 2 bedrooms, 2 full baths, and media room. new patio.2nd floor: remodel kitchen and bath. reconfigure stairs and new deck at rear. 3rd floor: remodel bath and add one full bath. new cantilever deck at rear. 3 new dormers and infill at rear. | $85,000 |
| Feb 23, 2017 | Completed final sign-off Nov 2017 | 806 39th Av | revision to app#201602018532. 1st floor: add 2 bedrooms, family room, and 1 full bath. 2nd floor: remodel kitchen and bath and add 1 full bath. infill left and partial right lightwell. replace front 5 windows in kind with aluminum clad wood windows.Details
revision to app#201602018532. 1st floor: add 2 bedrooms, family room, and 1 full bath. 2nd floor: remodel kitchen and bath and add 1 full bath. infill left and partial right lightwell. replace front 5 windows in kind with aluminum clad wood windows. | |
| Mar 1, 2016 | Completed final sign-off Feb 2019 | 982 Randolph St | to comply with nov 201551992. gnd flr - legalize non warranted rooms: family room, bedroom and full bathroom. replace water heater per unit legalization ordinance 43-14. add 982 randolph st to 984 randolph st 7081a/019.Details
to comply with nov 201551992. gnd flr - legalize non warranted rooms: family room, bedroom and full bathroom. replace water heater per unit legalization ordinance 43-14. add 982 randolph st to 984 randolph st 7081a/019. | $40,000 |
| Feb 1, 2016 | Completed final sign-off Nov 2017 | 806 39th Av | 1/f- add one power, relocate kitchen, dining room, living room, 2/f- add 2 full bath, turn (e) living room into office, combine two (e) bathroom into one master bedroom, add one bedroom, remodel (e) full bath, relocate interior stair, in fill & match (e) lightwell.Details
1/f- add one power, relocate kitchen, dining room, living room, 2/f- add 2 full bath, turn (e) living room into office, combine two (e) bathroom into one master bedroom, add one bedroom, remodel (e) full bath, relocate interior stair, in fill & match (e) lightwell. | $70,000 |