Back to kitchen remodel contractors
Kent Deng
- Based in
- San Francisco
- On San Francisco permits
- May 2007 to Feb 2026
- Last 24 months
- 4 permits filed
38 permits since 2000: 35 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 6 completed. Typically 0 days from filing to permit and 234 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 14, 2024 | Completed final sign-off Sep 2025 | 196 Ocean Av | 1st flr/legalize full bath, bedrm. remove wet bar. add playroom, bdrm & 1/2bath. relocate wh-1. reloc. door @ rear. add(n)wdow @ rear & side. 2nd flr-remdl bathrm & kitchen, add(n)wdow @ bathrm, repl(e)wdows w/ fiberglass wdows in kind comply w/nov202429837.Details
1st flr/legalize full bath, bedrm. remove wet bar. add playroom, bdrm & 1/2bath. relocate wh-1. reloc. door @ rear. add(n)wdow @ rear & side. 2nd flr-remdl bathrm & kitchen, add(n)wdow @ bathrm, repl(e)wdows w/ fiberglass wdows in kind comply w/nov202429837. | $150,000 |
| Feb 8, 2024 | Completed final sign-off Feb 2025 | 3188 16th St | residential remodel on second floor. add full bathroom, remodel (e) bath, relocate kitchen sink. add closets.Details
residential remodel on second floor. add full bathroom, remodel (e) bath, relocate kitchen sink. add closets. | $38,000 |
| Apr 9, 2018 | Completed final sign-off Nov 2018 | 867 Foerster St | exterior wall siding change to stucco. interior remodel. remove 2 pocket doors at 1st floor. kitchen remodel and add island. remodel all 4 bathrooms. repair deck at 2nd flr. repair roof / deck in-kind at 3rd flr. relocate furnace from basement to 2nd flr. relocate water heater to garage 2.Details
exterior wall siding change to stucco. interior remodel. remove 2 pocket doors at 1st floor. kitchen remodel and add island. remodel all 4 bathrooms. repair deck at 2nd flr. repair roof / deck in-kind at 3rd flr. relocate furnace from basement to 2nd flr. relocate water heater to garage 2. | $50,000 |
| Apr 6, 2018 | Completed final sign-off Feb 2019 | 1858 38th Av | remodel kitchen and 3 1/2 bathrooms - add lights and outlets. like to like. 130 sq ft. bathroom 260 sq ftDetails
remodel kitchen and 3 1/2 bathrooms - add lights and outlets. like to like. 130 sq ft. bathroom 260 sq ft | $50,000 |
| Mar 9, 2012 | Completed final sign-off Apr 2012 | 2947 Anza St | replace 1 kitchen and 1 bathroom. lighting to comply with cec 150(k)Details
replace 1 kitchen and 1 bathroom. lighting to comply with cec 150(k) | $18,239 |
| Feb 19, 2009 | Completed final sign-off Mar 2009 | 2027 31st Av | remove & replace new kitchen. replace cabinet, sink, appliance, floor tile, lighting & upgrade area 11x12.Details
remove & replace new kitchen. replace cabinet, sink, appliance, floor tile, lighting & upgrade area 11x12. | $19,702 |