Back to bathroom remodel contractors
Kent Deng
- Based in
- San Francisco
- On San Francisco permits
- May 2007 to Feb 2026
- Last 24 months
- 4 permits filed
38 permits since 2000: 35 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 11 completed, 1 never finaled, 1 expired or cancelled. Typically 3 days from filing to permit and 221 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 28, 2025 | Completed final sign-off Sep 2025 | 196 Ocean Av | revision to pa #202411145030. add new window at new 1st floor bathroom. removed window at west wall in new bedroom. change tank water heater to tankless water heater. change existing central heating system to mini split heat pump system. change layout of laundry @ 2nd floorDetails
revision to pa #202411145030. add new window at new 1st floor bathroom. removed window at west wall in new bedroom. change tank water heater to tankless water heater. change existing central heating system to mini split heat pump system. change layout of laundry @ 2nd floor | $20,000 |
| Nov 14, 2024 | Completed final sign-off Sep 2025 | 196 Ocean Av | 1st flr/legalize full bath, bedrm. remove wet bar. add playroom, bdrm & 1/2bath. relocate wh-1. reloc. door @ rear. add(n)wdow @ rear & side. 2nd flr-remdl bathrm & kitchen, add(n)wdow @ bathrm, repl(e)wdows w/ fiberglass wdows in kind comply w/nov202429837.Details
1st flr/legalize full bath, bedrm. remove wet bar. add playroom, bdrm & 1/2bath. relocate wh-1. reloc. door @ rear. add(n)wdow @ rear & side. 2nd flr-remdl bathrm & kitchen, add(n)wdow @ bathrm, repl(e)wdows w/ fiberglass wdows in kind comply w/nov202429837. | $150,000 |
| Feb 8, 2024 | Completed final sign-off Feb 2025 | 3188 16th St | residential remodel on second floor. add full bathroom, remodel (e) bath, relocate kitchen sink. add closets.Details
residential remodel on second floor. add full bathroom, remodel (e) bath, relocate kitchen sink. add closets. | $38,000 |
| Mar 16, 2021 | Completed final sign-off May 2021 | 2282 22nd Av | remolding bathroom and wet bar on ground floor. no change to wall and opening layout.Details
remolding bathroom and wet bar on ground floor. no change to wall and opening layout. | $20,000 |
| Aug 27, 2019 | Completed final sign-off Jan 2020 | 45 Mclaren Av | revision to app#201810153182 at basement, reconfigure floor layout per plan. relocate bathroom and remove utility room from approved plan. remove post and install beamDetails
revision to app#201810153182 at basement, reconfigure floor layout per plan. relocate bathroom and remove utility room from approved plan. remove post and install beam | $1,000 |
| Oct 15, 2018 | Completed final sign-off Jan 2020 | 45 Mclaren Av | at basement, relocate (e) bathroom and laundry, add new playroom and sauna rooms w/ shower, replace (e) concrete slabDetails
at basement, relocate (e) bathroom and laundry, add new playroom and sauna rooms w/ shower, replace (e) concrete slab | $49,000 |
| Apr 9, 2018 | Completed final sign-off Nov 2018 | 867 Foerster St | exterior wall siding change to stucco. interior remodel. remove 2 pocket doors at 1st floor. kitchen remodel and add island. remodel all 4 bathrooms. repair deck at 2nd flr. repair roof / deck in-kind at 3rd flr. relocate furnace from basement to 2nd flr. relocate water heater to garage 2.Details
exterior wall siding change to stucco. interior remodel. remove 2 pocket doors at 1st floor. kitchen remodel and add island. remodel all 4 bathrooms. repair deck at 2nd flr. repair roof / deck in-kind at 3rd flr. relocate furnace from basement to 2nd flr. relocate water heater to garage 2. | $50,000 |
| Apr 6, 2018 | Completed final sign-off Feb 2019 | 1858 38th Av | remodel kitchen and 3 1/2 bathrooms - add lights and outlets. like to like. 130 sq ft. bathroom 260 sq ftDetails
remodel kitchen and 3 1/2 bathrooms - add lights and outlets. like to like. 130 sq ft. bathroom 260 sq ft | $50,000 |
| May 2, 2017 | Never finaled issued May 2017, no final | 554 Clement St | heating and ventilation repair and upgrade painting and resurfacing flooring. paint bathroom and smooth textured sheetrock walls. add tiling on top of linoleum flooring. repair cracks in wall. repair cracks in teh staircase in the yard area in the back of the building.Details
heating and ventilation repair and upgrade painting and resurfacing flooring. paint bathroom and smooth textured sheetrock walls. add tiling on top of linoleum flooring. repair cracks in wall. repair cracks in teh staircase in the yard area in the back of the building. | $5,500 |
| Aug 19, 2016 | Completed final sign-off Jul 2021 | 462 34th Av | legalize (e) units in ground floor per ordinance# 43-14. 2 bedrooms & 2 bath.Details
legalize (e) units in ground floor per ordinance# 43-14. 2 bedrooms & 2 bath. | $2,000 |
| Feb 19, 2016 | Expired or cancelled expired Feb 2020 | 771 Corbett Av | revision to 201509237838. remove bathtub at basement bathroom, reconfigure plumbing fixtures, adjust interior stair location and adjust other rooms dimension accodingly due to stair relocation, new skylight. change door/window style at rearDetails
revision to 201509237838. remove bathtub at basement bathroom, reconfigure plumbing fixtures, adjust interior stair location and adjust other rooms dimension accodingly due to stair relocation, new skylight. change door/window style at rear | $100 |
| Sep 28, 2012 | Completed final sign-off Oct 2012 | 431 23rd Av | repair bath tub in #2/ replace bath tub only, no change to fixtures, replace counter top with granite, repl sink and faucetDetails
repair bath tub in #2/ replace bath tub only, no change to fixtures, replace counter top with granite, repl sink and faucet | $1,500 |
| Mar 9, 2012 | Completed final sign-off Apr 2012 | 2947 Anza St | replace 1 kitchen and 1 bathroom. lighting to comply with cec 150(k)Details
replace 1 kitchen and 1 bathroom. lighting to comply with cec 150(k) | $18,239 |