Block 1166, lot 002B
275 Stanyan St
- City’s use
- Single Family Residential
- Built
- 1939
- Stories
- 1
- Units
- 1
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 1,550 sq ft
- Lot
- 1,950 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 19, 2025 | Completed final sign-off Sep 2025 | 275 Stanyan St | Rapid Flow Plumbing & Rooter Inc | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $10,980 |
| Dec 13, 2017 | Completed final sign-off May 2018 | 275 Stanyan St | Kenneth Zhu Construction | remodel of (e) kitchen at 2nd floor. new opening in load bearing wall with posts beams and footings down to ground floor. ele & plm in kitchenDetails
remodel of (e) kitchen at 2nd floor. new opening in load bearing wall with posts beams and footings down to ground floor. ele & plm in kitchen | $75,000 |
| Sep 25, 2007 | Completed final sign-off Apr 2008 | 275 Stanyan St | partial remodel to existing 960 sq. ft. ground floor garage into living room, bedroom & bathroom. new lighting, electrical & plumbing. 1hr. partition between garage & living space. new deck in rear yard @ less than 10' above grade. w/stair, new doors @ deck, 1hr. property line wall @ rear.Details
partial remodel to existing 960 sq. ft. ground floor garage into living room, bedroom & bathroom. new lighting, electrical & plumbing. 1hr. partition between garage & living space. new deck in rear yard @ less than 10' above grade. w/stair, new doors @ deck, 1hr. property line wall @ rear. | $80,000 | |
| Jun 19, 2006 | Completed final sign-off Jul 2006 | 275 Stanyan St | Level 8 Construction Inc | repair drainage pipe in garage door, repair concrete slab after. no structural work.Details
repair drainage pipe in garage door, repair concrete slab after. no structural work. | $2,000 |
| Jan 25, 2006 | Completed final sign-off Apr 2006 | 275 Stanyan St | Level 8 Construction Inc | remove kitchen & bath. relocate stove. regrigeration sink. new fixtures.@2nd floor. new lighting all florescent. no structural work.Details
remove kitchen & bath. relocate stove. regrigeration sink. new fixtures.@2nd floor. new lighting all florescent. no structural work. | $15,000 |
| Jun 13, 2005 | Completed final sign-off Jul 2005 | 275 Stanyan St | Asap Roofing | reroofing.Details
reroofing. | $4,700 |
| Jun 3, 2005 | Completed final sign-off Jun 2005 | 275 Stanyan St | Adan Flores General Contractor | repair 5 items from termite & dryrot damaged items 1,2,3,5 termite by markoff structurl dated 3/21/Details
repair 5 items from termite & dryrot damaged items 1,2,3,5 termite by markoff structurl dated 3/21/ | $3,200 |
| May 19, 2005 | Completed final sign-off Jun 2005 | 275 Stanyan St | Pat Crowley Construction | cap (15)liner feet of foundation 6" cap.new mudsill with 5/8 anchow boltsDetails
cap (15)liner feet of foundation 6" cap.new mudsill with 5/8 anchow bolts | $5,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Level 8 Construction Inc (2), Adan Flores General Contractor, Asap Roofing, Kenneth Zhu Construction, Pat Crowley Construction, Rapid Flow Plumbing & Rooter Inc
- Architects
- Carl Scheidenhelm, Carl Scheidentelm
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.