Back to kitchen remodel contractors
Kerwin Rockwell Green Construction
- Based in
- Burlingame
- On San Francisco permits
- Sep 2010 to Jun 2013
- Last 24 months
- 0 permits filed
7 permits since 2000: 2 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 104 days from filing to permit and 571 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 15, 2011 | Completed final sign-off Sep 2013 | 169 Nevada St | 2 story addition-interior remodel incl kitchen, bath, &reconfigurate 1/fl with new interior stair connect to 2/fl, raising roof & provide addition insulation. add dormer to northside of roof, repair areas of existing foundation. green point rated project.Details
2 story addition-interior remodel incl kitchen, bath, &reconfigurate 1/fl with new interior stair connect to 2/fl, raising roof & provide addition insulation. add dormer to northside of roof, repair areas of existing foundation. green point rated project. | $300,000 |