Back to kitchen remodel contractors
Kenneth Zhu Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2008 to Jan 2026
- Last 24 months
- 4 permits filed
11 permits since 2000: 9 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 4 completed, 1 in progress. Typically 0 days from filing to permit and 108 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 22, 2026 | In progress issued Feb 2026 | 38 Colby St | remodel (e) kitchen, 1 (e) bathroom, & add 1 new full bath. all work on 2/f.Details
remodel (e) kitchen, 1 (e) bathroom, & add 1 new full bath. all work on 2/f. | $75,000 |
| Feb 18, 2022 | Completed final sign-off Jun 2022 | 485 Oak St | 1. remodel bathroom, replace bathroom window 2. remodel kitchen- tiling floor, new cabinet 3. replace subpanel for new gfci receptical.Details
1. remodel bathroom, replace bathroom window 2. remodel kitchen- tiling floor, new cabinet 3. replace subpanel for new gfci receptical. | $30,000 |
| Dec 13, 2017 | Completed final sign-off May 2018 | 275 Stanyan St | remodel of (e) kitchen at 2nd floor. new opening in load bearing wall with posts beams and footings down to ground floor. ele & plm in kitchenDetails
remodel of (e) kitchen at 2nd floor. new opening in load bearing wall with posts beams and footings down to ground floor. ele & plm in kitchen | $75,000 |
| May 20, 2011 | Completed final sign-off Aug 2011 | 669 Shrader St | remodel kitchen and bathroom.Details
remodel kitchen and bathroom. | $18,000 |
| Apr 14, 2008 | Completed final sign-off Dec 2008 | 1445 Fulton St | to be remodeling (1) kitchen, (2) bathrooms, (1) laundry room. rewiring per floor and for all (3) units. replacement 55 windows at rear of bldg. not visible from street. remove sheetrocks in above work are <50%, no seismic upgraded needed.Details
to be remodeling (1) kitchen, (2) bathrooms, (1) laundry room. rewiring per floor and for all (3) units. replacement 55 windows at rear of bldg. not visible from street. remove sheetrocks in above work are <50%, no seismic upgraded needed. | $99,000 |