Kerwin Rockwell Green Construction
- Based in
- Burlingame
- On San Francisco permits
- Sep 2010 to Jun 2013
- Last 24 months
- 0 permits filed
7 permits since 2000: 2 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 2 completed, 1 never finaled. Typically 126 days from filing to permit and 361 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 20, 2012 | Completed final sign-off Dec 2014 | 4331 23rd St | to comly with nov# 201273061. revision to pa# 2012/09/13/9667. remove & replace (e) stair in rear yard. new upper deck.Details
to comly with nov# 201273061. revision to pa# 2012/09/13/9667. remove & replace (e) stair in rear yard. new upper deck. | $8,000 |
| Nov 15, 2011 | Completed final sign-off Sep 2013 | 169 Nevada St | 2 story addition-interior remodel incl kitchen, bath, &reconfigurate 1/fl with new interior stair connect to 2/fl, raising roof & provide addition insulation. add dormer to northside of roof, repair areas of existing foundation. green point rated project.Details
2 story addition-interior remodel incl kitchen, bath, &reconfigurate 1/fl with new interior stair connect to 2/fl, raising roof & provide addition insulation. add dormer to northside of roof, repair areas of existing foundation. green point rated project. | $300,000 |
| Sep 15, 2010 | Never finaled issued Jan 2011, no final | 28 Elsie St | replace (e) winding stair with straight. add new ground floor master suite with full bath & laundry room @ rear of the (e) building. add roof deck on top of proposed addition @ rear of building.Details
replace (e) winding stair with straight. add new ground floor master suite with full bath & laundry room @ rear of the (e) building. add roof deck on top of proposed addition @ rear of building. | $125,000 |